Feasibility Study Consultant in Dallas, TX
Read by a credit officer, a Dallas feasibility study is the evidence that a project earns enough to carry the value the lender's appraiser will conclude and the loan sized against it. Texas keeps sale prices confidential, so the study has to bring its own income and cost support for that value, load a 2.23 percent property tax rate into the capitalization rate, and reconcile the as is, as completed and as stabilized premises to the coverage and loan-to-value tests the file applies.
What moves a Dallas value conclusion
Non-disclosure: the sales comparison grid starts short
Texas is a non-disclosure state: under Tax Code § 22.27, sale prices volunteered to an appraisal office or the Comptroller under a promise of confidentiality are closed to public inspection. Article VIII, § 29 of the Texas Constitution bars any law passed after January 1, 2016 from taxing a conveyance of fee simple title, so no transfer-tax return carries a price into the deed record either. The Dallas County appraisal district (www.dallascad.org in the Comptroller's county directory) still values every parcel at market as of January 1, working without a public file of closed prices.
Every Dallas comparable therefore has to be confirmed with a party to the deal or drawn from the appraiser's own files, and a grid of confirmed trades is narrower than one built on recorded prices. With fewer, harder-won sales, reconciliation leans on the income approach, and the feasibility study is where that income evidence is assembled: the operating history or market-supported pro forma, the expense load including the tax stack below, and the capitalization logic.
Five taxing units and a 2.23-point load on the cap rate
The state levies no ad valorem tax of its own (Texas Constitution Article VIII, § 1-e), so every dollar of a Dallas tax bill is local. Commercial property is appraised at market value as of January 1 under Tax Code § 23.01, with no fractional assessment ratio, and Tax Code § 25.18 requires each district to reappraise all property at least once every three years. A commercial parcel inside the City of Dallas, Dallas ISD and Dallas County carries the five 2025 adopted rates below, each stated per hundred dollars of taxable value.
| Taxing unit | 2025 adopted total rate |
|---|---|
| Dallas County | 0.215500 |
| Parkland Hospital (Dallas County Hospital District) | 0.212000 |
| Dallas College | 0.106575 |
| City of Dallas | 0.698800 |
| Dallas ISD | 0.993835 |
| Five units combined | 2.226710 |
The arithmetic in words: 0.215500 plus 0.212000 plus 0.106575 plus 0.698800 plus 0.993835 comes to 2.226710 dollars per hundred dollars of value. Because the parcel is carried at full market value, that is an effective rate of 2.23 percent of value a year. An appraiser who capitalizes net operating income before real estate taxes adds that rate to the base capitalization rate, so the loaded rate sits about 2.23 percentage points higher; one who expenses the bill leaves the rate unloaded. The study and the appraisal must take the same route, and the study names the units it summed so that a parcel in another school district or a special district is not underwritten on the wrong stack.
The circuit breaker in Tax Code § 23.231 limits the yearly rise in appraised value of non-homestead real property to 20 percent plus new improvements, for property valued at $5,320,000 or less in 2026. It starts only in the tax year after the owner's first January 1 of ownership, and the section expires December 31, 2026, so a Dallas acquisition should not inherit the seller's capped value and no projection should carry the cap past its expiry. Protests go to the appraisal review board by May 15 or thirty days after the notice, whichever is later; the board's order can go to district court within 60 days, or to the State Office of Administrative Hearings when the board's value exceeds $1 million.
Permits and the cost approach
The Building Permits Survey counts 71,788 housing units authorized across the Dallas-Fort Worth-Arlington metro in 2024 and 66,179 in 2025, a 7.8 percent decline, with permit valuation down from $17.67 billion to $16.31 billion. The mix moved against the total: single-family authorizations fell from 46,440 to 39,790, while units in buildings of five or more rose from 23,150 to 24,607, lifting the apartment share of the year's units to 37.2 percent.
| Measure | 2024 | 2025 |
|---|---|---|
| All housing units authorized | 71,788 | 66,179 |
| Single-family units | 46,440 | 39,790 |
| Units in buildings of five or more | 23,150 | 24,607 |
| Permit valuation | $17.67 billion | $16.31 billion |
| Valuation per authorized unit | $246,149 | $246,470 |
Permit valuation is the builder's declared cost, not a cost-service estimate, so it never replaces the replacement-cost build-up in the appraisal; what it shows is a Dallas cost approach prepared in an active construction market, where contractor pricing and entrepreneurial incentive can be supported from current bids. For a new apartment or hospitality project, the same permits are competing supply the income approach must absorb before stabilized occupancy.
Jobs, pay and migration behind the income approach
County Business Patterns counts 1,648,702 paid employees in Dallas County in mid-March 2023 and an annual payroll of $131.9 billion, an average of $80,015 per job. Health care and social assistance is the largest sector at 190,232 employees; transportation and warehousing follows at 151,067 with $11.17 billion of payroll; accommodation and food services employs 141,469 at an average of $28,655; and finance and insurance pays the highest average of the sectors shown, $125,833 across 109,454 jobs.
The population record separates the city from the region. Dallas city moved from 1,304,341 at the April 2020 estimates base to 1,329,491 in July 2025, a gain of 1.9 percent, while the eleven-county metro grew 11.0 percent to 8,477,157. In the year to June 2025 the metro added 55,444 residents through net international migration, 18,197 through net domestic migration and 50,819 through natural increase. Median household income is $70,518 in the city, $76,547 in Dallas County and $90,275 across the metro. A market area drawn on the city limits understates demand landing in the suburban counties, and a city-core project cannot claim that growth as its own.
SBA 7(a) and 504 underwriting for a Dallas County project
Dallas County sits in the territory of the SBA Dallas / Fort Worth District Office in Euless, which serves 72 counties in northeastern Texas. SBA's authority to ask for a study is in 13 CFR 120.160(b): SBA may require professional appraisals, a survey or a feasibility study, which is a permission, not a blanket rule. For 504 files, SOP 50 10 8.1 lists five conditions that may cause SBA to request one: market saturation by industry type and location, a unique market concept, highly specialized project property, project size out of proportion to the community served, and rapid growth of the applicant or its affiliates with a matching rise in undisbursed or unseasoned debt. In a metro of 8.5 million the size condition seldom fits; saturation and specialized property are the conditions a Dallas hotel, car wash or storage file is likelier to meet.
Thresholds and the appraiser's credential
Under 50 10 8.1 a 504 project property estimated above $500,000 needs a real estate appraisal, and the appraiser must be State-certified once the estimate exceeds $1,000,000; Appendix 19 draws the same certification line for 7(a) commercial property. The bank regulators' rules, 12 CFR 34.43(d)(2) and its FDIC twin 12 CFR 323.3(d)(2), require a State certified appraiser for federally related commercial transactions over $500,000, and in Texas the credential covering every property type is the TALCB Certified General Appraiser. The report must follow USPAP and be dated within 12 months of the application.
Premise of value, going concern and the 90 percent test
An existing building bought without construction is appraised as is; new construction, or renovation costing more than one-third of the purchase price or market value, is appraised at market value upon completion; an income property still leasing up also needs the prospective value as stabilized. Because a Dallas borrower cannot pre-test the estimated value against a public price file, the 90 percent rule bites: a 504 appraisal below 90% of the estimated value forces a smaller debenture or added collateral or investment, and a 7(a) lender may not close below 90% without SBA's prior written permission (a PLP lender may close with a written justification in the file).
For a hotel, a 504 appraisal engaged for going-concern value must allocate separate values to land, building, equipment and the business including intangibles, and a 7(a) collateral appraisal may not count intangible value at all. Lodging is on SBA's limited or special purpose list, so the study separates real property income from furniture, fixtures and equipment and from business value, and debt is sized on what the real property supports.
Coverage and the 504 capital stack
Standard 7(a) loans need debt service coverage of 1.15 on a historical or projected basis and 1:1 globally, with a new business reaching 1.15 within two years of funding; an initial-acquisition change of ownership needs 1.25:1, and every 504 loan needs 1.15:1. The ordinary 504 stack is a Third Party Lender at 50% or more, a CDC debenture of up to 40% and a borrower injection of at least 10%. A new business or a special purpose property lifts the contribution to 15% with the debenture capped at 35%, and both together require 20% against a debenture of no more than 30%, the figure a first-time Dallas hotel operator's sources and uses must carry.
USDA Business and Industry eligibility around Dallas
The USDA guaranteed-loan rules in 7 CFR Part 5001 define a rural area as one outside any city or town of more than 50,000 inhabitants and outside the urbanized area contiguous and adjacent to such a city. Vintage 2025 estimates count 28 incorporated places above 50,000 residents in the Dallas-Fort Worth-Arlington counties, and Dallas itself holds 1,329,491. The rule runs on decennial census figures and urbanized-area boundaries, so that count is a screen rather than a ruling, but it tells a lender that most of the developed metro is out and that any eligible Dallas-area site will be an address outside those cities and their contiguous urbanized area. Lenders confirm the address on USDA's eligibility map before a study budget is spent.
Where an address qualifies, part 5001 is more prescriptive than SBA. A B&I guaranteed loan above $1,000,000 to a new business requires a feasibility study by an independent qualified consultant acceptable to the Agency. Real estate collateral worth more than $250,000 needs a State Certified General Appraiser; a construction project needs both the as is and the prospective completed value; any going-concern value comes out of the reconciled market value before discounting; and the appraisal can be no more than one year old. A new business generally needs 20 percent balance sheet equity, and appraisal surplus does not count.
Twelve property types in Dallas County: the Census count and the use table
A Dallas lender reading a study for one of the twelve property types wants two things before any projection: how many operating comparables exist, and whether the use is lawful where the subject sits. The first table sets the County Business Patterns establishment counts for Dallas County against the eleven-county metro, and the second sets the use table in the version of Dallas Development Code that the city posts. That posted text is the 2018 text: the city's current code library is closed to our crawler, so every section number below is a 2018 reading and the study confirms the current section before it relies on one.
| Property type | Census code | Dallas County establishments | Metro establishments (eleven counties) | County share of metro |
|---|---|---|---|---|
| Hotel | NAICS 721110 | 561 | 1,256 | 44.7 percent |
| Self-storage | NAICS 531130 | 241 | 705 | 34.2 percent |
| RV and boat storage | NAICS 531130 (same code) | 241 | 705 | 34.2 percent |
| RV park | NAICS 721211 | 10 | 52 | 19.2 percent |
| Gas station | NAICS 447110 and 447190 | 715 | 2,170 | 32.9 percent |
| Car wash | NAICS 811192 | 137 | 487 | 28.1 percent |
| Assisted living | NAICS 623312 | 91 | 278 | 32.7 percent |
| Multifamily | NAICS 531110 | 780 | 1,808 | 43.1 percent |
| Wedding venue | NAICS 722320 | 125 | 258 | 48.4 percent |
| Restaurant (limited-service) | NAICS 722513 | 2,514 | 7,167 | 35.1 percent |
| Daycare | NAICS 624410 | 509 | 1,577 | 32.3 percent |
| Industrial (warehousing) | NAICS 493110 | 288 | 576 | 50.0 percent |
County share is the percentage of the metro's establishments that sit inside Dallas County. A share near one half, as in warehousing and wedding caterers, says the county is the market and a trade area drawn on its borders is nearly the whole comparable set; a share near one quarter or one third, as in car washes, self-storage and gas stations, says that most competing supply sits in Tarrant, Collin, Denton and the other counties, and that a Dallas study has to census them.
| Use | Section | In the RR district | Other districts named in the text |
|---|---|---|---|
| Hotel or motel | § 51A-4.205(1) | By right in RR; sixty or fewer guest rooms need a specific use permit | By right also in MO(A), GO(A), CS, LI, IR, IM and central area; SUP only in CR |
| Mini-warehouse (self-storage) | § 51A-4.213(7) | SUP only | By right in CS, industrial and central area districts; SUP also in CR |
| Campground or RV park | § 51A-4.209(4) | Not allowed | By right only in MH(A) |
| Motor vehicle fueling station | § 51A-4.210(19) | By right | By right in CR, CS and industrial districts |
| Car wash | § 51A-4.210(6) | By right with residential adjacency review | By right in CR, CS, industrial, mixed use and MC districts |
| Nursing or convalescent home (nearest to assisted living) | § 51A-4.204(8) | Not allowed | By right in multifamily, central area mixed use and urban corridor districts |
| Multifamily | § 51A-4.209(5) | Not allowed | By right in CH, multifamily, central area, mixed use and urban corridor districts |
| Child-care facility | § 51A-4.204(3) | By right | By right in retail, CS and industrial districts |
| Warehouse | § 51A-4.213(15) | Not allowed | By right in CS, industrial and central area districts |
| RV and boat storage, wedding venue, restaurant | Not verified | No verified record | The 2018 text we could reach was checked only for the nine uses above |
The RR column is the one the city's posted extract covers in full. A parcel zoned CS, a planned development district or a conservation district has its own regulations that this table does not reproduce, which is why the study reads the district's own text for the subject parcel and records any adjacency review. Where a cell says no verified record, an open primary source did not show the use, and the study does not fill the gap from memory.
Hotel feasibility study consultant in Dallas: where fifteen percent of a room's cost goes to tax
Dallas County counted 561 hotel and motel establishments in 2023, 44.7 percent of the 1,256 in the eleven-county metro, so the sales comparison approach has a deep set of operating comparables inside the county before it reaches Tarrant or Collin County. Those properties employed 16,653 people on $710.0 million of payroll, or $42,633 per employee. In the income approach that average is the check on a proposed staffing plan: a plan far below it has to say which services the hotel will not provide, and the lender's appraiser will ask the same question.
A room in the city carries the state's 6 percent hotel occupancy tax, the city's 7 percent under Tax Code Chapter 351 and a further 2 percent venue hotel tax under Local Government Code Chapter 334, Subchapter H: 15 percent of the cost of a room, on the city's fiscal 2025 rates as reported to the Comptroller. A guest who stays at least 30 consecutive days is a permanent resident and owes none of it, so extended-stay revenue has to be tracked separately from transient revenue. On zoning, the posted 2018 text of § 51A-4.205(1) allows a hotel or motel by right in the RR (Regional Retail) district, but a hotel of sixty or fewer guest rooms needs a specific use permit and residential adjacency review applies. Texas has no city minimum wage to add to the labor line: Labor Code 62.0515 makes the state's $7.25 floor supersede a local wage ordinance. Furniture and equipment are taxable property in Texas, and the Dallas Central Appraisal District set April 15, 2026 as the rendition date for business personal property.
In a Dallas hotel study the 15 percent is a pass-through collected from guests, so room revenue is stated before tax and the taxes appear on a separate line; a lender that capitalizes a revenue figure with the tax inside it values a number the owner never keeps. A small hotel in the RR district adds a hearing before construction starts, which moves the date of the prospective value as completed and leaves the as is value of the land without the entitlement. Because lodging is special purpose property under SBA rules, the study also allocates the going-concern value among land, building, furniture and equipment and the business, and the equipment line is the one the April rendition touches. See the hotel feasibility study, the Texas hotel section and the SBA 504 hotel leaf.
Self-storage feasibility study consultant in Dallas: an SUP in the retail district, by right in industrial
Dallas County held 241 lessors of miniwarehouses and self-storage units in 2023, 34.2 percent of the metro's 705, with 625 paid employees and $28.4 million of payroll, about $45,421 per employee. Those are lean staffing numbers, and they tell the expense line of the income approach to expect few on-site employees per facility. The county holds roughly a third of the metro's establishments, so a Dallas study for a site near the county line has to census Tarrant, Collin and Denton facilities too, and a lender's sales comparison grid will draw on all of them.
The posted 2018 text of § 51A-4.213(7) requires a specific use permit for a mini-warehouse in the RR district and allows one by right in industrial districts such as IR, and the same section defines the use as compartmentalized storage units with a stated maximum floor area for each. Texas lien law is Property Code Chapter 59. A lessor may sell only for charges due and unpaid, after written notice of claim and the tenant's right to pay until the 14th day after delivery; the sale cannot occur before the 15th day after the notice of sale is first published. Notice can go by e-mail only if the rental agreement says so in underlined or conspicuous bold print, and the lien itself depends on a contractual landlord's lien in the agreement. Texas sets no minimum default period beyond those steps.
The worked case is the delinquency reserve. From delivery of notice of claim to the earliest sale, the statute runs at least 29 days (14 days to pay, then 15 days after first publication), and any delay in publication adds to it. A study therefore models each delinquent unit as at least a month of lost rent and a legal cost, not as a quick auction, and it shows the reserve as a sensitivity. The zoning route is the second variable: a parcel in RR needs an SUP hearing before construction, so the prospective value as completed follows that approval, while an industrial parcel avoids the hearing and may face a different land price and a different appraiser's comparison set. Read the self-storage feasibility study, the Texas self-storage section and the conventional-loan leaf.
RV and boat storage feasibility study consultant in Dallas: the lien law's tow remedy and an unverified outdoor-storage use
The state rule comes first, because it differs from the unit-by-unit auction of a conventional facility. Under Property Code Chapter 59, Subchapter D, a lessor may have a titled motor vehicle, trailer, semitrailer, motorboat, vessel or outboard motor towed to a vehicle storage facility if the rental agreement authorizes it, the tenant has not paid by the 14th day after notice of claim is delivered, and the vehicle storage facility agrees in writing. The lessor's lien ends when the property is towed and the lessor is not liable for damage during or after the tow. For a Dallas RV or boat lot that turns the collection remedy into a transfer of the collateral risk to a third party, which belongs in the bad-debt reserve as a lower recovery on a smaller number of units, not as a sale proceeds line.
Zoning is the harder question. The Census does not isolate vehicle storage, and the NAICS 531130 count shown in the Dallas County table above is therefore an upper bound on the comparable set, not a count of RV and boat lots. In the posted 2018 text, a mini-warehouse is a use of compartmentalized units, which sits uneasily with an open lot of parking stalls or oversized bays, and the same text lists a campground only by right in the MH(A) district, so no RV-oriented use is allowed in the RR district by default. No verified record shows how the 2018 text classifies outdoor storage of recreational vehicles and boats, and the study does not assume that the self-storage use table governs it. An open primary source does not show it, so the study asks for the zoning verification letter for the subject parcel before it sets a premise.
Why it matters to the lender: an as is value presumes a lawful use. If the parcel's district allows storage only by permit, the appraiser values the land for what it can lawfully hold now and the study values the lot as completed only after the permit issues. Collateral that is a gravel lot and a fence has little building value, so the cost approach is thin and the income approach carries the conclusion, with the delinquency model above and a tow-cost line in the expense schedule. Texas taxes tangible personal property, so equipment the owner uses is rendered by April 15; the customers' vehicles are not the owner's property. For the next step, compare the RV and boat storage service, the state hub on vehicle storage and the SBA 7(a) leaf.
RV park feasibility study consultant in Dallas: ten campgrounds and a state fire standard
Dallas County reported 10 RV park and campground establishments in 2023, 19.2 percent of the metro's 52, with 31 paid employees and $978,000 of annual payroll, about $97,800 per establishment. Ten comparables in a county of 2.66 million residents is too few for a paired-sales grid, so the sales comparison approach has to reach into the other ten counties of the metro, and the income and cost approaches carry more weight in the reconciliation than they would for a hotel. A payroll that small per establishment also says the operating model is owner-run with seasonal help, and the expense line should be built from the operator's own schedule, not from the county average.
On zoning, the posted 2018 text of § 51A-4.209(4) lists a manufactured home park or campground, defined to include a campground that rents space to recreational vehicles, tents or manufactured homes, as permitted by right only in the MH(A) district, so it is not allowed in the RR district. A Dallas RV park is therefore a rezoning or an MH(A) parcel, a fact that fixes the land supply and the as is value of any other-district site. The state rule is newer than most lenders' checklists: Health and Safety Code chapter 762, effective in September 2025, requires every privately operated campground to comply with NFPA 1194 (2021 edition) and bars local governments from imposing stricter sanitation, electrical, LP-gas or fire standards. An operator must also install a roof-access ladder in each cabin inside the 100-year floodplain and file flood, evacuation and shelter-in-place plans with the county and city emergency management coordinator. The chapter names no state licensing agency.
For the study, the state standard is helpful and the zoning is not: the fire, electrical and sanitation capital budget can be priced against one national standard instead of a city-by-city list, while the district limit decides whether the project can be built at all. Cabins in the floodplain carry a cost in the cost approach and a plan-filing duty in operations. Whether the city's hotel occupancy tax reaches campsite rent is not shown by the verified record: the Comptroller's hotel page covers hotels, motels, bed and breakfasts and rented houses, and does not name RV sites, so the study asks the Comptroller before it puts a tax line on site revenue. Examples of the underlying logic are in the RV park feasibility study, the Texas RV park section and the 504 leaf for campgrounds.
Gas station feasibility study consultant in Dallas: by right in four districts and thin supply of fuel-only sites
Dallas County had 715 gasoline station establishments in 2023, 32.9 percent of the metro's 2,170. The convenience-store format accounts for 660 of them and fuel-only stations for 55, so the comparable set for a fuel-only site is thin, and a Dallas study for one has to say whether the buyer pool values it as a fuel business or as land. Together the two groups employed 6,382 people. Convenience-format stations paid about $28,841 per employee on $163.2 million of payroll, so in-store labor is modest and the income approach turns on fuel margin and the store's inside sales.
Dallas allows a motor vehicle fueling station by right in the RR district under the posted 2018 text of § 51A-4.210(19), and in CR, CS and industrial districts; the definition covers fuel dispensed from pumps or from electric vehicle charging stations and excludes truck stops. A truck stop is therefore not covered by that by-right entry. Texas taxes gasoline at 20 cents a gallon and diesel at 20 cents a gallon, so the state's excise is a fixed cost built into the pump price, not a margin line.
What the study does with this: the 20 cents is collected on the gallon, so the gross margin the income approach capitalizes is measured after the tax and any pump-price movement is stated in cents against it. Because the use is by right in several districts, the entitlement risk is low and the study can date the prospective value as completed from permit and construction time rather than a hearing. The risks that remain are the ones a gas station buyer faces outside zoning, and the verified record set for Texas contains no tank-assurance or environmental-cleanup rule, so this page states none; the study cites the regulator's own page for the subject's tanks and treats a clean closure record as a condition of collateral value. A fuel-only site that sells no merchandise has little inside-sales income to fall back on, so its reconciliation rests more heavily on the cost approach and the land. See the gas station feasibility study, the state hub on fuel retail and the conventional fuel leaf.
Car wash feasibility study consultant in Dallas: residential adjacency review and an 8.25 percent combined rate
Dallas County counted 137 car washes in 2023, 28.1 percent of the metro's 487, with 1,584 employees and $46.0 million of payroll, about $29,015 per employee. Because only a bit more than a quarter of the metro's car washes are in Dallas County, a study for a tunnel wash on the county line draws its sales comparables and its competitive set from two or three counties at once. Payroll per employee is the figure to hold against a proposed crew: an express tunnel run with a handful of attendants will sit below this average, and one with full-service detailing above it.
The posted 2018 text of § 51A-4.210(6) permits a car wash by right in the RR district, and in CR, CS, industrial, mixed use and MC districts, with residential adjacency review required in RR, CS, industrial, mixed use and MC districts. The review is an added step in those districts, and the study reads its requirements in the code text for the subject site. The Comptroller's rate table puts the City of Dallas at a combined state and local sales tax rate of 8.25 percent. Whether a given wash charge is a taxable sale is a question of state tax rules that the verified record set does not answer, so the study applies the combined rate only after the operator's tax advisor confirms the charge categories. Labor is priced at the state's $7.25 floor, because Labor Code 62.0515 supersedes any Dallas wage ordinance.
In practice the adjacency review is the car wash's entitlement risk even though the use is by right: a site that touches a residence carries a review period in the schedule and may carry a mitigation cost in the budget, and the cost approach should show both. A lender's appraisal of a car wash is partly an appraisal of equipment that is bolted to the real property, so the study separates the building and site from the tunnel equipment and the going concern, a split that matters for the April 15 rendition of equipment in Texas, where the Appraisal District taxes business personal property. See the car wash feasibility study, the Texas car wash section and the SBA 7(a) car wash leaf.
Assisted living feasibility study consultant in Dallas: a licence tier before the building value
Dallas County had 91 assisted living establishments in 2023, 32.7 percent of the metro's 278, employing 3,409 people on $112.2 million of payroll, or $32,907 per employee. The county holds about one third of the metro's facilities, so a Dallas study measures its competing supply across the metro, not only inside the county. The payroll average is the first test of a staffing schedule in the income approach, because care labor is the largest operating cost in the use and the average sits far above the state minimum wage of $7.25.
Texas licenses the use as an assisted living facility under Health and Safety Code Chapter 247, administered by the Health and Human Services Commission, and every facility is licensed as Type A or Type B according to its residents' ability to evacuate. Size sets a second tier: a small facility is licensed for 16 or fewer residents and a large facility for seventeen or more, with different construction requirements, and licensing applies once food and shelter go to four or more unrelated people. On zoning, the posted 2018 text of the Dallas code has no separate assisted living use; its nearest use, convalescent and nursing homes and similar institutions in § 51A-4.204(8), is not listed for the RR district and is allowed by right in multifamily, central area mixed use and urban corridor districts. That mapping is ours, because the text does not name assisted living, and a Dallas study asks the city how it classifies the subject.
Two consequences follow for a lender. First, the licence tier fixes the cost approach: a facility sized just over the small-facility cut-off is built to the large-facility construction rules, so a project that adds a wing can change the cost of the whole building. Second, licensure comes after construction, so the prospective value as completed is dated on the licence, and the value as stabilized waits for occupancy. A facility that is not licensed cannot be valued as one. In SBA files the assisted living building is limited or special purpose property, so the going-concern allocation among real property, equipment and the operating business is mandatory when business value is in the price. The state record shows nothing on a certificate-of-need requirement, and the study does not assume one. See the assisted living feasibility study, the state hub on senior care and the 504 senior care leaf.
Multifamily feasibility study consultant in Dallas: no rent control, a pipeline still growing
Lessors of residential buildings and dwellings numbered 780 establishments in Dallas County in 2023, 43.1 percent of the metro's 1,808, with 7,546 employees and $605.6 million of payroll, about $80,249 per employee. That is the property-management side of apartments, and it supports the expense line: the average pay for managers and staff is a Census anchor for a management-and-payroll budget. On the demand side, Dallas has 533,915 households, the county 982,737 and the metro 2,891,725, so a project's trade area can be drawn inside the city or across the county line and the choice changes the households the study counts.
Supply is the sharper evidence. Units authorized in buildings of five or more across the Dallas-Fort Worth-Arlington metro rose from 23,150 in 2024 to 24,607 in 2025, a 6.3 percent increase, even as total authorizations fell. That pipeline is the lease-up competition a new Dallas project meets before stabilized occupancy. The posted 2018 text of § 51A-4.209(5) allows multifamily by right in CH, multifamily, central area, mixed use and urban corridor districts and does not list it for the RR district, so a parcel in a retail district is a rezoning. State law limits local rent regulation: a municipality may establish rent control by ordinance only if its governing body finds a housing emergency due to a disaster and the governor approves it, and a landlord must refund a security deposit by the 30th day after the tenant surrenders the premises, after itemizing any deductions in writing.
The study uses these facts three ways. Because rent regulation is available only after a declared disaster and gubernatorial approval, its projections need no rent-control scenario beyond a stated assumption that none applies, and the lender sees that the income stream is not capped by local ordinance. The rezoning point decides the as is value of a retail-zoned site: its value is for the use the district allows today, and the prospective value as completed assumes the change. And the pipeline sets the lease-up period that the value as stabilized needs. A project in the by-right districts, delivered into a pipeline that grew by 6.3 percent, may stabilize later than the sponsor's schedule, which is a test of the debt service coverage ratio rather than a certainty. See the multifamily feasibility study, the Texas multifamily section and the conventional apartment leaf.
Wedding venue feasibility study consultant in Dallas: banquet halls inside the caterer code and one liquor permit
The Census has no wedding venue code. The nearest is NAICS 722320, Caterers, which includes banquet halls with catering staff, so the count below is an upper bound on halls and a floor on caterers. Dallas County listed 125 such establishments in 2023, 48.4 percent of the metro's 258, with 1,274 employees and $49.3 million of payroll, or $38,728 per employee. With nearly half the metro's establishments, Dallas County is close to the whole market for a venue that draws guests from the urban core, and a trade area drawn on the county line misses few comparables. The payroll average blends event staff, many of them part-time, and is a check on a banquet labor budget, not a wage rate.
Alcohol sets the structure of a venue's income. Texas has had no separate caterer's permit since September 1, 2021; the Mixed Beverage Permit authorizes on-premise sale of spirits, wine and malt beverages and includes authority to hold events at a temporary location away from the permitted premises, subject to TABC approval. The state fee is $5,300 for an original two-year permit and $2,650 for a renewal, and cities and counties may add local fees that the TABC chart does not show. No verified Dallas zoning record covers banquet halls or event venues, and an open primary source reachable to us did not show the use in the 2018 text, so the study reads the use table for the subject district and treats the permission as a condition, not an assumption.
The study separates the venue's two income streams. Rent from the hall is real property income; food, beverage and event services are business income, and the permit is part of the business, not the building. The lender's appraisal therefore needs a going-concern allocation among land, building, equipment and the intangible business, and the study shows the venue's net operating income both ways: with the bar as a profit centre and with an outside caterer and no alcohol. The permit is a recurring cost in the second case and a gating condition in the first; whether it can transfer with a sale is a legal question the study does not assume. The first two-year permit fee is a start-up cost that the sources and uses statement carries, and the renewal is an expense line in the pro forma. See the wedding venue feasibility study, the state hub on event venues and the 504 event venue leaf.
Restaurant feasibility study consultant in Dallas: limited-service labor at the federal tip floor
Limited-service restaurants are the deepest comparable set in the Dallas record: 2,514 establishments in Dallas County in 2023, 35.1 percent of the metro's 7,167, employing 51,478 people on $1.14 billion of payroll. Payroll per employee is $22,111, an annual figure that blends full-time and part-time workers, and the right comparison for a counter-service labor budget is the hours-weighted average, not this number alone. With such a large local set, a study can build the sales comparison and the income approach from operating comparables, and the metro's one-third remainder sits in Tarrant, Collin and the other counties.
Dallas adds no wage layer of its own: Labor Code 62.0515 makes the state's $7.25 minimum supersede any city ordinance, and a tipped employee's cash wage is set by the federal rule at $2.13, with tips making up the difference to the minimum. A quick-service concept without tipping budgets the full floor. The Comptroller's table sets the combined state and local sales tax rate in the city at 8.25 percent, which the study applies to taxable menu sales. Cooking equipment, furniture and signage are business personal property and are rendered to the Appraisal District by April 15. No verified Dallas zoning record covers restaurants, so the study reads the district's use table for the subject and records any further permit the concept needs.
The Dallas restaurant study therefore runs on three tests. Labor is projected at the floor for non-tipped roles and the cash wage for tipped ones, with a payroll-tax load, and the Census average above is the sanity check. Sales are stated net of the 8.25 percent tax, so the revenue a lender capitalizes is what the operator keeps, and the study shows the tax as a pass-through line beside it. The collateral view separates the leasehold or building from the kitchen equipment, because an equipment-heavy build-out is taxed annually and cannot be counted as real property; SBA's going-concern rules ask the same of a restaurant purchase that includes the business. See the restaurant engagement overview, the Texas restaurant section and the 7(a) restaurant leaf.
Daycare feasibility study consultant in Dallas: by right in retail, licensed by the state
Dallas County had 509 child day care establishments in 2023, 32.3 percent of the metro's 1,577, with 6,904 employees and $204.6 million of payroll, about $29,629 per employee. In a child care centre payroll is the largest expense, so that average, against the state's $7.25 floor, is the first test of a staffing plan in the income approach. A county share of about one third means most competing centres sit outside the county, and a study draws the subject's trade area around the households a parent can reach on a commute.
The posted 2018 text of § 51A-4.204(3) permits a child-care facility by right in retail districts, which include the RR district, and in CS and industrial districts. That is among the easier entitlements in the Dallas use table: no hearing is needed in those districts, so the prospective value as completed can be dated from permit and construction time. The state side is the licence. Child-care centres are licensed and regulated by the Health and Human Services Commission through its Child Care Regulation department, under Human Resources Code Chapter 42 and Texas Administrative Code Chapter 746. The verified record does not show the ratio and group-size rules, and we do not state them here; the study takes them from the regulator's own text for the age groups the subject will enrol, because they cap the revenue a room can earn.
The worked point is the link between licence and value. A centre's income is the number of licensed child places it fills times the tuition it charges, and the licensed capacity of the building is the ceiling on the first factor wherever the regulator's rules cap it. A study that sizes a Dallas centre therefore asks the regulator how many children the floor plan can be licensed for, tests staffing at that capacity against the payroll average above, and shows the income approach at several fill levels. The lender's appraisal will value the building as a daycare only if the use is lawful and the licence obtainable, so the as is value of a converted building without a licence is its value for its previous use. See the daycare engagement overview, the Texas daycare section and the conventional child care leaf.
Industrial feasibility study consultant in Dallas: warehousing in half the metro's establishments
General warehousing and storage in Dallas County counted 288 establishments in 2023, 50.0 percent of the metro's 576, with 31,839 paid employees and $1.59 billion of payroll, or $49,806 per employee. Half the metro's warehouse establishments in one county means the county is the market, and a Dallas industrial study can draw most of its comparables from inside it. Manufacturing is the owner-user demand beside it: 111,111 manufacturing employees with a payroll of $8.48 billion (about $76,285 per employee), and transportation and warehousing employs 151,067.
The posted 2018 text of § 51A-4.213(15) allows a warehouse by right in CS, industrial and central area districts, with residential adjacency review required in industrial districts, and does not allow it in the RR district. A buyer of an industrial building therefore checks the district before anything else: under that text a warehouse is not allowed by right in a retail district. Property tax runs through the Appraisal District. All tangible personal property in Texas is taxable unless the Constitution exempts it, so machinery and racking are rendered on the Confidential Personal Property Return by April 15, with an attached form for the business personal property exemption under House Bill 9; the Appraisal District's forms page states the exemption amount, and the study confirms it for the tax year. For large projects, the Jobs, Energy, Technology and Innovation Act allows a 10-year limitation on a school district's maintenance and operations appraised value, with job and investment minimums that rise with county population.
What the study does: it tests owner-user demand against the manufacturing and logistics employment above, treats the zoning district as the first screen on a purchase, and loads the tax stack of the parcel (county, city, school and hospital rates are set out in the tax section above) into the capitalization rate, with the personal property line for equipment kept separate. A speculative warehouse delivered into a metro where half the establishments are in one county competes with its neighbours, and the lender's appraiser will see the vacancy history in the tenant roll; the study shows what a missed lease-up does to coverage. The JETI limit is a negotiated agreement among a company, a school district and the Governor's office, not an entitlement, so no base case assumes it. See the industrial engagement overview, the Texas industrial section and the SBA 504 industrial leaf.
Published engagements: Dallas and Texas
The published engagement record has no entry located in the eleven Dallas-Fort Worth counties. It does carry Texas work. One is a ground-up franchised select-service hotel in a Sun Belt secondary metro, Texas (Hotel, SBA 504, 2026), whose mandate was whether the market would support a new one-hundred-ten-key franchised select-service hotel and clear SBA 504 underwriting. Another is a franchise gym buildout and member ramp in a growing suburb, Texas (Fitness Center & Gym, SBA 7(a), 2026), which asked whether the trade area held enough fitness demand to fill a franchised gym to a viable membership and whether the credit would service its debt through the ramp. The full list is on the Texas engagements page.
How a Dallas study is run
Scope starts from the loan: program, premise of value and the appraisal engagement, so the study answers the appraiser's question. Then come the parcel's taxing units and value history, demand from the subject's real trade area, confirmed sales, cost and income evidence, and a pro forma run to coverage and loan-to-value on the concluded value, with downside cases a credit officer can rerun. Each step is laid out in the SBA and USDA feasibility methodology; the capitalization side is covered in the income approach guide.
Dallas feasibility study questions
Why are comparable sales harder to document in Dallas?
Tax Code § 22.27 keeps voluntarily disclosed prices confidential and no transfer-tax filing exists, so the appraiser confirms each sale with a party to it and leans harder on the income evidence the study supplies. The study records each comparable's source and marks which were confirmed trades, so the lender can see how much of the grid rests on confirmed prices.
What property tax rate belongs in a Dallas pro forma?
For a commercial parcel in the City of Dallas, Dallas ISD and Dallas County, the five 2025 adopted rates sum to 2.226710 per hundred dollars of value, an effective 2.23 percent of market value. Use the parcel's own taxing units: another school district or a special district changes the total.
Does the 20 percent circuit breaker help a Dallas acquisition?
Not in the first year: the limit starts only in the tax year after the owner's first January 1 of ownership, covers property valued at $5,320,000 or less for 2026, and expires December 31, 2026. A study therefore carries the appraised value at market and treats the May 15 protest calendar as a cost control, not a built-in cap.
Which SBA district office serves Dallas County?
The SBA Dallas / Fort Worth District Office in Euless, which serves 72 counties in northeastern Texas. The appraisal and study rules themselves come from SOP 50 10 8.1 and SBA's regulations. Dallas County is on that district's county list, so a 7(a) or 504 file for a Dallas project follows its territory.
Will SBA ask for a feasibility study on a Dallas 504 loan?
It may, not must. The SOP names five triggers, from market saturation by industry type and location to highly specialized project property; lodging, car wash and other special purpose projects are the Dallas files most likely to meet them. Whether a trigger applies depends on the file's facts, and a study answers the trigger it is asked about.
How does Dallas zoning affect the appraised value?
Dallas zoning is governed by Chapter 51A, the Dallas Development Code. Variances, special exceptions and appeals go to the Board of Adjustment, a quasi-judicial body whose decisions can be appealed only to district court. The as is value reflects the property's zoning designation, so a project that needs relief carries entitlement risk until the board rules.
What hotel occupancy tax applies in Dallas?
A Dallas room carries the state's 6 percent, the city's 7 percent and a further 2 percent venue hotel tax, 15 percent in total on the fiscal 2025 rates the city reported to the Comptroller. Guests staying at least 30 consecutive days are exempt as permanent residents.
Is self-storage allowed by right in Dallas?
Under the 2018 text of § 51A-4.213(7) posted by the city, a mini-warehouse needs a specific use permit in the RR (Regional Retail) district and is allowed by right in CS and industrial districts. The current code was not reachable to us, so a study confirms the section and the subject parcel's district before relying on it.
How long does a Texas self-storage lien sale take?
The tenant has until the 14th day after delivery of the notice of claim to pay, and the sale cannot occur before the 15th day after the sale notice is first published. That is at least 29 days from notice to sale, which a study uses as the floor of the delinquency timeline.
When must Dallas businesses render personal property?
The Dallas Central Appraisal District set April 15, 2026 as the business personal property rendition date, on its Confidential Personal Property Return. Under Tax Code § 22.23 the chief appraiser must extend the date to May 15 on a written request.
Counties and cities served in the Dallas-Fort Worth metro
Under the July 2023 OMB delineation, the Dallas-Fort Worth-Arlington metropolitan statistical area takes in eleven counties, and studies cover projects in each of them:
- Collin County, Texas
- Dallas County, Texas
- Denton County, Texas
- Ellis County, Texas
- Hunt County, Texas
- Kaufman County, Texas
- Rockwall County, Texas
- Johnson County, Texas
- Parker County, Texas
- Tarrant County, Texas
- Wise County, Texas
The principal cities in the metro title are Dallas, Fort Worth and Arlington. Other places above 50,000 residents in the Vintage 2025 estimates include Plano, Irving, Garland, Frisco, McKinney, Grand Prairie and Denton. Related Texas metro pages: Austin feasibility studies and Houston feasibility studies.
Sources
- U.S. Census Bureau, U.S. Census Bureau, Building Permits Survey, metropolitan area annual 2024, accessed 17 November 2026.
- U.S. Census Bureau, U.S. Census Bureau, Building Permits Survey, metropolitan area annual 2025, accessed 17 November 2026.
- U.S. Census Bureau, U.S. Census Bureau, American Community Survey 2020-2024 5-year estimates, table B19013, accessed 17 November 2026.
- U.S. Census Bureau, U.S. Census Bureau, Vintage 2025 Population Estimates, incorporated places (sub-est2025), accessed 17 November 2026.
- U.S. Census Bureau, U.S. Census Bureau, County Business Patterns 2023, county file, accessed 17 November 2026.
- U.S. Census Bureau, U.S. Census Bureau, Vintage 2025 Population Estimates, metropolitan areas (cbsa-est2025-alldata), accessed 17 November 2026.
- Texas Legislative Council (Texas Constitution and Statutes), Tax Code Chapter 22. Renditions and Other Reports (Sec. 22.27 Confidential Information), accessed 17 November 2026.
- Texas Legislative Council (Texas Constitution and Statutes), Texas Constitution Article 8. Taxation and Revenue (Sec. 29), accessed 17 November 2026.
- Texas Legislative Council (Texas Constitution and Statutes), Tax Code Chapter 23. Appraisal Methods and Procedures (Sec. 23.01), accessed 17 November 2026.
- Texas Comptroller of Public Accounts, Valuing Property - Texas Comptroller, accessed 17 November 2026.
- Texas Legislative Council (Texas Constitution and Statutes), Tax Code Chapter 25. Local Appraisal (Sec. 25.18 Periodic Reappraisals), accessed 17 November 2026.
- Texas Legislative Council (Texas Constitution and Statutes), Tax Code Chapter 41. Local Review (Sec. 41.44 Notice of Protest), accessed 17 November 2026.
- Texas Comptroller of Public Accounts, Appraisal Protests and Appeals - Texas Comptroller, accessed 17 November 2026.
- Texas Appraiser Licensing and Certification Board, Licensing Information - TALCB, accessed 17 November 2026.
- eCFR (Office of the Federal Register), 12 CFR 34.43 Appraisals required; transactions requiring a State certified or licensed appraiser, accessed 17 November 2026.
- U.S. Small Business Administration, Dallas / Fort Worth District Office | U.S. Small Business Administration, accessed 17 November 2026.
- Dallas County Tax Office, Tax Office - Past Tax Rates (Dallas County), accessed 17 November 2026.
- Texas Comptroller of Public Accounts, Dallas County Directory - Texas Comptroller, accessed 17 November 2026.
- City of Dallas Board of Adjustment, Board of Adjustment Annual Report FY2024-25 (City of Dallas), accessed 17 November 2026.
- Office of the Federal Register (eCFR); rule issued by the U.S. Small Business Administration, eCFR :: 13 CFR 120.160 -- Loan conditions., accessed 17 November 2026.
- U.S. Small Business Administration, SOP 50 10 8.1, Lender and Development Company Loan Programs, accessed 17 November 2026.
- Office of the Federal Register (eCFR); rule issued by the Federal Deposit Insurance Corporation, eCFR :: 12 CFR 323.3 -- Appraisals required; transactions requiring a State certified or licensed appraiser., accessed 17 November 2026.
- OCC, Federal Reserve, FDIC, OTS and NCUA, published in the Federal Register, Interagency Appraisal and Evaluation Guidelines (75 FR 77450, December 10, 2010), accessed 17 November 2026.
- Office of the Federal Register (eCFR); rule issued by USDA Rural Development, eCFR :: 7 CFR Part 5001 -- Guaranteed Loanmaking and Servicing Regulations, accessed 17 November 2026.
- Office of the Federal Register (eCFR); rule issued by the Office of the Comptroller of the Currency, eCFR :: 12 CFR Part 34 Subpart C -- Appraisals, accessed 17 November 2026.
- Texas Secretary of State (Texas Register), publishing Texas Health and Human Services Commission rules, Texas Register, September 4, 2026, Proposed Rules, Title 26 Health and Human Services (HHSC proposed amendments to 26 TAC Chapter 553, Licensing Standards for A, accessed 18 November 2026.
- Texas Alcoholic Beverage Commission, TABC Licensing Fees: Two-Year Fees (fees effective 9/1/21), accessed 18 November 2026.
- Texas Comptroller of Public Accounts, Jobs, Energy, Technology and Innovation Act (JETI), accessed 18 November 2026.
- Texas Comptroller of Public Accounts, Gasoline Tax, accessed 18 November 2026.
- Texas Comptroller of Public Accounts, Diesel Fuel Tax, accessed 18 November 2026.
- Texas Comptroller of Public Accounts, Hotel Occupancy Tax, accessed 18 November 2026.
- Texas Comptroller of Public Accounts, Hotel Occupancy Tax Frequently Asked Questions, accessed 18 November 2026.
- Texas Legislative Council (Texas Legislature), Texas Property Code, Chapter 92, Sec. 92.103 Obligation to Refund, accessed 18 November 2026.
- Texas Legislative Council (Texas Legislature), Texas Health and Safety Code, Chapter 762. Campground Safety, accessed 18 November 2026.
- Texas Legislative Council (Texas Constitution and Statutes), Texas Property Code Chapter 59. Self-Service Storage Facility Liens, accessed 18 November 2026.
- Texas Workforce Commission, Texas Minimum Wage Law, accessed 18 November 2026.
- eCFR (Office of the Federal Register), 29 CFR 531.50 Statutory provisions with respect to tipped employees, accessed 18 November 2026.
- Texas Comptroller of Public Accounts (data.texas.gov), Local Hotel Occupancy Tax Reporting 2025 (dataset er34-v24h), accessed 18 November 2026.
- Texas Comptroller of Public Accounts, City Sales and Use Tax rates, accessed 18 November 2026.
- Dallas Central Appraisal District, Dallas Central Appraisal District home page, accessed 18 November 2026.
Primary research: 2026 Feasibility Methodology Atlas.