Power and Capacity: The Binding Constraint
A data center is measured in megawatts of power, not square feet, and power is almost always the binding constraint. The study sizes the critical IT load, the power the computing equipment draws, then derives the total facility power by multiplying it by the power usage effectiveness, or PUE, which captures the additional power for cooling and overhead. The central diligence task is the utility interconnection: confirming the substation and transmission capacity, the utility's commitment, and the energization schedule, because grid connection in major markets commonly runs several years and is the single most important variable in whether the project is feasible at all. A documented utility commitment with a financeable energization date is treated as a condition, not an assumption.
What the power picture looks like in 2026
In PJM, the 2025/2026 capacity auction cleared at $269.92 per MW-day against $28.92 a year earlier, and each of the next three auctions cleared at its price cap: $329.17 for 2026/2027, $333.44 for 2027/2028 and $325.00 for 2028/2029. The 2027/2028 and 2028/2029 auctions were the first in which the region fell short of its reliability requirement. JLL reports that grid-connection waits in primary markets can exceed four years.
In Texas, ERCOT reported about 410 GW of large-load interconnection requests as of March 26, 2026, roughly 87 percent of them data centers, and is moving to batch studies. Senate Bill 6 (2025) sets interconnection and curtailment standards for loads of 75 MW or more, which the Public Utility Commission of Texas is implementing. In Virginia, regulators created a new rate class for Dominion customers of 25 MW or more, effective January 1, 2027, with minimum bills of 85 percent of contracted transmission and distribution demand and 60 percent of generation demand. Federal regulators are also acting: FERC ordered PJM to address co-located load in December 2025 and in June 2026 directed all six regional grid operators to revise or justify their large-load interconnection rules.
Data centers used 4.4 percent of U.S. electricity in 2023 and could use 6.7 to 12 percent by 2028 (Lawrence Berkeley National Laboratory for the U.S. Department of Energy). Our studies treat the deliverable megawatts, the energization date, the tariff and the required collateral as conditions to verify, and we test on-site or behind-the-meter generation where the project proposes it.