Feasibility Study Methodology Navigator for SBA and USDA Loans

    Choose the loan programme, the transaction, the asset class and the loan amount. The navigator tells you whether a feasibility study is required, may be required or is customary on that file, which other reports the programme expects, the eligibility questions a reviewer will raise, the components the study must cover and the method each section should follow. Every answer names its source and states how firm that source is.

    $4,500,000

    Feasibility study

    Required

    A feasibility study is required on these facts.

    Guaranteed loan over $1,000,000 to a new business

    A feasibility study by an independent qualified consultant acceptable to the Agency is required. The Agency sets the scope according to the complexity of the project and the borrower.

    • 7 CFR 5001.306(a)(3)(i) Regulation

    Why this borrower counts as a new business

    USDA treats as new a business operating less than one full year, a business that has not reached full operational capacity or stable operations, and a new enterprise or affiliate moving or expanding into a new location involving new market or labour areas.

    • 7 CFR 5001.3 Regulation

    Eligibility and programme checks

    Check before ordering

    Rural area test

    The project must be in a rural area: outside any city or town of more than 50,000 inhabitants and outside the urbanised area contiguous and adjacent to it. Confirm the site on USDA's property eligibility map before commissioning a study.

    • 7 CFR 5001.3 Regulation

    Other reports the file needs

    Appraisal

    Real estate appraisals must not be more than one year old. Construction appraisals report both the as-is value and the prospective value on completion.

    • 7 CFR 5001.203 Regulation

    Financial test

    Coverage standard

    Part 5001 sets no numeric minimum coverage ratio. The lender must provide a global historical and projected coverage analysis where affiliates or guarantors are involved, and projections must run through at least two years of stable operations with assumptions and a pro forma closing balance sheet.

    • 7 CFR 5001.202 Regulation
    • 7 CFR 5001.303(b)(4)(iii) Regulation

    Equity

    Minimum equity

    Minimum 20 per cent balance sheet equity for a new business, and 25 per cent where the guarantee is issued before construction is complete. The Agency may require more on a higher-risk loan, weighing industry concentration and the strength of the feasibility study.

    • 7 CFR 5001.105(d) Regulation

    The five components the study is organised around

    Appendix A to subpart D of 7 CFR Part 5001 requires these five components, plus an executive summary, the consultant's recommendation and a statement of qualifications. The factor list is published only as images in the electronic Code of Federal Regulations and should be read from the Federal Register text of the 2020 final rule.

    • Economic feasibility

      Inputs, contracts, environmental risk, cost relative to benefit, and the project's economic impact.

    • Market feasibility

      Market area, demand, competition, customers and sales projections.

    • Technical feasibility

      Site, technology, design and construction, transport and labour, built on verifiable data.

    • Financial feasibility

      Projections and assumptions, cash flow, coverage and sensitivity analysis.

    • Management feasibility

      Team, experience, continuity and organisation.

    Method by section, and the reviewer's test

    Sections that carry the most weight on this file are listed first.

    1. Property and project definition

      Priority on this file

      Analyse the legal, physical and locational attributes of the site and improvements, and state the building programme precisely (rooms, units, sites, bays or square feet), tied to the user each element serves.

      Reviewer's test: Does the project as designed match the market it claims to serve, and can it legally and physically be built as described?

    2. Market area delineation

      Priority on this file

      Draw the market area from evidence of where customers come from (customer origin data, demand generators, drive times, competitive boundaries), not from a radius alone, and use the same area for demand and supply.

      Reviewer's test: Is the boundary evidenced and applied consistently to demand and supply?

    3. Demand analysis

      Priority on this file

      Use fundamental analysis: count the households, businesses, vehicles or room nights that generate demand, segment them, and project them to the stabilisation year with sourced growth assumptions.

      Reviewer's test: Can every demand figure be traced to a source and recomputed, and does the forecast reach stabilisation?

      Model demand by segment and season. On SBA files, evidence the share of revenue from stays of 30 days or less.

    4. Supply analysis

      Priority on this file

      Verify every competitor directly, then count proposed, approved and under-construction projects weighted by probability, and account for removals.

      Reviewer's test: Have competitors been verified and the pipeline counted rather than ignored?

    5. Residual demand, capture and penetration

      Priority on this file

      Subtract the demand absorbed by existing and future supply, then compare the subject's projected share with its fair share of competitive supply, and justify any share above fair share with evidence.

      Reviewer's test: Is the projected share at or below fair share, and if above, what supports the premium?

    6. Absorption and ramp-up

      Priority on this file

      Support the ramp with the observed pace of comparable openings, cross-checked against residual demand, measured to stabilised occupancy rather than 100 per cent, and fund the shortfall before stabilisation.

      Reviewer's test: Is the stabilisation date evidenced and the ramp funded?

    7. Revenue: pricing by comparison

      Priority on this file

      Set rates and rents from adjusted comparables on an effective basis, net of concessions, and grow them at rates the segment has actually achieved.

      Reviewer's test: Is every rate supported by adjusted comparables, and is growth evidenced?

    8. Coverage, break-even and sensitivity

      Priority on this file

      Compute coverage on net operating income after reserves and all financing costs, state break-even occupancy or volume, and run joint sensitivities: occupancy and rate together, cost increases, and interest rate rises.

      Reviewer's test: Does coverage survive a plausible downside?

    9. Value against cost

      Priority on this file

      Compare yield on cost (stabilised net operating income divided by total project cost) with the market capitalisation rate, and reconcile the study's income with the appraisal's.

      Reviewer's test: Is value on completion at or above total cost, and does the study's income reconcile with the appraisal?

    10. Technical, economic and management feasibility

      Priority on this file

      Address technology, site and construction risk; inputs, contracts, environmental risk and economic impact; and the operator's record, structure and qualifications.

      Reviewer's test: Are these sections substantive rather than headings?

    11. Opinion and conditions

      Priority on this file

      Conclude feasible, not feasible, or feasible subject to specific and checkable conditions, and disclose the date of the data and the preparer's qualifications and independence.

      Reviewer's test: Does the study say plainly whether the project works?

    12. Operating expenses

      Reconcile each material line to the operator's budget, comparable operating statements and published benchmarks, and include a management fee, replacement reserves, reassessed taxes and current insurance.

      Reviewer's test: Does every material expense fall within a benchmarked range?

    Rules current at 1 October 2026. Each source is marked by its basis: regulation, agency or examiner guidance, lender practice, or reported and awaiting confirmation against the published text. The navigator applies published rules to the facts entered and does not replace the lender's credit policy, the Agency's discretion or legal advice.

    How the navigator classifies a file

    The navigator sorts every file into one of four outcomes. Required means a regulation mandates a study on the facts entered. May be required means the rule gives the agency or the lender discretion to ask for one. Customary means no rule requires a study but lenders routinely order one, or examiner guidance expects the market support a study provides. Not typically required means the file is normally underwritten on operating history.

    The distinction matters because it is often misstated. Only USDA's guaranteed loan programmes contain a dollar-triggered study requirement written into regulation. SBA's rules allow a study to be required without setting a threshold or a content standard, and bank regulators expect market and absorption support on construction lending without prescribing a study by name. Advice that describes an SBA feasibility study as mandatory is describing lender practice, not the rule.

    USDA Business and Industry guaranteed loans

    Under 7 CFR 5001.306(a)(3)(i), a guaranteed B&I loan greater than $1,000,000 to a new business requires a feasibility study by an independent qualified consultant acceptable to the Agency, with the scope set by the Agency according to the complexity of the project and the borrower. The definition of a new business in 5001.3 is wider than many borrowers expect. It covers a business in operation for less than one full year, a business that has operated longer but has not reached full operational capacity or stable operations, and a new enterprise or affiliate of an existing business moving or expanding into a new location involving new market or labour areas. A newly formed entity developing a hotel or a processing plant is a new business, whatever its sponsor's track record.

    Below $1,000,000, or for an existing business, the study is discretionary. The Agency may require one where the lender's analysis is not sufficient to establish technical feasibility or economic viability, or where the project will significantly affect an existing business and its historic cash flow, and under 5001.303(c)(4) it may require one at any size where it cannot determine a basis for repayment from the five feasibility components. Applications of $600,000 or less may use a streamlined process if the Agency finds the lender's analysis sufficient. Projects that include a renewable energy system or other integrated processing equipment need a technical report, which can sit in the study's technical section.

    The financial standard is stated as a process rather than a number. Part 5001 sets no minimum debt service coverage ratio. The lender must provide a global historical and projected coverage analysis where affiliates or guarantors are involved, and projections must run through at least two years of the project operating at full capacity or stable operations, with assumptions and a pro forma closing balance sheet. Minimum equity is 10 per cent of the balance sheet for an existing business and 20 per cent for a new business, rising to 25 per cent where a new business's guarantee is issued before construction is complete. The Agency may require more on a higher-risk loan, and the factors it may weigh include the strength of the feasibility study.

    USDA Community Facilities

    Every Community Facilities guarantee requires a financial feasibility report prepared by a qualified firm or individual acceptable to the Agency, under 7 CFR 5001.304. The report comes in two tiers. A financial feasibility analysis, which the lender may prepare, is available for guaranteed loans of $25 million or less to existing community facilities, loans secured by general obligation bonds or other tax-supported income, and borrowers whose audited statements for the last three years show the ability to pay all existing and new debt service. Every other guarantee needs a financial feasibility study with an examination opinion under AICPA attestation standards, prepared by a firm carrying professional liability insurance. A separate feasibility study is required for guaranteed loans greater than $1,000,000 to a new entity or an entity conducting a new activity, and may be required below that amount. Projections for assisted living, skilled nursing and similar residential facilities must be based on no more than 90 per cent occupancy.

    For direct loans and grants, 7 CFR 1942.17(h) expects a financial feasibility report from every applicant, prepared by a qualified party without a direct interest in the facility's management or construction where the applicant is new or has not operated this type of facility. USDA's 2018 guidance on financial feasibility evaluations sets three levels of report and notes that for loans under $500,000 an analysis without an examination opinion will likely be appropriate. For larger files its decision tree weighs loan size, security, and whether the applicant meets the five-year track record criteria, which include debt service coverage of at least 1.1.

    USDA Rural Energy for America Program

    REAP guaranteed loans call for a feasibility study only for renewable energy system projects, and only when the lender or the Agency deems it necessary, under 7 CFR 5001.307. The technical report is required on every project and scales with total project cost: a short-form report at $80,000 or less, a full energy efficiency report for improvements above $80,000, an intermediate report for renewable energy systems above $80,000 and below $200,000, and a full report at $200,000 and above. Some technologies, such as anaerobic digesters and biomass, need the full report at any cost.

    REAP grants are a different matter in 2026. USDA's programme guidance of 31 March 2026 states that no further grant awards will be made until new regulations take effect, while guaranteed loans continue, and a Federal Register notice of 15 April 2026 rescinded the grant funding notice covering fiscal years 2025 to 2027. The grant-side study trigger for renewable energy projects of $200,000 and above should be confirmed against the current rule before reliance, because earlier text made the study mandatory and the current wording is reported as discretionary.

    SBA 7(a) and 504

    SBA's regulation is permissive. Under 13 CFR 120.160(b), SBA may require a feasibility study, and nothing sets a threshold or a content standard. In practice lenders order studies where projections carry the repayment case: start-ups, ground-up construction, expansions that change the scale of a business, and special-purpose properties whose collateral value depends on the business. In the 504 programme the minimum borrower contribution rises from 10 per cent to 15 per cent for a business that has operated two years or less or for a limited or single-purpose building, and to 20 per cent where both apply, under 13 CFR 120.910.

    SOP 50 10 8.1, effective for loans receiving an SBA loan number on or after 1 October 2026, changes the role of a study on business acquisitions. As reported by the lending industry, its new Appendix 15 tests coverage on changes of ownership against historical or adjusted historical earnings, at 1.25x for initial acquisitions and owner buyouts and 1.15x for business expansions, and does not allow projections to be relied on to meet it. A quality of earnings report is reported to be required where the business purchase price is $3 million or more. On those files a study supports the durability of the earnings and the market rather than the coverage test itself. The navigator marks these items as reported until they are confirmed against the published SOP text. For acquisition files, the SBA Acquisition Report Stack Planner shows which of the four acquisition reports a file needs.

    Two eligibility rules come up often on real estate files. Passive businesses owned by developers and landlords that do not use the property are ineligible under 13 CFR 120.110(c), subject to the eligible passive company structure in 120.111. Hotels, RV parks, campgrounds and marinas are eligible, under SBA's operating procedure as reported, only where more than half of the prior year's revenue comes from guests staying 30 days or less, and start-ups must show the same in their projections.

    Conventional bank loans

    No banking regulation requires a feasibility study by name. The Interagency Appraisal and Evaluation Guidelines expect appraisals on construction and renovation loans to report the as-is value and, as applicable, prospective values on completion and on stabilisation, and they expect absorption periods to reflect market demand in light of current and expected competition. Where a lender relies on individual unit values, the Guidelines expect an independently obtained feasibility study or market analysis to show that all units can be built and sold within 12 months. The Comptroller's Handbook on commercial real estate lending says the feasibility study or the market analysis in the appraisal should support the absorption period. That is why studies are customary on ground-up and lease-up lending and uncommon on stabilised acquisitions and refinances.

    The eligibility checks the navigator runs

    Alongside the study outcome, the navigator raises the questions a reviewer is likely to ask first. For USDA programmes it reminds you that the project must sit in a rural area, outside any city or town of more than 50,000 inhabitants and outside the urbanised area contiguous to it, and that golf courses, racetracks, speculative real estate and primarily commercial rental property without control over tenants are ineligible under 7 CFR 5001.115. For Community Facilities it flags commercial enterprises, which the programme does not finance. For SBA it flags passive real estate, apartments and mobile home parks, the lodging revenue test and the 7(a) maximum loan amount. For B&I it flags loans above the programme maximum. Where the navigator cannot see a fact that changes the answer, such as whether a site is rural, it raises the question rather than assuming the answer.

    The five components every study is organised around

    USDA's definition of a feasibility study names five components: economic, market, technical, financial and management feasibility, with the detail set out in Appendix A to subpart D of 7 CFR Part 5001. The appendix also asks for an executive summary, the consultant's recommendation and a statement of qualifications. Its factor list is published only as images in the electronic Code of Federal Regulations and should be read from the Federal Register text of the 2020 final rule. SBA and bank regulators prescribe no structure, and lender-grade studies on those programmes follow the same five-part organisation because it is the one reviewers recognise.

    From requirement to method

    Knowing that a study is required says nothing about how to prepare it. The second half of the navigator lists twelve method sections, from the property and market area through demand, supply, capture, absorption, pricing, expenses, coverage and value, and places the sections that carry the most weight on your file first. Each comes with the test a credit officer or Agency reviewer will apply. The full method, with the professional standards behind each section, is set out in our guide to feasibility study methodology for SBA and USDA loans.

    What the navigator does not do

    The navigator applies published rules to the facts you enter. It does not replace the lender's credit policy, the Agency's discretion or legal advice, and a lender can always ask for more than the rule requires. Rules are current at 1 October 2026. Items drawn from SBA's operating procedure are marked as reported, because the procedure is published as a word-processing document whose text should be checked directly, and the Appendix A factor list should be read from the Federal Register images.

    Questions

    Is a feasibility study required for an SBA loan?

    No SBA rule requires one. Under 13 CFR 120.160(b), SBA may require a feasibility study, and nothing sets a threshold or a content standard. Lenders customarily order one for start-ups, ground-up construction, expansions and special-purpose properties.

    When does USDA require a feasibility study for a B&I loan?

    For guaranteed loans greater than $1,000,000 to a new business, under 7 CFR 5001.306(a)(3)(i). Below that amount, or for an existing business, the Agency may require one where the lender's analysis does not establish feasibility.

    What counts as a new business for USDA?

    A business in operation for less than one full year, a business that has not reached full operational capacity or stable operations, or a new enterprise or affiliate moving or expanding into a new location involving new market or labour areas, as defined in 7 CFR 5001.3.

    Does every Community Facilities loan need a feasibility study?

    Every Community Facilities guarantee needs a financial feasibility report. A separate feasibility study is required for guaranteed loans greater than $1,000,000 to a new entity or an entity conducting a new activity. Direct loan and grant applicants are expected to provide a financial feasibility report.

    Are REAP grants available in 2026?

    USDA has stated that REAP will not make further grant awards until new regulations take effect. REAP guaranteed loans continue to be accepted.

    Does a feasibility study replace historical coverage on an SBA acquisition?

    No. Under SOP 50 10 8.1, as reported by the lending industry, coverage on changes of ownership is tested on historical or adjusted historical earnings and projections cannot be relied on to meet it. On those files a study supports the durability of the earnings and the market.

    Can I share or save a result?

    Yes. The page address updates as you change the inputs, so copying the link shares the exact scenario, and the print button saves the result as a PDF.

    More free tools: All feasibility tools

    Related: SBA feasibility study, USDA feasibility study, feasibility study consultant, 7 CFR Part 5001 Handbook, SOP 50 10 8.1, when the study is waived, who is qualified, deficiency letters, delivered engagements