
Independent Feasibility Study Company for Lenders and Investors
We give lenders and investors a defensible read on whether a project performs before capital is committed. UnionMetric is an SBA feasibility study company and a USDA feasibility study company in the specific sense that matters to a credit file: our SBA studies are written to SOP 50 10 8 and, for loan numbers issued on or after October 1, 2026, to SOP 50 10 8.1; our USDA studies are written to 7 CFR Part 5001 and the five feasibility factors it enumerates; and both are prepared by an independent qualified consultant with no interest in the transaction closing. Nationwide, every asset class, one team.
We compute the programs we write for
funded SBA 7(a) and 504 loans in our analysis of the agency's FOIA file, FY2010 to FY2026
7(a) lending and 504 debt-financed project capital in that file
USDA's B&I approval rate on submitted loans, FY2021 to FY2023, on submissions that rose 44 percent
share of B&I guarantee authority obligated in FY2024, against 54 percent in FY2020
share of B&I dollars going to accommodation and food services, the sector that holds hotels, RV parks and restaurants
SBA figures are computed from the agency's 7(a) and 504 FOIA releases as of March 31, 2026. USDA approval figures are from the Office of the Comptroller of the Currency's June 2025 review of the B&I program; obligation and sector figures are from a B&I program assessment submitted to the House Agriculture Committee in September 2025, computed from a USDA Rural Development loan-level file. Full tables and methodology sit on the SBA feasibility study and USDA feasibility study pages.
What a feasibility study company does for a lender
A feasibility study company is the independent third party a lender or a guaranty agency turns to when the credit decision cannot rest on operating history. The company quantifies demand for the project from primary data, inventories the competing supply and the pipeline, verifies cost, assesses the operator, builds an auditable projection model and tests debt service coverage at the threshold the program and the lender apply, then documents all of it to a standard the underwriter can cite and the agency can review. The deliverable is written for the credit file, not for the sponsor who usually pays for it.
The two programs that generate most third-party feasibility studies in the United States, SBA and USDA Rural Development, ask for the same thing in different language. SBA expects the participating lender to underwrite prudently and to hold independent support where repayment rests on projections. USDA writes the requirement into regulation, with a dollar threshold, a definition of "new business," five named feasibility factors and a qualification standard for the consultant. A company that prepares studies for both has to know where the two standards diverge, and to write to the one that governs the file in front of it. Our feasibility study consultant guide sets out how the two compare.
Both programs have tightened. SBA rewrote its origination standard for the second time in eighteen months, effective October 1, 2026. USDA's approval rate on submitted B&I loans fell from 89 percent in FY2021 to 53 percent in FY2023 while its guarantee authority went to full use. In that market the study is no longer a formality attached to a good deal. It is the part of the file the reviewer reads to decide.
Feasibility Studies, by Program and Property Type
A feasibility study answers one question: will this project pencil out? We give lenders and borrowers a straight, independent answer that holds up in loan committee. Start with an SBA feasibility study or a USDA feasibility study, or pick your property type below.
An SBA feasibility study company
SBA does not carry a checklist line that says "order a feasibility study." SOP 50 10 8 requires the 7(a) lender or the Certified Development Company to underwrite as it would without the guaranty and to document how it satisfied itself on repayment ability. Where the file depends on projections rather than on the business's own history, the projections need independent support, and the feasibility study is how that support enters the file. In practice the request arrives on new construction, on start-ups, on special-purpose property ( hotels, car washes, gas stations, self-storage, RV parks, senior care, marinas), on a change of use, and on a change of ownership where the buyer projects performance above the seller's record.
SOP 50 10 8.1, issued August 14, 2026 under Information Notice 5000-880695, applies to applications that receive an SBA loan number on or after October 1, 2026. It leaves the feasibility expectation for start-ups, construction and expansions unchanged and rewrites 7(a) change-of-ownership lending in a new Appendix 15: a 1.25x historical coverage test on Initial Acquisitions, Owner Buyouts and ESOP transactions that projections may not be used to meet, a lender-ordered Quality of Earnings report where the business purchase price is $3 million or more, full Standard 7(a) underwriting on every acquisition, and a cap on minority-investor and standby-debt equity at half the required injection. Business Expansions remain at 1.15x on projections. We confirm which SOP governs a file before scoping the study, and we write to that version by section.
Our SBA acquisition report stack planner shows which third-party reports an acquisition file carries on either edition, and runs the coverage arithmetic against the loan-number date. The Feasibility Study Methodology Navigator shows whether a study is required on SBA, USDA and conventional loans, and how each section is prepared.
As an SBA feasibility study company we also maintain our own analysis of the agency's loan-level FOIA file, 877,333 funded loans across FY2010 to FY2026, which lets us place a project's size, structure and industry against the program's actual distribution and its seasoned loss record rather than against impressions. That positioning appears in every SBA study we sign, and the full tables are published on our SBA feasibility study page.
A USDA feasibility study company
USDA Rural Development is the more prescriptive of the two. Under 7 CFR Part 5001, the OneRD regulation governing Business and Industry, Community Facilities, Rural Energy for America and Water and Waste Disposal guarantees, a feasibility study is defined as a report prepared by an independent qualified consultant that evaluates a project's economic, market, technical, financial and management feasibility. For a B&I guaranteed loan greater than $1,000,000 to a new business, 7 CFR 5001.306 requires that study, prepared by an independent qualified consultant acceptable to the Agency, with the scope set by the Agency according to the complexity of the project and the borrower. Community Facilities carries the parallel requirement in 7 CFR 5001.304 for loans greater than $1,000,000 to a new entity or an entity conducting a new activity. REAP adds a technical report on the energy system.
"New business" is a term of art under 7 CFR 5001.3: a business in operation for less than one full year, or one that has operated for a year or more without reaching full operational capacity or stable operations as determined by the Administrator. That definition captures more transactions than sponsors expect, including an expansion into a new market by an existing operator. "Qualified consultant" is also defined, and the regulation's conflict-of-interest provisions bar anyone with a financial interest in the project from preparing the study; what qualifies as an independent qualified consultant is set out separately. The study is submitted through the lender and reviewed by the Rural Development State Office, which on a complete application generally responds within 30 to 60 days; our USDA application to funding timeline sets out the sequence.
The program parameters shape the study. For FY2026, B&I loans under $5 million carry an 85 percent guarantee and loans from $5 million to $25 million carry 80 percent, at a 3.0 percent upfront fee and a 0.55 percent annual retention fee; B&I also requires tangible balance sheet equity of 10 percent for an existing business and 20 percent for a new one, and terms run up to 40 years. As a USDA feasibility study company we organize every study to the regulation's five factors, cross-referenced in a compliance table so the reviewer can verify on sight, quantify the program purpose in the number the Agency scores (jobs by position and wage for B&I under 7 CFR 5001.318, essential community need for CF, energy for REAP), and settle rural eligibility at the address before scoping. See the USDA feasibility study page for the program data.
SBA Feasibility Study
Independent analysis for 7(a) and 504 loans.
USDA Feasibility Study
B&I, Community Facilities, and REAP programs.
Gas Station Feasibility
Fuel volume, c-store revenue, and financial modeling.
Hotel Feasibility
Occupancy, ADR, and RevPAR analysis for lodging projects.
Self-Storage Feasibility
Lease-up, rate, and absorption studies for storage projects.
All Feasibility Services
RV parks, multifamily, car washes, data centers, and more.
What a Lender-Grade Feasibility Study Answers
A feasibility study resolves a single question for the people putting capital at risk: does this project perform under realistic conditions? Answering it credibly means testing the project from every direction a credit committee, an SBA reviewer or a USDA State Office will. USDA names the five feasibility factors in 7 CFR Part 5001: economic, market, technical, financial and management. SBA does not name them but tests the same ground under SOP 50 10 8 and 8.1. Our consultants integrate those dimensions, and the risk analysis that binds them, into one defensible conclusion.
Market Feasibility
Is demand real and durable? We size the trade area, quantify demand against competitive supply, and test absorption over the project's timeline.
Financial Feasibility
Do the numbers hold? We build the operating model, stress-test revenue and expense assumptions, and measure debt-service coverage under downside scenarios.
Technical and Operational Feasibility
Can it be built and run as proposed? We assess site, entitlement, utilities, construction budget and schedule, staffing and the operating plan against the realities of the asset class, and, on USDA files, against the technical factor the regulation requires. Rural projects fail this factor more often than they fail on demand.
Management Feasibility
Can the operator execute? We weigh sponsor experience, capacity, and the track record behind the projections.
Economic Context and Risk Assessment
What happens when assumptions move, and what does the local economy do to them? We place the project in its county and regional economy, model sensitivity around the variables that decide the outcome, and define the conditions under which the project fails.
The result is a clear go / no-go read, documented to a standard that holds up in loan committee.
New for SOP 50 10 8.1
Which reports does your acquisition file need after 1 October?
Valuation, going-concern appraisal, Quality of Earnings, feasibility study. Enter one deal and see which are required, what they cost, whether the appraiser's allocation moves the $3 million line, and whether the three earnings figures agree.
What's Inside Your Study
Every engagement produces a single, defensible document — structured for the lender, the program, and the property type.
- Executive summary and go / no-go conclusion
- Trade-area and demographic analysis
- Demand and competitive-supply assessment
- Revenue and absorption modeling
- Operating pro forma with sensitivity analysis
- Debt-service coverage and break-even analysis
- Program positioning: project size, structure and industry against the SBA loan file distribution, or against B&I and CF program volume and lending mix
- Quantified program purpose on USDA files: jobs created and retained by position and wage, essential community need, or energy produced and saved
- Highest-and-best-use perspective, where relevant
- Program compliance mapping: SOP 50 10 8 or 8.1 by section for SBA files, and a 7 CFR Part 5001 five-factor cross-reference table for USDA files
- Sources, methodology, and analyst credentials
From Scope to Conclusion
- 01
Scope & Proposal
We define the question, the program requirements, and the deliverable, then send a clear proposal with scope, timeline, and fee.
- 02
Data & Market Work
We assemble the market, demographic, and competitive data the asset class requires and build the demand picture.
- 03
Financial Modeling
We construct and stress-test the operating model and coverage analysis.
- 04
Independent Conclusion
We deliver a documented go / no-go read, with the analysis a lender needs to move the file.
Feasibility Studies by Asset Class
Each study is prepared for the loan file: demand and competition measured in the trade area, revenue and cost assumptions tested against the pro forma, and a supported finding on whether the project covers its debt. Pick the property type that matches your transaction.
Multi-Family
Rent comparables, absorption and lease-up pace for market-rate, mixed-use and workforce housing, tested against the pipeline.
RV Park
Transient, seasonal and annual site mix, nightly and monthly rates by season, and occupancy against campground supply in the travel corridor.
Wedding Venue
Bookable dates by season, event capacity and per-event revenue against competing venues in the trade area.
Self Storage
Square feet per capita tested against actual occupancy and the pipeline, not a national average, with unit mix and rate positioning.
RV & Boat Storage
Registered RVs and boats in the trade area, competing supply and rate positioning for outdoor, covered and enclosed spaces.
Car Washes
Cars per day, membership mix and pricing against competing tunnels within drive time, with ramp-up to stabilized volume.
Gas Stations
Fuel gallons and inside sales projected from traffic counts, access and competing stations, with fuel margin and store sales tested separately.
Data Centers
Power availability and interconnection measured first, then lease-up in megawatts, rent by requirement size and yield on cost against the stabilized cap rate.
Hotels
Occupancy, ADR and penetration against a defined competitive set, with demand segmented by commercial, leisure and group generators.
Brewery & Distillery
Taproom traffic separated from distribution volume, so the plan does not depend on wholesale growth it cannot document.
Fitness Centers
Trade-area membership penetration and retention-based dues modeling with churn, ramp and a DSCR test through pre-opening and stabilization.
Assisted Living
Age and income-qualified demand for assisted living and memory care, penetration against existing beds, and the private-pay and payer mix.
2026 Feasibility Methodology Atlas
How demand, supply, revenue, value and physical feasibility are measured for 38 asset classes.
Read the AtlasRecent Feasibility Studies
A selection of the most recent lender-grade feasibility studies delivered across SBA, USDA, and conventional programs.
Manassas, Virginia
SBA 7(a) Child Care Acquisition: Lightbridge Academy of Manassas, Virginia
A 2024-opened, 160-seat franchise child care centre listed at $1.75 million without its building, which would need about 89 per cent occupancy on its historical earnings to carry the loan the price requires.
Not financeable under SBA 7(a) at the asking price on the centre's history
Bensalem, Pennsylvania
SBA 7(a) Collision Repair Acquisition: Bensalem Auto Body, Bucks County, Pennsylvania
A seven-bay collision shop with its real estate on Street Road, listed at $2.95 million, worth about $1.95 million on a benchmark profile and about $2.25 million on the seller's own revenue.
Supportable at about $1.95 million on the benchmark profile, or about $2.25 million if the seller's revenue verifies; not supportable at $2.95 million
Keller, Texas
SBA 7(a) Assisted Living Acquisition: Six-Bed Type B Home, Keller, Texas
A six-bed Type B assisted living home in Keller listed at $1.2 million, which earns about $31,000 a year after paying market staff and works only with more beds or an owner working in it.
Not feasible at the asking price as a six-bed home on market staffing
Concord, North Carolina
SBA 504 Self-Storage, New Build: 256 Davidson Highway, Concord, North Carolina
A 439-unit climate-controlled self-storage project on a $599,000 site in Concord, where land is only 8 per cent of a $7.4 million cost and Charlotte rents leave the finished facility worth 65 per cent of it.
Not feasible at 2026 construction cost and Charlotte rents under SBA 504
Paso Robles, California
SBA 7(a) Winery Acquisition: 2925 Anderson Road, Paso Robles, California
A 10.55-acre Willow Creek winery and tasting room listed at $3.75 million without its brand, where a benchmark winery's earnings carry $1.69 million of SBA debt and the buyer funds 62 per cent of the deal.
Supportable only as an equity-heavy acquisition with the brand, club and inventory transferring; not supportable at the $3.75 million asking price on a conventional SBA structure
Mesa, Arizona
SBA 504 RV and Boat Storage, New Build: Higley and Thomas, Mesa, Arizona
An entitled 640-space RV and boat storage site on the Loop 202 in Mesa, where a land price set like a finished facility leaves a $15.3 million project worth $10.2 million and covering its debt 0.72 times.
Not feasible at the $6.5 million land price and 2026 development cost under SBA 504
72-Key Boutique Resort Conversion, Maui County, Hawaii
SBA 504 feasibility study supporting a resort project in Maui County.
Destination Wedding and Events Venue, Anderson County, Kentucky
USDA B&I feasibility study supporting a wedding venue project in Anderson County.
Multi-Operatory Dental Practice Acquisition, King County, Washington
SBA 7(a) feasibility study supporting a healthcare project in King County.
Three-Unit Quick-Service Restaurant Portfolio, Wake County, North Carolina
SBA 7(a) feasibility study supporting a restaurant project in Wake County.
SBA 504 Feasibility Study, Ground-Up Special-Purpose Construction
A program-level SBA 504 feasibility study for ground-up special-purpose construction: the three-part capital stack, independent demand and absorption validation, and coverage modeled on the blended structure.
SBA 7(a) Feasibility Study, Special-Purpose Change of Ownership
A program-level SBA 7(a) feasibility study for a special-purpose change of ownership: the SOP 50 10 8 trigger, the special-purpose equity injection, the going-concern appraisal interplay, and coverage under conservative sensitivity.
Why Lenders Work With Us
For more than two decades, lenders, CDCs, and developers have come to us for one thing — a defensible, independent read on whether a deal performs, nationwide.
Straight, Independent Answers
We don't work for the borrower or the developer. Our only job is to tell you whether the numbers hold up.
We Speak SBA and USDA
Our studies are written to SOP 50 10 8 and, from October 1, 2026 by loan-number date, SOP 50 10 8.1, and to USDA's 7 CFR Part 5001 five-factor standard, so files move through committee and State Office review with fewer questions.
MAI-Backed Expertise
Every study is led by MAI-designated professionals who bring real valuation discipline to the work.
Coast to Coast
We cover all 50 states and every major commercial property type.
How to choose a feasibility study company
Lenders ask us this more often than sponsors do, usually after a study from elsewhere has been sent back. Six tests separate a feasibility study company whose work moves a file from one whose work stalls it.
Independence you can document
The company has no brokerage, development, financing or equity interest in the transaction. Under 7 CFR Part 5001 that is a regulatory condition; under SBA it is what makes the study third-party rather than a sponsor exhibit with a cover page. Ask how the fee is set. A fee that is a percentage of the loan, or contingent on the finding, is not independent.
Written to the operative program text
The study should cite SOP 50 10 8 or 8.1 by section on an SBA file and 7 CFR Part 5001 by section on a USDA file, and it should know which one governs, including which side of the October 1, 2026 loan-number line an SBA file sits on and which fiscal year's OneRD fee notice applies to a USDA file. Note that the FY2026 OneRD notice did not publish until March 2026, so the operative schedule is a thing to confirm rather than assume.
Demand built from primary data
Trade area defined and defended, demand computed from traffic counts, demographics, registrations, visitation and franchise disclosures, competitors physically inventoried including the pipeline. If the demand section reads as a narrative rather than a calculation, the committee cannot check it.
Coverage tested at your threshold
Operating and global coverage, year by year, before and after replacement reserves, at the number in your credit policy and the program, not at a universal advertised ratio. Be wary of any company that promises every study passes a fixed pair of numbers.
A record with the reviewers who will read it
Ask which lenders, CDCs and USDA State Offices have accepted the company's studies, and how many came back. With USDA approving 53 percent of submitted B&I loans in FY2023 against 89 percent two years earlier, first-time acceptance is worth more than it was.
Valuation discipline behind the projections
On special-purpose property the feasibility study and the going-concern appraisal have to reconcile: the allocation among real estate, equipment and intangibles, the replacement reserve, the stabilized income. A company led by MAI-designated professionals writes the study knowing what the appraiser will have to defend, and, when the lender wants both from one team, prepares them under separate engagements so neither compromises the other.
Read how we apply these tests on SBA files, USDA files and across our appraisal and feasibility services.
What Clients Say
“Always a pleasure reviewing feasibility studies from UnionMetric. Recommended.”
HoJae Chang
SBA Underwriter, First National Bank, SBA Division
“We sent over a Hotel SBA 7(a) feasibility study and were not disappointed. UnionMetric made our loan review process smoother and faster than we expected.”
Carlos Salcido
Senior SBA Underwriter, BayFirst National Bank
“I was trying to determine whether a new car wash location was suitable. UnionMetric’s feasibility study helped me understand that, and it was delivered ahead of the timeline. Highly recommended.”
Mitch Smith
CEO, Smith CRE Development
Feasibility Studies, Answered
Need to Know if Your Project Works?
Tell us about your project and we'll send a clear proposal: scope, timeline, and fee.