A development budget is not a number the sponsor hands the lender. It is a hypothesis about cost that a feasibility study must test against three independent standards: completeness, benchmark evidence and the value of what gets built. This is how that test is run, line by line, for the seven asset classes that dominate SBA, USDA and community-bank construction lending in 2026.
A development budget is not a number the sponsor hands the lender. It is a hypothesis about cost that a feasibility study must test against three independent standards: completeness, benchmark evidence and the value of what gets built. This is how that test is run, line by line, for the seven asset classes that dominate SBA, USDA and community-bank construction lending in 2026.
Why the denominator decides feasibility
Most feasibility studies spend their analytical capital on the numerator. They build demand, model revenue, rationalize operating expenses and derive a stabilized net operating income. The development budget, by contrast, is frequently accepted as delivered: a contractor estimate, a franchisor prototype figure or a sponsor spreadsheet, carried into the sources-and-uses table without challenge.
That asymmetry is backwards. Every coverage ratio, every loan-to-cost calculation, every equity injection test and every return metric in the study is a ratio with project cost in the denominator. An understated budget does not merely weaken one assumption. It inflates every downstream conclusion simultaneously, and it does so in the direction the borrower prefers.
Federal bank supervisors frame the issue with unusual directness. The OCC Comptroller's Handbook on Commercial Real Estate Lending states that the economic purpose of developing a property is to create value greater than the project's cost, and that a development lacking that incentive is generally not feasible. It adds that construction costs which closely approach or exceed the expected value of the project's income generally indicate infeasibility, and that cost increases do not necessarily produce increases in value.
The practical consequence is that budget rationalization is not an engineering exercise appended to a market study. It is the test that converts a market study into a feasibility conclusion. A project with robust demand and a defensible pro forma can still fail if the capital required to deliver it exceeds what the completed asset is worth, or what its cash flow can carry.
In late 2026 that test is harder to pass than at any point since 2022. The Associated Builders and Contractors analysis of BLS producer price data shows construction input prices up 11.2% year over year through September 2026, the largest annual increase in nearly four years. Selling-price indices, which measure what owners actually pay, are running materially lower: Turner's Building Cost Index rose 5.49% year over year in Q3 2026 and Rider Levett Bucknall's index 4.45%. That gap is contractor margin being absorbed, and it will not be absorbed indefinitely.
This article sets out the methodology Union Metric applies to development budgets across asset classes. It covers the cost hierarchy a complete budget must contain, the benchmarking methods a reviewer should weight, contingency and escalation in the current cost environment, the cost-versus-value test, and the regulatory treatment under SBA and USDA programs. It then applies that framework to gas stations, truck stops, car washes, hotels, RV parks, RV and boat storage, and self-storage, with the benchmarks, the methodological traps and the red flags specific to each.
It is the capital-cost companion to our earlier series on rationalizing operating expenses for car wash, gas station and truck stop pro formas. Read together, the two complete the underwriting chain: what the asset costs, what it earns, what it spends, and whether the difference supports the debt.
The cost hierarchy: what a complete development budget contains
The first test is completeness. A budget can be priced correctly line by line and still be wrong in total, because the lines that are missing are invisible to anyone comparing the lines that are present. The reviewer's first task is therefore taxonomic: confirm that every category of cost the project will actually incur appears somewhere in the uses of funds, classified correctly.
The OCC's supervisory definitions are the reference point most lenders adopt. Hard costs comprise on-site and off-site improvements, building construction, general conditions, the general contractor's fee, and items normally inside a construction contract such as bonding and contractor insurance. Soft costs comprise interest and other development costs, including fees and predevelopment expenses. Interest or preferred returns payable to equity partners, and the developer's general corporate overhead, are excluded from the construction budget.
The most granular published taxonomy for an operating-business asset comes from the HVS U.S. Hotel Development Cost Survey 2026, which groups cost into land, hard costs and site improvements, soft costs, FF&E, pre-opening and working capital, and developer fee. Union Metric uses an extended version of that structure across all asset classes:
| Category | What it includes | Regulatory treatment | Reviewer's question |
|---|---|---|---|
| Land and acquisition | Price, closing, title, survey, Phase I/II, entitlement | USDA B&I eligible (§5001.121(c)(1)); 504 eligible with holding-period rules | Is the land basis cost or appraised value, and does the program allow the difference? |
| Site work | Grading, utilities, paving, stormwater, offsite improvements | OCC hard cost | Is site work scoped to the civil drawings or to a placeholder? |
| Vertical hard costs | GC contract, subcontracts, general conditions, GC fee, bonds, builder's risk | OCC hard cost | Does the contract sum reconcile to a schedule of values? |
| Equipment and FF&E | Process equipment, tunnel packages, fuel systems, kitchens, furniture, technology | 504 eligible (10-year useful life convention); USDA §5001.121(c)(3) | Are quotes dated, installed, freighted and post-tariff? |
| Soft costs | A&E, permits, impact and tap fees, legal, appraisal, feasibility, insurance, taxes during construction, loan fees | 504 professional fees (13 CFR 120.882(c)); USDA §5001.121(c)(9) to (10) | Do soft costs clear the floor for the asset class? |
| Developer fee | Project management compensation | OCC: typically not above 4% of project cost; USDA bars related-party profit (§5001.122(a)) | Is a related-party fee being financed with guaranteed proceeds? |
| Contingency | Hard, soft and escalation reserves | OCC 5 to 10%; 504 policy cap 15% of construction cost | Is contingency sized to design stage and kept in separate lines? |
| Construction-period interest | Interest on drawn balance, reserve, extension fees | 504 interim financing (120.882(d)); USDA §5001.121(c)(11) | Is carry modeled on a draw curve through ramp-up? |
| Pre-opening | Hiring, training, marketing, initial supplies, franchise opening fees | USDA startup costs (§5001.121(c)(4)) | Is it sized to the operator's ramp, not a percentage plug? |
| Initial working capital | Operating reserve to breakeven | USDA permanent working capital term loan; 504 excludes (except residual contingency refund) | Does it cover months-to-breakeven plus debt service? |
Three categories account for most completeness failures in practice. Site work on greenfield rural pads is chronically under-scoped, because it is the line most often carried as an allowance before civil engineering is complete. Union Metric's working range is 8 to 20% of hard cost on greenfield commercial pads, and higher for travel centers and car washes with heavy utility and stormwater scope.
Soft costs are the second. HVS data put soft costs at 11 to 18% of total development cost across hotel segments in 2026. A select-service or limited-service hotel budget showing soft costs well below 10% almost certainly omits financing costs, contingency or both, and the same logic extends to other operating-business real estate.
The third is the ramp. Pre-opening and initial working capital are the lines a sponsor is most tempted to omit, because they fund nothing visible. Yet startups rarely fail during construction. They fail during ramp-up, when the building is complete, the interest reserve is exhausted and revenue has not yet reached the level the pro forma assumed. HVS medians of 1 to 2% for pre-opening and working capital are a floor for branded hotels with franchisor support, not a target for an independent operator.
One structural point deserves emphasis. The developer fee and the developer's profit are different things. The OCC describes the fee as compensation for managing the project, typically not exceeding 4% of project cost. Profit is the spread between value and cost, and it should be funded by sales, by completion and lease-up, or by term financing, not by construction loan proceeds before value has been created. A budget that embeds profit as a line item is presenting a value conclusion as a cost.
Four benchmarking methods and how a reviewer weights them
The second test is independence. A budget prepared by the contractor who will build the project, or by the sponsor who needs the loan, is advocacy until something independent corroborates it. The OCC is explicit that feasibility work commissioned by the borrower may be biased and should be critically reviewed. Four methods supply that corroboration, and each has a characteristic failure mode.
Marshall & Swift (Cotality)
Marshall & Swift, now under the Cotality brand that succeeded CoreLogic, produces replacement or reproduction cost from base costs by occupancy and construction class, adjusted by current and local multipliers. Its base cost represents the statistically averaged cost of all buildings of a given class and occupancy nationally. Its strength is independence and national consistency, and it is the method appraisers use in the cost approach.
Its weaknesses are specific. Some indirect costs, notably architect's fees, are embedded in the base cost, so a reviewer who adds a separate A&E line to an M&S figure double counts. National averages miss special-purpose fit-out entirely: car wash tunnels, fuel systems and commercial kitchens must be priced separately. And in a market where inputs rose 11.2% in twelve months, published multipliers can trail live bid pricing.
RSMeans (Gordian)
RSMeans comprises more than 92,000 unit costs, 21,000 assemblies and 140 square-foot models, with line items updated annually and City Cost Index adjustments quarterly. Its value is granularity. Because it follows the CSI MasterFormat structure, a reviewer can re-price a contractor's schedule of values division by division.
Gordian's own guidance states that a square-foot estimate is typically accurate within plus or minus 20%, and an assemblies estimate within plus or minus 15%. Square-foot models are therefore concept-grade tools. They also do not capture local market tightness, such as bid-day competition and contractor backlog, which the selling-price indices from Turner and RLB do.
Contractor bids
The contractor bid is the only method that reflects the market on bid day, and the OCC expects budgets to be reviewed by a qualified individual and encourages fixed-price contracts. Where borrower and contractor are related, the contract should be cost-plus-fee with a guaranteed maximum price.
But a single negotiated bid is a price, not a benchmark. Its most dangerous feature is what it excludes. Site utilities beyond five feet of the building, permits, testing, low-voltage systems and FF&E installation are routinely carved out of general contractor scope and migrate silently to the owner. A bid is only as useful as the exclusion-by-exclusion reconciliation that accompanies it.
Completed-project comparables and unit metrics
Appraisers extract cost and entrepreneurial profit from sales of newly built properties, and asset-specific unit metrics are the common language of screening: cost per key for hotels, per site for RV parks, per net rentable square foot for self-storage, per tunnel foot for car washes, per multi-product dispenser for fuel. Hotels are the only class with a rigorous published national dataset. For the others, unit benchmarks are practitioner ranges and must be labeled as such.
Weighting by design stage
The right method depends on how much of the project has actually been designed. Estimate accuracy is governed by scope definition, not by effort. AACE International's recommended practice for building construction (RP 56R-08) places a Class 5 conceptual estimate at minus 20 to 30% and plus 30 to 50%, and a Class 1 estimate at minus 3 to 5% and plus 3 to 10%. Union Metric weights the evidence accordingly:
| Design stage | Primary method | Cross-check | Weight on contractor number |
|---|---|---|---|
| Concept or schematic (AACE Class 5 to 4) | M&S or RSMeans square-foot model; unit comparables | HVS or other surveys | Low: a contractor rough order of magnitude is advocacy |
| Design development (Class 3) | RSMeans assemblies re-price; unit comparables | M&S calculator | Moderate |
| Construction documents with GMP or stipulated sum (Class 2 to 1) | Two or more contractor bids | RSMeans re-price of the top ten cost divisions; M&S total | High, conditional on scope reconciliation |
A budget passes when the bid lands within the reviewer's independent range and every material exclusion is carried elsewhere. A bid above the range is not disqualifying if it is explained by site conditions or tariff-exposed packages. A bid materially below the range is the more dangerous signal, because it predicts change orders, and change orders on a construction loan are funded either by contingency the project needed for something else or by borrower liquidity the lender assumed was not required.
Contingency, escalation and the 2024 to 2026 cost environment
The third test is risk allowance. Contingency is not padding. It is the priced expression of the reviewer's uncertainty about the estimate, and it should shrink as design matures and grow with renovation scope, site uncertainty and market volatility.
Contingency norms
The OCC notes that contingency allowances usually range between 5 and 10% of the overall budget, and it draws an important line: contingency covers reasonable but unexpected increases, while overruns resulting from poor projections or management should ordinarily be covered by the borrower rather than drawn from the loan's contingency budget. The AIA's owner guidance places design contingency at 5 to 10% of construction cost and insists it be an additional amount, not created by reducing the project budget.
Union Metric's standard for lender studies in late 2026 is structured by design stage:
| Condition | Hard-cost contingency | Notes |
|---|---|---|
| GMP or stipulated sum on complete construction documents | At least 5% | Bid reconciled to an independent range |
| Design development | 10% | Assemblies-level re-price completed |
| Schematic design | 15% | At the SBA 504 policy cap |
| Any renovation, conversion or adaptive reuse | 15% minimum | Owner contingency of 15 to 25% common in practice |
| Conceptual or feasibility stage, no design | 15 to 25% | Study should state the estimate class explicitly |
Two structural rules accompany the percentages. Soft-cost contingency is carried separately at 5 to 10% of soft costs, never pooled with hard contingency. And escalation is carried as its own line whenever the contract is not fixed-price or the buyout of tariff-exposed packages is incomplete. Pooling the three conceals which risk is consuming the reserve, and the draw history then cannot tell the lender whether the project has a pricing problem, a scope problem or a management problem.
The input-price squeeze
The cost environment of 2026 is defined by a widening gap between what contractors pay and what they charge. ABC's analysis of BLS producer price data shows construction input prices rising 3.1% year over year in February 2026, 7.0% in April, 9.6% in May, 8.9% in August and 11.2% in September. ABC attributes the September surge partly to fuel prices and notes that tariffed materials, including iron, copper and other metal products, continue to rise rapidly.
Selling-price indices have moved far less. Turner's Building Cost Index stood at 1,575 in Q3 2026, up 5.49% year over year. RLB recorded 4.45% annual growth and its highest quarterly increase in two years. In late 2025, input inflation of 3.6% against bid-price inflation of 2.7% meant contractors were absorbing cost. With inputs running near 11%, that cushion is exhausted, and the catch-up will appear in 2027 guaranteed maximum prices.
Union Metric's position is that every budget should be escalated at no less than the selling-price trend, approximately 5% a year, from the estimate date to the midpoint of construction. Tariff-exposed packages should carry package-specific escalation or be secured through a firm-price buyout before closing.
Tariff mechanics
The Section 232 regime is now the single most important variable in equipment-intensive budgets. Steel and aluminum tariffs rose from 25% to 50% in June 2025, and a 50% tariff on copper-containing products followed in August 2025. Under the structure reported by AGC as of spring 2026, items made entirely or mostly of steel, aluminum or copper carry 50%; derivatives substantially made of those metals carry 25% on full product value; industrial and electrical grid equipment containing them carries 15%; and foreign products made with entirely U.S. metal carry 10%.
The implication for a reviewer is direct. Switchgear, transformers, rooftop HVAC units, car wash tunnel equipment, fuel dispensers, steel canopies and commercial kitchen packages fall into the 15 to 25% derivative and equipment tiers. Domestic producers have raised prices in step. Any equipment priced from list sheets dated before April 2026 should be re-quoted, and any budget priced before mid-2026 without an escalation line should be presumed understated.
Labor
Average hourly earnings for construction production and nonsupervisory workers rose 5.2% between July 2025 and July 2026, against 3.2% for the private sector overall. In March 2026 construction earnings were $38.62 an hour, 20.4% above the private-sector average. Construction unemployment stood at 3.1% in Q3 2026, and Turner identifies skilled mechanical and electrical labor as the industry's biggest constraint.
MEP-intensive assets therefore face labor escalation above the headline: hotels, car washes and travel centers with large electrical and mechanical scopes. Rural projects financed through USDA programs can face a further mobilization premium when trades are drawn toward data center and manufacturing megaprojects in the Midwest and Southeast.
The cost-versus-value test and entrepreneurial incentive
The fourth test is the one that decides feasibility. A budget can be complete, independently benchmarked and properly reserved, and the project can still be infeasible, because the market will not pay for what the budget buys. The OCC states the principle in three sentences that every study should carry: construction costs closely approaching or exceeding expected value generally indicate infeasibility; cost increases do not necessarily increase value; and a budget with modest or no developer profit leaves inadequate room for overruns.
The supervisory logic extends to default. If the lender forecloses on an incomplete project, the absence of profit available to a prospective purchaser complicates disposition. A project that only works at cost has no buyer at cost, and the collateral is worth what a buyer would pay to finish it and earn a return.
Incentive versus profit
*The Appraisal of Real Estate* distinguishes entrepreneurial incentive, the forward-looking profit an entrepreneur expects for coordination, risk and time, from entrepreneurial profit, the historic fact of what was actually earned. Incentive belongs in the cost approach. It also explicitly recognizes that an owner-occupant may treat additional operating profit, long-term control or ownership itself as adequate incentive to develop.
That qualification matters enormously for SBA and USDA lending, which is dominated by owner-operators. No Appraisal Institute publication fixes a percentage for incentive, and published market extractions are thin. Union Metric's position is that for owner-occupied special-purpose assets, market-derived incentive is frequently zero. When it is, feasibility rests on the operating business's coverage, not on a value-over-cost spread, and the study must say so explicitly rather than plug a conventional 10 to 15%.
Defining and presenting the feasibility gap
The feasibility gap is total project cost, including contingency, interest carry and pre-opening, less the prospective market value at the date the lender sizes on, as complete or as stabilized. A lender-grade study presents it three ways:
- Value-over-cost ratio at both the as-complete and as-stabilized dates.
- Gap funding test: whether borrower equity plus any subordinate or grant capital covers the gap and the program's minimum injection simultaneously, without counting the same dollars twice.
- Loan-to-cost against loan-to-value: the OCC notes that prudent policies set limits as a percentage of both, with a supervisory LTV limit of 80% for commercial construction. Where value sits below cost, LTV binds, and the required equity rises above the program minimum.
Obsolescence on day one
Appraisal practice recognizes that external and functional obsolescence can exist the day a new building opens: a design the market does not reward, or a location where the improvement's full cost is not recoverable. The OCC observes that specialized properties are less marketable and harder to liquidate. SBA operationalizes the concern through the higher 504 borrower contribution for limited or special-purpose property.
This creates a methodological trap. For car washes, hotels, fuel sites and similar assets, the cost approach overstates market value at completion unless the appraiser deducts external obsolescence derived from income or sales evidence. A feasibility study that reconciles the budget to a cost-approach value without that deduction is circular: it validates cost with cost. Union Metric's standard is to reconcile the budget to the income approach for operating-business real estate and to report the implied external obsolescence, cost less income value, as a disclosed figure.
Regulatory treatment: SBA and USDA
Program rules do not tell a reviewer what a project should cost. They tell the reviewer which costs can be financed, how much contingency can be carried and how much equity must sit beneath the debt. Because injection requirements are expressed as a percentage of total project cost, every dollar added to a budget raises the required equity proportionally, which is why the budget and the capital structure must be tested together.
Which SBA SOP governs
SOP 50 10 8 has been effective since June 1, 2025. SBA issued SOP 50 10 8.1 on August 14, 2026, then superseded it before it took effect with SOP 50 10 8.1 *with Technical Policy Updates*, published September 25, 2026 under Information Notice 5000-882227 and effective October 1, 2026. NAGGL reads the revised SOP as applying to loans receiving SBA loan numbers on or after October 1, 2026, with earlier-numbered loans remaining under SOP 50 10 8. Several secondary readers key applicability to applications received on or after that date. Files straddling the transition should be confirmed against the notice text, and section citations from SOP 50 10 8 should be re-verified, because 8.1 reorganized material into new appendices.
SBA 504: contingency and contribution
The regulation, 13 CFR 120.882, lists eligible project costs: costs directly attributable to the project, a construction contingency not exceeding 10% of construction cost, professional fees essential to the project, and repayment of interim financing including points, fees and interest. SBA policy now runs ahead of the regulation. Procedural Notice 5000-872764, effective September 30, 2025, raised the 504 construction contingency to 15% of construction costs and allows up to 2% of unused residual contingency to be refunded to the borrower as working capital. A study should cite both figures and state that the SOP governs operationally.
| 504 project profile | Third-party lender | CDC debenture | Borrower contribution |
|---|---|---|---|
| Standard | At least 50% | Up to 40% | At least 10% |
| New business (two years or less) or limited/special-purpose property | At least 50% | Up to 35% | At least 15% |
| New business and special-purpose property | At least 50% | Up to 30% | At least 20% |
Gas stations, car washes, hotels and RV parks are routinely treated as special-purpose. A new-business car wash therefore requires 20% of total project cost from the borrower, and a 10% budget overrun discovered after closing raises the required injection by two full points of the original budget, before any lender re-underwriting.
SBA 7(a): construction provisions
Under SOP 50 10 8, the construction-cost threshold for automatic waiver of performance and payment bonds, builder's risk and workers' compensation requirements fell from $500,000 to $350,000. Above that threshold, a 100% payment and performance bond is required, or an approved alternative such as third-party construction monitoring with funds control. SOP 50 10 8 also imposed a 10% minimum equity injection for startups. Carry-forward of these provisions into 8.1 should be verified against the operative text.
USDA: 7 CFR Part 5001
The OneRD guaranteed loan rule lists eligible B&I uses in §5001.121(c), including purchase and development of land, buildings and infrastructure; machinery and equipment; startup costs and working capital as a permanent working capital term loan; professional fees the Agency approves as reasonable and customary; feasibility studies; and interest during construction until the first principal payment or until the facility is income-producing, whichever is earlier.
The ineligible-use rule in §5001.122(a) is the provision most budgets violate. Where a contractor or service provider is related to the borrower, guaranteed funds may pay only documented costs, with no profit, overhead or wages to the related party. A related-party developer fee or GC markup is therefore not financeable with B&I proceeds. The study must strip it from the eligible-cost base or show it funded by equity.
Equity under §5001.105(d), as amended in December 2025, is at least 10% for existing businesses, at least 20% balance-sheet equity or 25% of eligible project cost for most new businesses, and at least 25% for a new business on a construction project where the guarantee is requested before completion. The Agency may require more for higher-risk loans and explicitly considers the strength of the feasibility study in doing so.
An independent feasibility study is required for B&I guaranteed loans above $1 million to a new business, and Appendix A's technical feasibility component is where budget rationalization lives. Reviewers expect site suitability, construction schedule, contractor qualifications and cost validation to be demonstrated rather than asserted.
Supervisory expectations during construction
The OCC expects equity contributed before construction disbursements begin, and it excludes deferred developer profit, unearned fees and accrued holding costs on contributed land from equity. Interest reserves must be properly estimated, and repacking a depleted reserve with additional debt is identified as a red flag. Draw administration should include architect or engineer inspection with each draw, monthly cost-to-complete reporting, retainage of 10 to 20% under progress-payment plans, and vigilance against front-loaded schedules of values. HVCRE treatment carries a 150% risk weight unless the borrower contributes at least 15% of as-completed value or another exemption applies.
Gas stations and convenience stores
Fuel retail is the asset class where public cost evidence is richest and most underused. The FTC Franchise Rule requires franchisors to disclose initial investment ranges in Item 7 of their Franchise Disclosure Documents, scoped by category: land, construction, FF&E, POS, signage, permits and opening inventory. Those tables are the best public price lists in the industry, and any budget landing outside the Item 7 range for its format should carry a written variance explanation.
Total project cost by format
| Format | Low | High | Source |
|---|---|---|---|
| New store and fuel site, before land (about 5,200 SF store) | $3,098,500 | $9,430,500 | Circle K FDD Item 7, 2026 |
| New store and fuel site, including land | $3,356,200 | $7,742,500 | Holiday FDD Item 7, 2025 |
| Standard 3,000 SF store, four dispensers, canopy | $2.2M | $2.8M | Contractor cost guides, 2026 |
| Newly built store, no fuel | $808,950 | $1,973,600 | Sunoco APLUS FDD, 2025 |
| Large food-forward format | Above $7.5M | Wawa, 2026 |
Format is the first variable to resolve, because a kiosk on half an acre and a 4,000 to 6,000 SF foodservice store on 1.5 acres or more are different assets. Circle K states its stores generally need at least 50,000 SF of land. For the foodservice format, the evidence centers on $4M to $7M before land. For a kiosk with a small store, the evidence points to $1.5M to $2.5M before land, though no public operator discloses per-unit cost for that format.
Line-item anchors
The Item 7 disclosures decompose the total. Circle K's 2026 FDD places store and forecourt construction at $1.8M to $6.0M and FF&E including fuel equipment at $500,000 to $1.2M. Holiday's 2025 FDD places building and site work at $1.1M to $2.25M, land at $500,000 to $2.0M, plans and specifications at $85,000 to $180,000, permits at $30,000 to $100,000, initial fuel inventory at $100,000 to $300,000 and opening merchandise at $70,000 to $120,000. POS and back office run $64,000 to $115,000 and signage $50,000 to $250,000 across the two disclosures.
Building cost for the c-store itself ranges from about $150 to $350 per SF in 2026 contractor benchmarks, with foodservice formats at the top. A recorded Texas filing for a 5,000 SF store in January 2025 came in at $140 per SF, a useful reminder that the low end exists but rarely includes a commercial kitchen.
The forecourt: build it per fueling position
The forecourt should be built bottom-up: dispensers multiplied by installed price, plus tanks, piping, sumps, automatic tank gauges and canopy area. Distributor list prices for the Gilbarco Encore 700S range from $42,830 for the base two-position unit to $55,098 for an ultra-high-flow model in 2026. A double-wall underground tank with piping, installed, cost $88,707 in EPA's 2006-dollar analysis, roughly $140,000 to $150,000 escalated to 2026. A recent public canopy bid came in at $68,777 to $101,930.
Union Metric's practical check is fuel system plus canopy at roughly $90,000 to $150,000 per fueling position for a new forecourt. This is a synthesis of distributor pricing, escalated EPA tank costs and canopy bids, not a published benchmark, and it should be tested against the borrower's quote rather than substituted for it.
Volume must justify the positions. A forecourt that implies fewer than about 8,000 to 10,000 gallons per fueling position per month at stabilization is capital sitting in the ground. Oversized forecourts are the single most common way a fuel budget inflates without any individual line looking wrong.
List, installed, independent
Equipment is where list price, installed price and reality diverge most. Gilbarco's 2019 suggested retail for the comparable base dispenser was $17,368, against a 2026 distributor list of $42,830. That apparent jump mixes inflation, option content and the gap between list and street pricing, which is precisely why a single quote is never a benchmark. Bundle discounts and brand programs reduce the street price. Installation, sumps and electrical add to it. The reviewer should require the distributor quote, the installer's scope letter and the installer-certification method under 40 CFR 280.20.
If dispensers, POS or tanks are leased or vendor-financed, they come out of the hard-cost budget, the payments move into operating expense, and the lender must confirm its collateral lien is not subordinated to the vendor's.
Useful life and the reserve schedule
Tax life and physical life diverge sharply. Under Revenue Ruling 2003-54, petroleum-marketing personal property, including pumps, tanks and canopies, is class 57.0 with a five-year recovery period, while service station buildings and land improvements are class 57.1 at 15 years. Physical lives are much longer: fiberglass tanks carry 30-year manufacturer warranties and dispensers are planned at 15 to 20 years. Reserves should be funded on physical life, and equipment debt should not amortize beyond it.
Environmental and schedule cost
A Phase I to ASTM E1527-21 is non-negotiable on any fuel site, and a Phase II is warranted on any former fuel use. EPA's 2022 cleanup cost study puts median inherited cleanup on former fuel sites at $27,120 to $265,883 depending on state. A land price that looks like a bargain on a former station is frequently pricing exactly that liability.
Federal rules under 40 CFR 280 require secondary containment with interstitial monitoring for new tanks, piping and dispenser sumps, plus spill and overfill prevention and operator training. Stage II vapor recovery survives mainly in states that retained it, California most notably, so budgets should follow the state program rather than federal minimums. Permit lines in Item 7 run $21,000 to $100,000, but the larger cost is schedule: every month of entitlement delay carries land interest, construction interest and overhead. Union Metric models a schedule-risk case of at least three months.
EV charging belongs below the line
Level 2 chargers run roughly $3,500 to $15,000 per port installed, and 150 kW DC fast chargers about $90,000 to $150,000 per port, with make-ready and utility upgrades driving 50 to 70% of the DCFC total. NEVI survived a 2025 freeze and a January 2026 court ruling, but court filings showed states had sought reimbursement of only about 2% of $4.4 billion available, and pending legislation would not reauthorize NEVI as a standalone program after FY2026. Conduit and pad stubs belong in the base budget. Chargers belong in an alternate unless a grant is executed, and charging revenue receives no credit at stabilization.
Supplier money is debt, not equity
Branded-supplier image funds are the most frequently misclassified source in fuel budgets. SEC-filed supplier agreements show image incentives credited against fuel purchases over ten-year terms, with reimbursement required on debranding and pro-rata recapture if volume falls short. Public operators book them as amortizing liabilities. Image money should be netted against eligible cost only if disbursed at closing, carried as contingent debt in the stress case and never counted toward the equity injection.
Cost versus value
Gas station value is built on income, not cost: gross profit multiplied by a multiplier, or NOI divided by an overall rate. A store built for $5M that stabilizes at a $4M value carries 20% external obsolescence, which is common in fuel-volume-driven formats, and the study must show that gap explicitly. Gas stations sit on the SBA special-purpose list, requiring a going-concern appraisal allocated among land, building, equipment and intangibles, and 504 equity of 15%, or 20% for a startup.
Lender red flags: gas station
- Fueling positions oversized for forecast volume.
- Fuel system priced from a vendor list with no sumps, tank gauges, piping lengths or installer method.
- A former fuel site with no Phase II or cleanup allowance.
- Brand image funds counted as equity, or netted from cost without disclosing the clawback.
- No tariff or escalation contingency, and equipment quotes older than 90 days.
Truck stops and travel centers
The travel center is a gas station only in the sense that a hotel is an apartment building. It is a multi-revenue operating platform on ten or more acres, open around the clock, in which fuel is the customer acquisition cost and parking, food, showers, scales and service are the profit. The budget must be rationalized in that light, because a cost structure justified by diesel gallons alone will almost always fail the value test.
Total project cost by format
| Format | Typical cost | Source |
|---|---|---|
| Full travel center, ground-up, 10+ acres | Above $20M all-in | NATSO Foundation, July 2025 |
| New franchised TA/Petro, about 20 acres | Up to $26.5M | Franchise materials, 2026 |
| Franchised TA, Laurel MS | $15M to $20M | Project record, 2026 |
| Love's, Rock Falls IL (about 14 acres, 88 truck spaces) | About $18M | Municipal record, 2025 |
| Love's, NY Thruway (7.23 acres, 37 truck spaces), before utility extensions | About $20M | Project record, 2026 |
| Small independent truck stop | About $2M | NATSO Foundation, 2025 |
A fuel-only diesel stop with a fuel desk, four to eight diesel lanes and limited parking sits in a $2M to $8M band depending on land, though the evidence for that format is thin. A full travel center with quick-service restaurant, showers, 75 to 150 stalls and a scale centers on $15M to $25M. Mega-formats at $60M to $95M are calibration points only and should never inform a single-operator budget.
Value the diesel island honestly
TravelCenters of America's FY2022 10-K, its last audited year as a public company, is the clearest disclosure of the economics. Fuel was 80.3% of revenue but only 30.5% of gross margin, while nonfuel gross margin held at 60.4%. Diesel lanes and DEF are therefore the price of bringing the truck onto the lot. Each diesel lane in the budget should be justified by the parking, food and service capture it enables, not by gallons alone.
Diesel and DEF dispensers list at $65,415 to $77,659 per unit in 2026 distributor pricing. Diesel tanks are larger and more compartmentalized than gasoline tanks but follow the same escalated EPA cost basis of roughly $140,000 to $150,000 per installed tank.
Price parking per stall
Truck parking is the travel center's most underestimated line and its most valuable amenity. Private stalls with paving and lighting cost $10,000 to $50,000 each, centering near $25,000; heavy-duty concrete paving runs $12 to $15 per SF. Public builds by state DOTs run far higher, with ATRI reporting a median of $93,500 per space and rest-area spaces near $113,000.
A private budget implying more than about $50,000 per stall excluding land needs explanation. A budget under $10,000 per stall usually omits stormwater, lighting or adequate pavement section, and pavement under loaded tractor-trailers degrades faster than car-lot paving. Reserves for joint repair and panel replacement should be explicit from year three.
Discrete items: scales, showers, service
The truck scale is a cleanly quotable line: about $35,000 to $85,000 in hardware for a 70 by 11 foot scale, and $95,000 to $125,000 turnkey including a foundation of roughly $30,000. Showers, restaurant space and truck-service bays have no clean public unit benchmark. They should be priced at the upper end of c-store building cost, $250 to $350 per SF for wet areas and commercial kitchens, and the restaurant pad should be supported by the QSR franchisor's own Item 7.
Time is a cost line
NATSO estimates a new build takes about two years from land control to opening, against three to six months to acquire an existing site. On a $20M project, 24 months of carry on land and predevelopment is material, and capitalized interest must be consistent with that schedule. A ground-up schedule under 18 months on a 10-acre site should be treated as optimistic until proven otherwise.
Entitlement is the dominant schedule risk. Travel centers attract organized opposition over noise, lighting, idling and traffic, with recent records including a sound-wall demand in Missouri, a withdrawn application in Texas and a denial recommendation in Indiana on a $17M project. Ten or more acres of impervious surface also drive stormwater detention, NPDES construction permitting and oil-water separation, and aboveground DEF and lubricant storage can trigger SPCC thresholds that compliant USTs do not.
Escalation and charging
Steel exposure is larger than at a gas station: diesel canopies, scales, multiple tanks, structural steel and pre-engineered metal buildings. Union Metric applies a 5 to 10% tariff and escalation contingency to steel packages and recommends locking scale and dispenser pricing early. Heavy-duty charging revenue has no place in a 2026 base case, and light-duty NEVI-style hubs follow the same below-the-line treatment as at a gas station.
Cost versus value
Because diesel carries little margin, stabilized value is driven by the non-fuel stack. A $20M build at a site that cannot capture food and parking revenue will appraise well below cost. NATSO notes that owners often have over $30 million per site tied up in land and that acquisitions can be less capital-intensive than new builds, so the acquisition alternative should always be tested against the build budget. Travel centers fall under SBA special-purpose treatment, with the same going-concern allocation and equity requirements as fuel stations.
Lender red flags: truck stop
- A budget sized on diesel gallons, with parking and food cost in the budget but their revenue under-supported.
- Private stall cost under $10,000 or over $50,000 excluding land, without explanation.
- A ground-up schedule under 18 months, with capitalized interest sized to match.
- No entitlement-risk analysis covering noise, lighting, idling and interchange access.
- EV, NEVI or heavy-duty charging counted as funded capital or stabilized revenue without an executed grant agreement.
Car washes
The express tunnel car wash is the asset class in which sponsors most often believe the budget is the equipment quote. It is not. Equipment typically represents only 25 to 35% of total project cost, and site work, electrical service, sewer capacity and stacking-lane concrete together frequently exceed it. A review that interrogates the tunnel package and accepts the civil budget has examined the wrong third of the project.
Total project cost by format
| Format | Low | High | Source |
|---|---|---|---|
| Express tunnel, 130 ft | $4,976,759 | $8,522,378 | Tommy's Express FDD Item 7, 2025 |
| Express tunnel, all-in including land | $4.0M | $7.5M | Wash Launch Group, 2026 |
| Mister Car Wash greenfield (implied from growth capex) | About $7.1M | About $7.6M | Mister Car Wash 8-K filings, 2025; Union Metric derivation |
| In-bay automatic, equipment only | $150,000 per bay | $450,000 per bay | Contractor guide, 2026 |
| Self-serve, equipment only | $50,000 per bay | $150,000 per bay | Contractor guide, 2026 |
The Mister Car Wash figure is the cleanest per-site benchmark available for any of the three petroleum and vehicle-service classes. The company guided roughly $205M to $220M of 2025 new-store growth capex and opened 29 greenfield sites, implying about $7.1M to $7.6M per site for an institutional operator in metro markets. An independent budget materially below $4M all-in for a 120-foot-plus tunnel in a metro market is more likely understated than efficient.
Tunnel length is a cost driver in its own right. A contractor estimate suggests each additional 10 feet of conveyor adds $80,000 to $120,000 across structure, equipment, water and chemical feed. That figure comes from a lower-quality source and belongs in a sensitivity, not in a benchmark, but the direction is reliable: 80 to 100 foot mini-express tunnels sit at the bottom of the ranges above and 120 to 150 foot tunnels at the top. Flex-serve formats should be priced as an express tunnel plus detail-bay building area and interior-cleaning equipment.
Decompose the equipment package
Manufacturer packages bundle conveyor, arches, dryers, chemistry, controls and sometimes POS and reclaim into a single turnkey number. That number must be re-cut into line items before it can be tested. For a 130-foot Tommy's Express, the 2025 FDD places the conveyor at $197,312 to $252,659, wash equipment at $218,505 to $257,130 and the drying system at $150,564 to $157,236, about $575,000 to $695,000 together. That reconciles to an independent tunnel-package band of $650,000 to $950,000 once controls, chemistry and installation are added. A package quote materially above about $1.5M for a standard express tunnel needs line-level support.
The remaining site package carries its own anchors in 2026 operator benchmarks: pay stations and POS at $200,000 to $350,000, chemistry systems at $70,000 to $110,000, vacuum equipment and canopies at $200,000 to $325,000, and water reclaim at $130,000 to $200,000. Building shells, typically pre-engineered metal or tilt-wall, run $700,000 to $1.1M, with Tommy's disclosing $803,411 to $853,190 for the 130-foot structure.
Site work and soft costs
Operator benchmarks place site work and utilities at $650,000 to $1.1M and land at $900,000 to $2.5M for a parcel of 0.8 to 1.5 acres. Soft costs run $320,000 to $525,000 in the same benchmark, while Tommy's FDD shows a wider $107,563 to $582,000 once water tap fees, civil engineering and zoning are included. Pre-opening and working capital add $180,000 to $300,000.
The soft-cost range is wide for a structural reason: water and sewer fees vary more than two-and-a-half-fold between jurisdictions. In a recent comparison, utility impact fees for a car wash totaled under $20,000 in Houston against about $50,000 in Sacramento. Fee schedules also reset frequently, and Fort Worth, Rogers and Panama City all adopted new schedules in 2025. The budget should carry the fee in effect at permit issuance, determined from the utility's own service-unit classification for car washes.
Reclaim mandates and environmental scope
California Water Code sections 10950 to 10953 require new conveyor and in-bay washes to recycle at least 60% of wash and rinse water, and metro North Georgia jurisdictions require 50%. Elsewhere reclaim is often voluntary, but it reduces water and sewer bills by roughly 80 to 85%, which makes it an operating decision as much as a compliance one. Stormwater management, oil-water separation and a Phase I ESA complete the scope, with a Phase II indicated wherever the parcel had prior fuel use. Entitlement increasingly faces scrutiny over stacking lanes, noise and saturation, and Union Metric carries three to six months of schedule contingency.
Useful life, reserves and financed equipment
Car wash buildings are 15-year class 57.1 property for tax, while conveyors, dryers and pay stations are five- or seven-year personal property. Physical lives run longer: about 25 years or more for conveyors, 10 to 15 years for touchless in-bay automatics, 10 to 20 years for friction rollovers and 10 to 12 years for dryers, with motor rebuilds along the way. Union Metric recommends a replacement reserve floor of about 2 to 4% of revenue and equipment loan terms no longer than seven to ten years. Leased equipment is common in this asset class; it comes out of project cost, its payments move into the operating statement, and UCC priority must be confirmed.
Tariff exposure
Tunnel equipment is steel- and aluminum-intensive: conveyor beds, arches, dryer housings and stainless components. Much of it is domestically manufactured, but on pricing indexed to imported metal, and imported equipment can be dutied on full customs value under the April 2026 derivative rules. Union Metric carries the same 5 to 10% equipment tariff and escalation contingency used for fuel packages. EV charging is optional at an express wash; Level 2 ports at vacuum or detail stalls make sense, while DC fast charging has little dwell-time logic and belongs outside the base case.
Cost versus value
Tommy's 2026 FDD reports average gross revenue of about $2.22M per unit, while another aggregator reports a $1.75M median for franchised outlets open at least twelve months. Against a $5M to $8.5M investment, stabilized going-concern value can trail cost in saturated markets. Institutional appetite remains strong: Leonard Green & Partners agreed in February 2026 to take Mister Car Wash private at a $3.1 billion enterprise value. But that appetite is priced at enterprise multiples on proven, membership-heavy portfolios, not on single greenfield sites, and sale-leaseback, the operator's cost-recovery tool, does not reduce the cost basis for a single-asset SBA borrower. Car washes are on the SBA special-purpose list, with 504 equity of 15%, or 20% for a startup.
Lender red flags: car wash
- A single turnkey tunnel quote with no line detail, or package pricing outside $650,000 to $1.5M without explanation.
- Water and sewer impact fees, tap fees or reclaim omitted or carried as placeholders, particularly in high-fee jurisdictions.
- An all-in budget under about $4M for a 120-foot-plus metro tunnel.
- Equipment debt amortized beyond ten years, or reserves not sized to dryer, POS and conveyor replacement cycles.
- Revenue assumed above franchisor Item 19 averages of about $1.75M to $2.22M, combined with a cost basis that only pencils at that revenue.
Hotels
Hotels are the only asset class in this group with a rigorous, published, line-item cost survey, and that evidence delivers an uncomfortable verdict. At system-average performance in 2026, a new limited-service hotel costs materially more to build than it is worth on completion. U.S. supply growth of 0.2% in 2023, 0.6% in 2024 and 0.7% in 2025, against a pre-2020 average of about 1.4%, is the market's own confirmation. HVS reports that lenders are frequently requiring larger equity contributions and underwriting new projects conservatively.
Two independent anchors that reconcile
The HVS U.S. Hotel Development Cost Survey 2026, built from 2025 budgets and including land, places median total development cost at $196,975 per room for limited-service, $169,901 for midscale extended-stay, $200,730 for select-service and $264,841 for upscale extended-stay. Brand Item 7 disclosures, which exclude land, form the second anchor:
| Brand prototype (2026 FDD) | Rooms | Cost per key, low | Cost per key, high |
|---|---|---|---|
| Tru by Hilton | 98 | $145,491 | $210,812 |
| Home2 Suites | 107 | $168,932 | $248,136 |
| Hilton Garden Inn | 134 | $190,293 | $278,747 |
The two sources reconcile closely once land is removed. The HVS limited-service median carries $22,213 of land, leaving about $174,800 per room ex-land, while the Tru Item 7 midpoint is about $178,150 per key. A limited-service budget falling more than about 15% below that ex-land band, without a documented reason such as a rural labor market, owner-general contractor or contributed land, should be treated as incomplete rather than efficient.
HVS itself cautions that its survey should not be relied upon to determine the cost of actual projects or for valuation. It is a range check. Item 7 is a state-registered disclosure and the most defensible brand-specific source, and the current FDD for the specific brand should be pulled on every engagement.
Brand budgets are outrunning the indices
Between the 2025 and 2026 filing cycles, Item 7 ranges rose 15.2% at the low end for Home2, 16.3% for Hilton Garden Inn and about 11 to 12% for Tru. That is two to four times the general construction indices, with Turner at 4.1% for 2025. Any hotel budget built on a 2024 or 2025 brand estimate is likely understated by at least 8 to 15%, and HVS names tariffs on imported metals as the primary catalyst. Hotel-specific exposure concentrates in copper-intensive MEP (PTAC and VTAC units, wire, piping), elevators, aluminum storefront and imported casegoods.
Map to six buckets before comparing anything
| HVS 2026 median per room | Limited-service | Midscale ext.-stay | Upscale ext.-stay | Select-service |
|---|---|---|---|---|
| Land | $22,213 | $11,886 | $18,182 | $18,000 |
| Building and site | $141,143 | $110,057 | $190,694 | $126,900 |
| Soft costs | $19,896 | $16,127 | $19,165 | $21,002 |
| FF&E | $16,079 | $16,594 | $25,661 | $18,321 |
| Pre-opening and working capital | $2,900 | $2,419 | $4,863 | $3,561 |
| Developer fee | $9,453 | $6,343 | $7,349 | $9,500 |
HVS places site improvements, permits, parking, engineering and hard-cost contingency inside hard costs, and franchise application fees, interest reserves, construction interest and soft-cost contingency inside soft costs. Every sponsor budget should be restated into these six buckets before any comparison is made. Note that the median developer fee divided by the median total is about 4.8% for limited-service, which is the more useful test figure than HVS's printed sample-wide percentage.
FF&E is the cleanest single test. The 2026 Home2 Item 7 carries $2.77M of FF&E for 107 suites, about $25,900 per suite, almost exactly the HVS upscale extended-stay median of $25,661. An extended-stay budget showing FF&E below about $20,000 per key, or a limited-service budget below about $16,000, should be presumed short of brand standard. Franchisor fees are also discrete: Hilton's 2026 Item 7 includes up to $234,346 for Tru, $245,471 for Home2 and $339,322 for Hilton Garden Inn payable to Hilton or affiliates.
Carry and ramp
At 2026 construction rates, construction-period interest and the interest reserve are often the single largest soft-cost item, and HVS lists both explicitly. A new limited-service hotel typically needs two to three years to reach stabilized occupancy and RevPAR penetration, so the operating-deficit reserve should be sized on a month-by-month ramp rather than an annual average. Hilton's Item 7 separately estimates three months of initial operating expenses including payroll; an independent operator without franchisor reservation support needs more. Pre-opening and working capital below about $2,500 per key is a red flag.
Adjust for vintage, region and scale
HVS 2026 reflects 2025 budgets and should be escalated to the construction midpoint using Turner (4.8% trailing twelve months in 2026) or RLB (4.4%). Regional adjustment through RSMeans City Cost Index or Marshall & Swift local multipliers applies to the building line only, not to FF&E, which is nationally procured. Below about 80 keys, per-key costs rise above the prototype because public space and elevators are fixed costs. Any line deviating more than about 25% from the HVS median for its bucket should be flagged and explained.
The value test
US Realty Consultants' mid-2026 survey puts limited-service hotel cap rates at 8.7% and the rooms-revenue multiplier at 3.3. Hilton's 2026 system statistics show Tru at 66.5% occupancy, $125.05 ADR and $83.18 RevPAR, or about $30,400 of rooms revenue per key. At 3.3 times rooms revenue, value is about $100,000 per key. At an 8.7% cap rate and a 30 to 35% NOI margin, value is roughly $105,000 to $127,000 per key.
Against an ex-land cost of $145,000 to $211,000, cost exceeds value by roughly 40 to 90% at system-average performance. Supporting $200,000 per key at an 8.7% cap and 35% margin requires RevPAR of roughly $130. Market evidence agrees: a June 2025 CMBS appraisal of a 149-room Hilton Garden Inn in Fairfax, Virginia valued it at $153,389 per room, against a 2026 HGI Item 7 range of $190,293 to $278,747 per key ex-land. Appraisers conventionally look for 10 to 15% profit over cost before new construction is considered feasible, and most limited-service projects cannot show that margin on market RevPAR in 2026.
The conclusion is not that hotels cannot be financed. It is that a hotel feasibility study must either demonstrate a market-specific RevPAR premium supported by identified demand generators, or show the cost-value gap covered by equity. Hotels are named special-purpose property under SBA rules, and a ground-up 504 hotel by a new business typically requires 20% equity. Under USDA's §5001.203, going-concern value is deducted from reconciled market value before discounting, so brand and intangible value cannot cover any part of the gap.
Lender red flags: hotel
- FF&E below brand standard or the HVS median for the segment.
- Item 7 cited from an FDD more than twelve months old, or total cost below the Item 7 low end ex-land without explanation.
- No interest reserve, or a reserve sized to a twelve-month ramp.
- Developer fee embedded in GC overhead and also listed separately.
- Pro forma RevPAR more than 10 to 15% above the competitive set without a demand-generator rationale.
RV parks and campgrounds
RV parks present the starkest paradox in this group. Their credit performance is excellent: in a tabulation of SBA FOIA loan-level data, RV parks charged off at 0.91% of disbursed 7(a) loans against 4.66% for the whole SBA book. Their development arithmetic is not. At an 8.0% going-in cap rate and a 25-year bank loan constant of 8.7 to 9.3%, entry leverage on a new park is negative. Proven operating parks are good credits; ground-up parks are a cost problem.
Cost per site
There is no RV-park equivalent of the HVS survey, and the published evidence is thinner and more vendor-driven than for any other class here. The working bands are:
| Format or component | Low | High | Basis |
|---|---|---|---|
| Good-quality park, 100+ sites, land excluded | $30,000 per site | $40,000 per site | Industry synthesis, 2026 |
| Resort product, all-in | $40,000 per site | $70,000 per site | Industry and vendor sources, 2026 |
| Utilities only (30/50 amp, engineered septic, permitted well) | $8,000 per site | $15,000 per site | Vendor guide, 2026 |
| Electrical only | $3,000 per site | $7,000 per site | Vendor guide, 2025 |
| New KOA campground, Item 7, land excluded | $3.8M per project | $8.9M per project | KOA FDD, 2022 (dated) |
Site type matters more than the published averages suggest, though no current source isolates it. Analytically, a pull-through pad uses roughly 1.5 to 2 times the land and road frontage of a back-in pad, so pull-throughs should carry 20 to 40% more site-work and road cost. Premium resort pads with concrete, patio and landscaping add roughly $5,000 to $15,000 per site over a gravel full-hookup pad. These are working assumptions to be validated against the civil engineer's estimate. Partial-hookup sites save the sewer lateral but increase dump-station load, and cabins, park models and glamping units must be budgeted as separate vertical and FF&E lines per unit, never blended into a per-site average.
Where the money goes
For a 100-site full-hookup park, Union Metric's illustrative allocation is site work, grading, roads and pads at 30 to 40% of cost; utilities, including water, sewer or septic, electrical distribution, pedestals, transformers, well and lift station, at 25 to 35%; amenities and buildings at 15 to 25%; soft costs at 8 to 12%; and contingency at 10 to 15%, with land separate. This is an analytical framework to test against engineer estimates, not a published survey.
The allocation explains the failure mode. RV parks are infrastructure projects that happen to have guests, and under-provisioned infrastructure does not disappear: it reappears in the operating statement. Newmark's expense study of 62 parks found utilities at 14.5% of revenue and total operating expenses at 53.7%. A budget that saves on transformers, wire gauge or septic capacity buys a utility-cost problem that the pro forma will not show.
Build the benchmark bottom-up
Because no national survey exists, the reviewer must construct the benchmark from quantities:
- Obtain a civil engineer's quantity-based estimate: linear feet of road, water and sewer main, pedestal count and transformer kVA.
- Cross-check per-site totals against the industry bands above.
- Cross-check against KOA Item 7, scaled to site count and escalated from its 2022 vintage.
- Re-price paving, pipe and electrical with RSMeans or Marshall & Swift unit costs.
- Confirm utility capacity with a will-serve letter, and test well yield and septic soils before accepting any per-site figure.
Transformers and the escalation profile
RV parks are exposed to copper in wire and pedestals, PVC and HDPE pipe, aggregate and paving, and above all to transformers. Wood Mackenzie reports distribution transformer unit costs up 78 to 95% since 2019 depending on specification, with a supply deficit of about 6%. Lead times eased to roughly 30 weeks in 2025 from more than 100 weeks in 2023, though trade sources quote pad-mount units at 40 to 60 weeks in 2026. Semi-finished copper has carried the 50% Section 232 duty since August 2025. Transformer procurement must be scheduled against lead time, because a park that cannot energize cannot open.
Soft costs, contingency and the seasonal ramp
Published contingency guidance runs 5 to 15%. For rural sites with septic and well, Union Metric treats 10% as the floor. Permit and impact fee estimates in cost guides vary from about $50,000 to more than $300,000 per project, which is too wide to use; jurisdiction fee schedules must replace them. KOA franchise economics, per the 2025 FDD summary, include an 8% royalty, a 2% advertising fund and a $45,000 new-construction fee.
Transient parks typically take two to four seasons to build reputation and occupancy. Seasonal parks therefore need an operating-deficit reserve covering the off-season trough in years one and two, in addition to the construction interest reserve. A budget that carries interest only through construction completion has funded the building and left the business uncapitalized.
Cost versus value
Newmark's 2026 survey places cap rates at about 8.0% for Class A and B parks and 9.0% for Class C, with value-add parks at 11 to 12%. A $60,000-per-site resort needs about $12,000 of revenue per site per year to reach a 10 to 11% yield on cost, against the $5,000 to $10,000 that parks typically achieve. At $8,000 of revenue and a 46% NOI margin, NOI is about $3,700 per site, worth about $46,000 at an 8.0% cap rate, below the $55,000 to $70,000 resort build cost before any developer profit.
The SBA adds a structural constraint. More than 50% of gross revenue must come from transient stays of 30 days or less, or the park is treated as ineligible passive real estate. Annual-heavy tenure mixes that stabilize income can therefore disqualify the loan. Under USDA B&I, going-concern value is deducted before collateral discounting, and a feasibility study is required for new-business loans above $1 million.
Lender red flags: [RV park](/services/rv-park-feasibility-study)
- Utility capacity assumed without a will-serve letter, or septic and well permitting not secured.
- Transformer procurement not scheduled against lead time.
- Site work below about $10,000 per site on raw land, or contingency below 10%.
- Revenue above $10,000 per site without comparable support, or cabins and park models blended into site counts.
- Transient share under 50% on an SBA loan, or no off-season operating reserve.
RV and boat storage
RV and boat storage is the one class in this group where cost and value still overlap in well-located markets. It is also the most steel-intensive per dollar of cost, which makes it the class most exposed to the 2025 and 2026 tariff shock. The two facts together mean that the budget, and especially the date on the canopy quote, decides feasibility more directly here than anywhere else.
Cost per square foot and per space
| Format | Cost per SF | Basis | Implied per space |
|---|---|---|---|
| Canopy, structure only | $9 to $14+ | Structural | |
| Canopy, turnkey | $36+ | Turnkey | About $17,300 (12 by 40 stall) |
| Canopy, regional range | $18 to $35 shell; $20 to $50 installed | Shell and installed | $8,600 to $24,000 |
| Three-sided canopy | Plus $3 to $5 over canopy | Structural | |
| Enclosed, with doors | $56+ | Turnkey | About $31,400 (14 by 40 unit) |
| Enclosed, regional range | $40 to $75 shell | Shell | $22,400 to $42,000 |
| Condo-style | $72+ | Turnkey | About $40,000+ |
| Site work, storage generally | $4.25 to $8 per SF of site | Site |
The per-space figures are Union Metric calculations that exclude drive aisles and site work. Open paved or gravel storage has no published benchmark at all; one Mountain West manufacturer declines to publish because site work dominates the cost. For open and canopy projects, site work and paving are the largest controllable line.
Design parameters drive both cost and revenue. Canopies need a minimum 14-foot clear height, cost about a quarter of an enclosed building and command 30 to 40% more rent than uncovered spaces. A viable project is typically 7 to 10 acres at 35 to 40% buildable coverage. Coverage above roughly 40% without a site plan should be treated as unproven, because drive aisles must accommodate turning radii for vehicles longer than 40 feet.
The lines that get missed
The critical lines are paving versus gravel, stormwater detention for a large impervious area, perimeter fencing, gate and access control, cameras and lighting, canopy steel, large roll-up doors in 12 to 14 foot widths for enclosed units, electrical service to enclosed units for trickle charging, and dump and wash stations. Gravel assumed where the jurisdiction requires paving, and the absence of a detention line, are the two most common omissions. Metal-building engineering, wind and snow loads, and fire-lane requirements are the main permitting cost drivers.
Rationalization method
Canopy and enclosed costs per SF should be compared to at least two manufacturer quotes dated within 90 days, because tariff pass-through moved steel pricing quarterly through 2025 and 2026. Site work should be re-priced against RSMeans paving and stormwater unit costs. Total cost per acre should then be cross-checked against transaction pricing per acre, which provides an unusually clean market test for this asset class. Roll-up door packages lack published price data and require dated quotes on every engagement.
Steel and the escalation profile
The 50% Section 232 duty on steel since June 2025 and its restructuring to full customs value in April 2026 flow directly into canopy, framing and door pricing. Domestic producers have priced in step: Worthington Enterprises reports hot-rolled steel averaging $919 per ton for its fiscal year ended May 2026, against about $755 a year earlier, and closing that month near $1,081. A canopy quote from early 2025 is not a benchmark for a 2027 build.
Cost versus value
Yardi Matrix put advertised RV and boat parking rates at $6.38 per SF annualized in September 2025, up 4.4% from March. Transaction pricing for dedicated facilities peaked near $768,000 per acre in 2022, fell to about $308,000 in 2024 and recovered to about $505,000 in 2025. No standardized cap rate survey exists; practitioner ranges place stabilized Class A at roughly 6.0 to 7.5% and Class B at 7.5 to 8.5%, generally 50 to 150 basis points wide of conventional self-storage.
An illustrative acre at 38% coverage holds about 16,500 rentable SF. At $6.38 and 85% occupancy, that produces about $89,500 of revenue. At a 25 to 35% expense ratio, NOI is about $58,000 to $67,000, worth roughly $780,000 to $890,000 per acre at a 7.5% cap rate. Canopy build-out at $36 per SF on 16,500 SF is about $594,000 per acre before land and site work. The spread is positive in well-located markets, but thin enough that land basis decides feasibility.
Recent oversupply in Texas and Florida argues for a 12 to 24 month lease-up with an interest reserve, rather than the immediate absorption sponsors in undersupplied markets often assume. And because cap rates for this class sit wide of self-storage, a valuation that borrows self-storage cap rates overstates value by a margin large enough to erase the development spread. SBA eligibility and special-purpose treatment for storage should be confirmed against the operative SOP text for each loan.
Lender red flags: RV and boat storage
- Canopy or enclosed quotes more than 90 days old, or quotes that exclude erection, foundations or doors.
- No stormwater or detention line, or gravel assumed where paving is required.
- Coverage above about 40% without a site plan.
- Rents above Yardi metro comparables, or no lease-up reserve.
- Valuation at self-storage cap rates.
Self-storage
Self-storage development is contracting because value has reset below cost. Yardi Matrix projects 2026 new supply at 52.93 million net rentable square feet, down about 19%, and 2027 lower still. Marcus & Millichap projects 2026 asking rent down 0.8% to about $1.18 per SF per month, the fourth consecutive annual decline and roughly 12% below the 2022 peak. In this environment the decisive budget line is not the building. It is the carry required to survive a lease-up that has lengthened by half.
Cost by format
| Format | Low | High | Basis |
|---|---|---|---|
| Single-story drive-up, building | $50 per SF | $65 per SF | Excludes land and site; manufacturer, 2025 |
| Multi-story climate-controlled, building | $90 per SF | $130 per SF | Excludes land; manufacturer, 2025 |
| Non-climate, total project | $55 per GSF | $90 per GSF | Excludes land; cost guide, 2026 |
| Climate single-story, total project | $85 per GSF | $130 per GSF | Excludes land; cost guide, 2026 |
| Multi-story urban, all-in | $120 per GSF | $175 per GSF | Cost guide, 2026 |
| Public Storage development pipeline, December 2025 | About $184 per NRSF | All-in, land included; 10-K | |
| Site development | $4.25 per SF | $8.00 per SF | Site |
The Public Storage figure, 29 facilities and 2.6 million NRSF at $479.5 million, is an institutional, infill-heavy ceiling. Its earlier pipeline implied about $205 per NRSF. It is not a target for a suburban single-story project, but a multi-story budget well below it in a comparable market requires explanation.
Several vendor sites cite $25 to $40 per SF for single-story and $42 to $70 for multi-story, attributed to RSMeans. Those figures sit 30 to 50% below manufacturer and REIT evidence and appear to reflect shell-only models. They must never be used as a floor for a turnkey budget.
The efficiency trap
The most common arithmetic error in storage budgets is mixing gross and net area. Ten thousand rentable SF requires roughly 13,900 gross SF in non-climate product and 14,300 in single-story climate-controlled product, an efficiency near 70 to 72%. Multi-story interior-corridor product typically runs 70 to 80%. At 75% efficiency, a $120 per GSF figure becomes $160 per NRSF. Every per-SF number in the study must state its basis, and the efficiency must be tested against the plan set rather than assumed.
Line items
The material lines are land; site work and paving; the building shell, pre-engineered metal for single-story or concrete podium for multi-story; interior partitions and corridor systems; roll-up doors; HVAC for climate-controlled space; elevators for multi-story, roughly $85,000 to $200,000 each; fire suppression; security and access control; the office, kiosk or manager's apartment; soft costs; and lease-up carry. Conversions of big-box retail or office space have no reliable published benchmark and require a property condition report and a code analysis covering sprinklers, floor loads and egress before any per-SF figure is accepted.
Lease-up is the decisive variable
Public Storage's FY2025 10-K states that physical occupancy can be achieved as early as two to three years after completion, through lower rental rates during fill-up. Industry commentary in early 2026 described the shift plainly: facilities that once stabilized in 18 months now take 24 to 36, and lease-up absorption risk tops lender concerns, cited by 88.2% of respondents. Yardi Matrix treats properties as stabilized at 36 months for its rent series.
Union Metric sizes the reserve on a monthly ramp: physical occupancy to 85 to 90% over 24 to 36 months, economic stabilization at 36 to 48 months, concession-adjusted street rates, and a combined interest and operating-deficit reserve sufficient to reach the month in which NOI covers debt service at 1.0 times, plus a six-month cushion. As an illustration, a $12M project at 65% loan-to-cost carries about $585,000 a year of interest at 7.5%. A 30-month ramp typically requires a combined reserve of roughly $0.9M to $1.3M. A budget reserving for 18 months is underwriting the market of 2021.
Contingency should be at least 5% of hard cost for single-story, and 7 to 10% for multi-story or conversions.
Escalation
Storage buildings are steel-dominant across framing, panels and doors, and the 50% Section 232 duties are the principal cost driver. Worthington reports cold-rolled steel at about $1,126 per ton in February 2026, up from $1,040 in November 2025. Climate-controlled product adds copper and aluminum exposure through HVAC equipment, for which no measured 2026 price index was found. Door and building quotes should be dated within 90 days.
Cost versus value
Yardi Matrix advertised street rates stood at $16.10 per SF annualized in February 2026 and were down 1.9% year over year in August 2026. Marcus & Millichap places the 2026 average cap rate at 6.59%. At $16.10 and 88% occupancy, revenue is about $14.17 per NRSF. At a 60 to 65% NOI margin, NOI is about $8.50 to $9.20, worth roughly $129 to $140 per NRSF at a 6.59% cap rate. Multi-story product at $150 to $200 or more per NRSF all-in exceeds that value in most suburban markets.
Public Storage underwrites development to about an 8% yield on cost, roughly 140 basis points above the 6.59% average cap rate, which implies a value-over-cost margin of about 21% at stabilization. That is the full development spread available to the best-capitalized developer in the sector, and it is the institutional benchmark for entrepreneurial incentive. A small SBA or USDA sponsor with higher costs and a higher cost of capital typically has less, and a sponsor projecting more must show why.
SBA eligibility for self-storage relative to passive real estate treatment, and its special-purpose status, should be confirmed against the operative SOP text for each loan. Under USDA B&I, a new-business construction loan requires 25% balance-sheet equity if the guarantee is issued before completion.
Lender red flags: self-storage
- No interest or operating-deficit reserve, or a reserve sized to an 18-month lease-up.
- Street rates above Yardi metro comparables, or rate growth assumed in 2027.
- Cost quoted per GSF but applied per NRSF.
- Multi-story hard cost under about $90 per SF, or vendor shell figures used as total cost.
- Exit cap rate below 6% in a secondary or tertiary market, or yield on cost more than about 150 basis points over market cap without a competitive-supply analysis.
The cross-asset view and the reviewer's checklist
Set side by side, the seven classes share one pattern: in October 2026, almost none of them pencils at replacement cost without an above-market operating story. The budget is rarely wrong because a single line is mispriced. It is wrong because the cost of delivering the asset has moved faster than the income the asset can produce.
| Asset class | Unit benchmark (2025 to 2026) | Dominant 2026 cost risk | Cost versus value at market operations | Ramp to reserve |
|---|---|---|---|---|
| Gas station with c-store | $3.1M to $9.4M before land | Steel packages; forecourt oversizing | Frequently below cost in fuel-volume formats | Months; schedule risk from permits |
| Travel center | $15M to $25M full format | Parking, steel, entitlement carry | Below cost without non-fuel capture | About 24 months to open |
| Express tunnel car wash | $4M to $8.5M including land | Utility fees; tunnel equipment tariffs | Can trail cost in saturated markets | Membership build |
| Limited-service hotel | About $197,000 per key including land | Brand-standard escalation; MEP copper | Cost exceeds value by about 40 to 90% | 2 to 3 years |
| RV park, resort | $40,000 to $70,000 per site | Transformers, septic, well, site work | Below cost under $12,000 revenue per site | 2 to 4 seasons |
| RV and boat storage, canopy | $36+ per SF turnkey plus site and land | Steel tariffs | Positive spread possible; land-sensitive | 12 to 24 months |
| Self-storage, multi-story | About $150 to $205 per NRSF all-in | Steel tariffs; falling rents | Exceeds value in most suburban markets | 24 to 36 months physical |
Twelve deficiencies that send a budget back
The deficiencies below combine explicit supervisory warnings with Union Metric's review experience. Each maps to a test the study should run.
- Missing soft costs. Permits, impact and tap fees, testing, builder's risk, taxes during construction and loan fees migrate to borrower liquidity mid-build. Soft costs below about 10% of total cost on operating-business assets should be presumed incomplete.
- Under-reserved or pooled contingency. Hard, soft and escalation reserves belong in separate lines, sized to design stage.
- Contractor numbers with no independent check. The top cost divisions should be re-priced in RSMeans or Marshall & Swift and tested against unit comparables.
- Equipment priced at list or on stale quotes. Quotes should be dated within 90 days, installed, freighted and post-tariff.
- No escalation line. Escalate to the construction midpoint at no less than about 5% a year, with package-specific treatment for metals and electrical gear.
- Understated interest carry. Model the draw on an S-curve through the ramp, and stress it by six months and 100 basis points.
- Financed developer fee or related-party markup. USDA bars related-party profit; the OCC places typical fees at no more than 4%; deferred fees are not equity.
- Omitted pre-opening and working capital. Size to months-to-breakeven plus debt service.
- Contractor exclusions not carried. Reconcile every exclusion to a budget line.
- Cost approach used to validate cost. Reconcile to income value and disclose the implied obsolescence.
- Equity counted twice or contributed late. Present sources and uses with timing, equity first.
- Front-loaded schedule of values. Compare the schedule to RSMeans division weights and flag early-line overweighting.
The lender-facing checklist
A budget that passes review answers yes to each of the following:
- [ ] Basis. Land in or out is stated, and soft costs, financing, FF&E, pre-opening and developer fee each appear exactly once.
- [ ] Vintage. Every benchmark is dated and escalated to the construction midpoint.
- [ ] Two-source test. The budget falls within a survey or industry range and within franchisor, REIT or manufacturer evidence for the same format and size.
- [ ] Region and scale. Local multipliers are applied to hard cost only, with a small-project premium below about 80 keys, 75 sites or 50,000 NRSF.
- [ ] Outliers. No line deviates more than about 25% from its benchmark bucket without written explanation.
- [ ] Contingency. At least 5% of hard cost for prototype product, 10% or more for RV parks, conversions or incomplete drawings.
- [ ] Developer fee. No more than about 5% of total cost, and not double-counted with GC fee or construction management.
- [ ] Carry. Interest and operating-deficit reserves are sized to the asset's real ramp.
- [ ] Utilities and permits. Will-serve letters, fee schedules, septic and well permits and transformer lead times are in the schedule.
- [ ] Cost versus value. As-stabilized value at market cap rates and market rents is compared to total cost, and any shortfall is covered by equity rather than by the pro forma.
- [ ] Program rules. SBA special-purpose appraisal requirements, the RV park transient test, the applicable SOP by loan-number date, USDA's going-concern deduction and new-business equity floors are each addressed.
Conclusion: the budget is a value question
A development budget is defensible only if it survives four tests in sequence. It must be complete, with every category of cost present and classified once. It must be independently benchmarked, with the contractor's number corroborated by evidence the contractor did not produce. It must be properly reserved, with contingency, escalation and carry sized to design stage, to the 2026 cost environment and to the asset's real ramp. And it must clear the value of what it builds, or show the shortfall covered by equity.
The first three tests are cost-reasonableness tests, and most studies that examine the budget at all stop there. The fourth is the one that decides feasibility, and in late 2026 it is where most projects in these seven classes are failing. Input prices rising 11.2% a year, brand budgets rising 8 to 16% in a single filing cycle, steel at 50% tariffs and storage lease-ups lengthening by half have pushed the cost of delivery past what the income of the completed asset supports.
That does not make these projects unfinanceable. It makes the feasibility study the document that determines how they are financed: with what equity, at what loan-to-cost, on what assumptions about revenue premium, and with what reserves. A study that accepts the sponsor's budget answers none of those questions. A study that rationalizes it answers all of them.
*This article is general methodology and market commentary, not an appraisal, a valuation opinion or legal advice. Benchmarks are dated ranges for reasonableness testing and do not substitute for project-specific estimates. Program provisions should be verified against the operative text of SBA SOP 50 10 8.1 with Technical Policy Updates and 7 CFR Part 5001 at the time of application.*
Related feasibility studies and research
For the asset classes tested above, see our gas station feasibility study, car wash feasibility study, hotel feasibility study, RV park feasibility study, RV and boat storage feasibility study and self-storage feasibility study pages, along with our guide to truck stop feasibility studies. Budget review on other classes follows the same method on our multifamily, assisted living, data center, fitness center, brewery and distillery and wedding venue feasibility studies.
On the regulatory side, read Three Reports, One Credit File, the 7 CFR Part 5001 Handbook, appraisal requirements by loan program and how USDA deducts going-concern value from collateral. For methodology and valuation, see the 2026 Feasibility Methodology Atlas, the cost and sales comparison approaches, highest and best use analysis, as is, as completed and as stabilized value, going-concern allocation, DSCR in feasibility studies and sensitivity analysis.
To have a development budget tested before it reaches credit committee, see our SBA feasibility study and USDA feasibility study services.
Sources
- OCC Comptroller's Handbook, Commercial Real Estate Lending (v2.0)
- HVS U.S. Hotel Development Cost Survey 2026
- ABC construction input prices, September 2026 (via Rock Products)
- Turner Building Cost Index, Q3 2026 (via Construction Owners)
- RLB Q3 2026 Construction Cost Report
- AIA, Managing the contingency allowance
- RSMeans, What Is Construction Estimating
- Marshall & Swift (Cotality)
- AGC tariff update, 2026 (via Construction Owners)
- NAGGL, SBA publishes SOP 50 10 8.1 with Technical Policy Updates
- 13 CFR 120.882, eligible 504 project costs
- 7 CFR Part 5001 Subpart B, eligibility provisions
- Rev. Rul. 2003-54, petroleum marketing depreciation
- Gilbarco Encore 700S distributor list, JF Petroleum
- NATSO, Travel Center Industry Sees Growth Through Acquisitions
- Eno Center, Washington v. DOT and NEVI progress
- Mister Car Wash Form 8-K, October 2025
- Wash Launch Group, greenfield car wash pro forma 2026
- Hilton 2026 Tru FDD
- Hilton 2026 Home2 Suites FDD
- Hilton 2026 Hilton Garden Inn FDD
- Toy Storage Nation, RV and boat storage construction costs
- Public Storage Form 10-K, FY2025
- Yardi Matrix, self-storage supply forecast
- Marcus & Millichap, U.S. Self-Storage Outlook 2026
Looking for a lender-grade industry guides feasibility study?
Related case studies
Wolfeboro, New Hampshire
USDA B&I RV Park Acquisition and Expansion: Willey Brook Campground, Wolfeboro, NH
As-is value versus prospective value with new sites, and capitalisation rates by site mix
Acquisition feasible at $1.96 million; 40-site expansion not feasible above $36,300 per site
North Port, Florida
SBA 504 Express Car Wash: 12994 Tamiami Trail S, North Port, Florida
As-complete versus as-stabilised value of a special-purpose start-up in a saturating membership market
Feasible with 20 per cent 504 equity and a ramp reserve; not feasible if the approved tunnel next door is built
Gettysburg, Ohio
SBA 7(a) Gas Station Acquisition: Lavy's Marathon, Gettysburg, Ohio
Allocating the going concern between real property, fuel equipment and business value, and normalising 2026 fuel margins
Supportable at $1.85 million on a benchmark profile; the $2.6 million price requires $409,000 of verified EBITDA
Alice, Texas
SBA 7(a) Hotel Acquisition: Holiday Inn Express & Suites Alice, Texas
Allocating the going concern between real estate, FF&E and intangible assets
Feasible at $5.2 million; not feasible at the $7.6 million asking price
Gaffney, South Carolina
USDA B&I New Hotel Development: Gaffney, South Carolina
Development cost against prospective value in a tertiary market, and what B&I collateral rules leave a lender to count
Not feasible at 2026 development cost: stabilised value is 42 per cent of project cost
Concord, North Carolina
SBA 504 Self-Storage, New Build: 256 Davidson Highway, Concord, North Carolina
A 439-unit climate-controlled self-storage project on a $599,000 site in Concord, where land is only 8 per cent of a $7.4 million cost and Charlotte rents leave the finished facility worth 65 per cent of it.
Not feasible at 2026 construction cost and Charlotte rents under SBA 504
Mesa, Arizona
SBA 504 RV and Boat Storage, New Build: Higley and Thomas, Mesa, Arizona
An entitled 640-space RV and boat storage site on the Loop 202 in Mesa, where a land price set like a finished facility leaves a $15.3 million project worth $10.2 million and covering its debt 0.72 times.
Not feasible at the $6.5 million land price and 2026 development cost under SBA 504
Keller, Texas
SBA 7(a) Assisted Living Acquisition: Six-Bed Type B Home, Keller, Texas
A six-bed Type B assisted living home in Keller listed at $1.2 million, which earns about $31,000 a year after paying market staff and works only with more beds or an owner working in it.
Not feasible at the asking price as a six-bed home on market staffing
Paso Robles, California
SBA 7(a) Winery Acquisition: 2925 Anderson Road, Paso Robles, California
A 10.55-acre Willow Creek winery and tasting room listed at $3.75 million without its brand, where a benchmark winery's earnings carry $1.69 million of SBA debt and the buyer funds 62 per cent of the deal.
Supportable only as an equity-heavy acquisition with the brand, club and inventory transferring; not supportable at the $3.75 million asking price on a conventional SBA structure
Related feasibility study engagements
508-Unit Class A Multifamily Community, Stanislaus County, California
Conventional feasibility study supporting a multifamily project in Stanislaus County.
240-Unit Workforce Multifamily Development, Bexar County, Texas
Conventional feasibility study supporting a multifamily project in Bexar County.
65-Site RV Park and Campground, Horry County, South Carolina
SBA 7(a) feasibility study supporting a rv park project in Horry County.
Ground-Up Destination RV Resort, Sun Belt Lake and Attraction Corridor
SBA 504 feasibility study supporting a rv park project in Lake and Attraction Corridor.
Express-Tunnel Car Wash, Douglas County, Colorado
SBA 7(a) feasibility study supporting a car wash project in Douglas County.
Dual-Tunnel Express Car Wash with Self-Service Bays, Clark County, Nevada
SBA 7(a) feasibility study supporting a car wash project in Clark County.
Truck Stop and Convenience Retail, Lincoln County, Nebraska
USDA B&I feasibility study supporting a gas station project in Lincoln County.
Convenience Store with Fuel Station, Ada County, Idaho
SBA 504 feasibility study supporting a gas station project in Ada County.
Ground-Up Franchised Select-Service Hotel, Sun Belt Secondary Metro
SBA 504 feasibility study supporting a hotel project in Sun Belt Secondary Metro.
SBA 7(a) Change-of-Ownership PIP Reposition and Re-Flag, Secondary Market
SBA 7(a) feasibility study supporting a hotel project in Secondary Market.
425-Unit Climate-Controlled Self-Storage Facility, Hillsborough County, Florida
SBA 504 feasibility study supporting a self-storage project in Hillsborough County.
Ground-Up Climate-Controlled Self-Storage Facility, Sun Belt Suburban Submarket
SBA 504 feasibility study supporting a self-storage project in Suburban Submarket.
250-Stall Marine and Boat Storage Facility, Ottawa County, Michigan
SBA 504 feasibility study supporting a rv & boat storage project in Ottawa County.
Ground-Up Class A RV and Boat Storage, Sun Belt Suburb
SBA 504 feasibility study supporting a rv & boat storage project in Sun Belt Suburb.
Ground-Up Private-Pay Assisted Living and Memory Care, Sun Belt Suburb
SBA 504 feasibility study supporting a senior living project in Sun Belt Suburb.
SBA 7(a) Change-of-Ownership Assisted Living Reposition with Memory Care Conversion
SBA 7(a) feasibility study supporting a senior living project in Secondary Metropolitan Market.
Data Center Colocation Facility, Prince William County, Virginia
Conventional feasibility study supporting a data center project in Prince William County.
Wholesale Colocation Data Center, Ground-Up Development in a Primary Market
Conventional feasibility study supporting a data center project in Primary Data Center Market.
SBA 7(a) Franchise Gym Buildout & Member Ramp, Growing Suburb
SBA 7(a) feasibility study supporting a fitness center & gym project in Growing Suburb.
SBA 504 Full-Service Health Club with Special-Purpose Going-Concern Valuation and Reposition Path
SBA 504 feasibility study supporting a fitness center & gym project in Suburban Trade Area.
Ground-Up Taproom-Focused Craft Microbrewery, Growing Suburb
SBA 504 feasibility study supporting a brewery & distillery project in Growing Suburb.
SBA 7(a) Craft Distillery with Tasting Room and Phased Product Ramp
SBA 7(a) feasibility study supporting a brewery & distillery project in Growing Tourism Market.
Luxury Special-Events Venue, Williamson County, Texas
SBA 504 feasibility study supporting a wedding venue project in Williamson County.
Destination Wedding and Events Venue, Anderson County, Kentucky
USDA B&I feasibility study supporting a wedding venue project in Anderson County.
Robert Mitchell, MAI, SRA, AI-GRS
Certified commercial real estate appraiser with extensive experience in industry guides property valuations across the United States.