Data Center Feasibility Study

    Power-first market and financial feasibility for colocation, wholesale, hyperscale build-to-suit and AI data center developments, prepared for developers, construction lenders, debt funds and institutional investors, with a USPAP appraisal available in the same engagement.

    By Robert Mitchell, MAI, SRA, AI-GRS, Founder & Principal Appraiser · Last reviewed October 20, 2026

    Request a Consultation

    What a data center feasibility study decides

    Whether the site can get the power it needs on a financeable schedule, fill or hold its capacity at market rent, and earn a yield on cost wide enough over the stabilized cap rate to justify construction and lease-up risk. Power comes first: a site with land, fiber and a tenant still fails if the utility cannot deliver the megawatts when the lease requires them. Most data centers are financed through construction loans, permanent debt, CMBS, asset-backed securitization and private capital, not SBA or USDA programs.

    What Is a Data Center Feasibility Study?

    A data center feasibility study evaluates whether a proposed facility can secure power, achieve its lease-up or hold its credit tenant, and earn an adequate return. Data centers are measured in megawatts of critical IT load, not square feet, so the analysis uses per-megawatt and per-kilowatt metrics for cost, rent and value.

    Demand has outrun supply. Vacancy across CBRE's eight primary North American markets fell to a record-low 1.4 percent in the first half of 2026, and JLL reports that North American vacancy has held near 1 percent for a third consecutive year despite record construction. Our analysis addresses the variables that decide viability: power availability and the interconnection path, fiber connectivity, cooling design, entitlement risk, and lease economics by requirement size and structure.

    The 2026 data center market at a glance

    CBRE and JLL measure different market universes, CBRE's eight primary markets and JLL's full North American market including frontier markets, so each figure below names its source and date.

    MeasureFigureSource and date
    Primary-market vacancy1.4%, a record low (1.6% a year earlier)CBRE, H1 2026
    North American vacancyAbout 1% for a third consecutive yearJLL, Midyear 2026
    Under construction, primary markets7,481 MW, up 24.8% year over yearCBRE, H1 2026
    Preleased share of that construction80.4% (74.3% a year earlier)CBRE, H1 2026
    Under construction, North AmericaMore than 66 GW, 77% of it in frontier marketsJLL, Midyear 2026
    Net absorption, primary markets1,456 MW in six monthsCBRE, H1 2026
    Northern Virginia4,496.5 MW of inventory at 0.2% vacancyCBRE, H1 2026
    Asking rent, 250 to 500 kW requirementAbout $196 per kW per month at year-end 2025, up a further 4.3% in H1 2026CBRE, H2 2025 and H1 2026
    Asking rent, larger blocks$157 (1 to 5 MW), $144 (5 to 20 MW) and $129 (over 20 MW) per kW per monthJLL, Midyear 2025
    All-in development cost$17.6 million per MW on average for the most modern greenfield facilities, excluding chips and GPUsCushman & Wakefield, 2026 Development Cost Guide
    SecuritizationAbout $27 billion of data center ABS and CMBS issued in 2025KBRA
    PJM capacity price$28.92 per MW-day (2024/25) to $269.92 (2025/26), then three auctions at the price capPJM auction reports
    Investor viewPower availability ranked the top industry challenge for three consecutive yearsCBRE 2026 Investor Intentions Survey

    For the longer market analysis, see Data Center Feasibility: Power, Demand, and the AI Infrastructure Supercycle.

    What a Data Center Feasibility Study Is, and Who Relies on It

    A data center feasibility study is a forward-looking analysis of whether a proposed facility can secure the power it needs, absorb its capacity or hold its tenant, and earn a development yield wide enough to justify the construction risk. Data centers are large, capital-intensive, power-driven real estate financed through construction and bridge loans, permanent debt, CMBS, asset-backed securitization, private credit and private equity, project finance and sale-leasebacks. The study is built for the files of construction lenders, debt funds, institutional equity, credit committees and rating-agency-driven take-outs.

    SBA and USDA eligibility

    Most data center projects are not SBA-eligible. SBA 7(a) loans are capped at $5 million and 504 debentures at $5 million ($5.5 million for qualifying manufacturing or energy projects). The borrower must be a small business (for data processing and hosting, NAICS 518210, average annual receipts of $40.0 million or less) and must occupy the property: 51 percent of an existing building or 60 percent of new construction. Developers and landlords who lease to others are ineligible passive businesses. The narrow exception is a small owner-operator, such as a regional colocation or managed-hosting company, buying or building a facility it will run itself; confirm eligibility with your SBA lender.

    USDA Business and Industry guarantees are capped at $25 million per borrower, so they can fit a small rural edge or enterprise facility but not a campus. Where a B&I guarantee over $1 million to a new business applies, our study addresses all five USDA feasibility components required by 7 CFR 5001.306.

    Power and Capacity: The Binding Constraint

    A data center is measured in megawatts of power, not square feet, and power is almost always the binding constraint. The study sizes the critical IT load, the power the computing equipment draws, then derives the total facility power by multiplying it by the power usage effectiveness, or PUE, which captures the additional power for cooling and overhead. The central diligence task is the utility interconnection: confirming the substation and transmission capacity, the utility's commitment, and the energization schedule, because grid connection in major markets commonly runs several years and is the single most important variable in whether the project is feasible at all. A documented utility commitment with a financeable energization date is treated as a condition, not an assumption.

    What the power picture looks like in 2026

    In PJM, the 2025/2026 capacity auction cleared at $269.92 per MW-day against $28.92 a year earlier, and each of the next three auctions cleared at its price cap: $329.17 for 2026/2027, $333.44 for 2027/2028 and $325.00 for 2028/2029. The 2027/2028 and 2028/2029 auctions were the first in which the region fell short of its reliability requirement. JLL reports that grid-connection waits in primary markets can exceed four years.

    In Texas, ERCOT reported about 410 GW of large-load interconnection requests as of March 26, 2026, roughly 87 percent of them data centers, and is moving to batch studies. Senate Bill 6 (2025) sets interconnection and curtailment standards for loads of 75 MW or more, which the Public Utility Commission of Texas is implementing. In Virginia, regulators created a new rate class for Dominion customers of 25 MW or more, effective January 1, 2027, with minimum bills of 85 percent of contracted transmission and distribution demand and 60 percent of generation demand. Federal regulators are also acting: FERC ordered PJM to address co-located load in December 2025 and in June 2026 directed all six regional grid operators to revise or justify their large-load interconnection rules.

    Data centers used 4.4 percent of U.S. electricity in 2023 and could use 6.7 to 12 percent by 2028 (Lawrence Berkeley National Laboratory for the U.S. Department of Energy). Our studies treat the deliverable megawatts, the energization date, the tariff and the required collateral as conditions to verify, and we test on-site or behind-the-meter generation where the project proposes it.

    Site Selection and Infrastructure Due Diligence

    Site feasibility for a data center turns on a specific set of infrastructure factors beyond the land itself. Power availability and the interconnection timeline come first. Then fiber and network connectivity, since a data center must connect to the networks and cloud on-ramps its tenants need; water availability for cooling, which can be a constraint in arid markets; latency to population and cloud nodes; zoning and land; and the tax incentive environment, since many states offer sales-and-use tax exemptions on equipment and property tax abatements that materially affect the economics. The study assesses each, because a site can have ample land and fail on power, water, or connectivity.

    Incentives and entitlements are moving. Arizona paused its data center sales tax exemption for three years from July 1, 2026, Washington narrowed its exemptions in 2026, and several other states have paused or limited incentives. Counties are imposing moratoria: Larimer County, Colorado extended its moratorium to February 25, 2027; Manatee County, Florida approved a 12-month moratorium in October 2026; Calvert County, Maryland adopted a six-month pause on data center site plans. JLL now ranks community acceptance as one of the industry's greatest challenges. Our studies confirm the incentive and zoning status of the specific site rather than assuming the state's headline program applies.

    Market Supply and Demand and Absorption

    For a multi-tenant facility, the study analyzes the market in megawatts: inventory, vacancy, absorption and the construction pipeline, against demand from artificial intelligence, cloud and enterprise computing. CBRE reports that 80.4 percent of the 7,481 MW under construction in its primary markets was preleased in the first half of 2026, leaving less than 1,500 MW, about six months of demand, available. Atlanta now leads primary markets in construction with 2,882 MW underway. Pre-leasing is concentrated in hyperscale demand, so a speculative or partially pre-leased build still carries lease-up risk. The study models an absorption curve to stabilization rather than assuming instant fill.

    Lease and Revenue Modeling

    Data center revenue is built from the IT load and a price per kilowatt per month, and the study shows the math: the critical IT load in kilowatts, times the rate per kilowatt, times twelve, gives the annual revenue. The structure varies by model. Powered shell and wholesale colocation deliver a building and power for the tenant to fit out, at a lower rent. Turnkey colocation delivers fully fitted space sold by the rack or kilowatt, at a higher rent. Hyperscale build-to-suit is a single tenant on a long-term triple-net lease at the lowest per-unit pricing. The study models the relevant structure, the escalations, the lease term, and the tenant credit, because the revenue and the risk differ sharply across the three.

    Rent depends on requirement size. CBRE's average asking rate for a 250 to 500 kW requirement in primary markets was about $196 per kW per month at year-end 2025 and rose another 4.3 percent in the first half of 2026, while JLL's Midyear 2025 report showed $157 for 1 to 5 MW, $144 for 5 to 20 MW and $129 for requirements over 20 MW. A study that applies a small-requirement rate to a multi-megawatt lease overstates revenue.

    Development Cost and the Yield-on-Cost Test

    A data center development is judged on the development spread, the gap between the yield on total project cost and the cap rate the stabilized asset would trade at. Cost is stated per megawatt of critical IT load, and the scope must be named. Cushman & Wakefield's 2026 Data Center Development Cost Guide puts average all-in greenfield cost for the most modern facilities at $17.6 million per MW, excluding chips and GPUs, up 21 percent per MW since its late-2024 edition; costs range widely by market and design, with fully redundant builds at the top. Construction-only benchmarks are lower, about $9.5 million per MW in Dallas to $13.3 million in Silicon Valley in Turner & Townsend's 2025 to 2026 index. Electrical and mechanical systems are most of the cost and the building shell a small part. The yield on cost is stabilized net operating income divided by total project cost, and a development that cannot clear a minimum spread over the market cap rate does not justify the risk.

    TestCalculation
    Total facility powerCritical IT load x PUE
    Annual revenueIT load in kW x price per kW-month x 12
    Yield-on-costStabilized NOI / total project cost
    Development spreadYield-on-cost minus stabilized cap rate

    Capital Stack, DSCR, and Debt Yield

    The study tests the financing across the data center capital stack: the construction loan, the permanent debt, CMBS or asset-backed securitization that takes it out, and, for credit-leased assets, sale-leaseback or project finance. Leverage follows tenant credit. JLL's Midyear 2026 report says hyperscaler-leased projects borrow at spreads in the low 200 basis points and up to 85 percent of cost, while projects without a credit tenant pay roughly 200 to 300 basis points more and borrow at 70 to 80 percent of cost. Securitization has become a core take-out: KBRA counts about $27 billion of data center ABS and CMBS issued in 2025, and JLL counts $17 billion of SASB, CMBS and ABS volume in the first half of 2026. Coverage is measured by debt service coverage and debt yield, underwritten on executed leases for a credit-leased asset and on pre-leasing and absorption for a speculative build.

    Valuation and the Credit-Lease Versus Lease-Up Risk Profile

    The study frames the asset's risk and value by model. A stabilized multi-tenant colocation asset trades at a wider cap rate and carries lease-up and re-leasing risk, but offers diversification and mark-to-market rent upside. A single-tenant hyperscale asset on an investment-grade credit lease trades at a tighter, bond-like cap rate, but carries single-tenant concentration and renewal risk, with rating agencies stressing the renewal probability and assigning little or no terminal building value. Neither is strictly safer; they are different risks, and a credible study makes the trade explicit rather than treating the leased asset as simply lower-risk.

    Rating agencies make the residual risk explicit: Moody's data center ABS methodology assumes only land value remains at the bond's legal final maturity. The appraisal must therefore separate real property from the electrical, mechanical and IT equipment, distinguish leased-fee from fee-simple value for a credit-leased building, and reconcile the cost approach with the income approach for what is a special-purpose property.

    Methodology and Standard of Preparation

    The analysis follows a power-first approach: resolve the power and interconnection question, conduct the site and infrastructure due diligence, analyze the market and absorption in megawatts, model the lease-up or the credit lease, build a multi-year development pro forma with stabilized net operating income, debt service coverage, debt yield and yield on cost, and stress-test it across base and downside cases, including a dark-value case if the tenant leaves. We use recognized technical terms correctly: power usage effectiveness as defined by The Green Grid and ISO/IEC 30134-2, Uptime Institute Tier classifications (stated as Tier-designed unless certified), ANSI/TIA-942, ASHRAE TC 9.9 thermal guidelines and NFPA 70, 75 and 76. A feasibility study with no opinion of value is a consulting assignment. When an engagement includes an opinion of market value, that portion is a USPAP appraisal developed and signed by Robert Mitchell, MAI, SRA, AI-GRS, a state-certified general appraiser.

    What Our Feasibility Study Covers

    Power availability, interconnection path, energization date, tariff and collateral
    Market supply and demand in megawatts: inventory, vacancy, absorption and pipeline
    Rent by requirement size and lease structure: powered shell, wholesale, turnkey and build-to-suit
    Site due diligence: zoning, moratoria, environmental, flood, seismic and water
    Fiber routes, network density and latency
    Cooling design and power usage effectiveness assumptions
    AI and high-density workload requirements
    Development cost per MW with stated scope
    Pro forma with stabilized NOI, DSCR, debt yield, yield on cost and development spread
    Capital stack and take-out analysis, including CMBS and ABS
    Downside and dark-value cases
    Optional USPAP appraisal: as-is, as-complete and as-stabilized value

    Who Needs This Study?

    Developers planning colocation, wholesale, hyperscale build-to-suit or AI facilities

    Construction lenders, debt funds and credit committees

    Institutional investors evaluating acquisitions, joint ventures or platforms

    Issuers and advisers preparing CMBS or ABS take-outs

    Utilities, municipalities and economic development agencies assessing campus proposals

    Enterprises evaluating build-versus-lease decisions

    Our Process

    1

    Engagement & Scoping

    We define the project scope, identify key assumptions, and establish the analytical framework tailored to your property type and financing program.

    2

    Market Research & Data Collection

    Our team collects primary and secondary market data including demographics, competitive supply, demand drivers, and industry benchmarks.

    3

    Financial Analysis & Modeling

    We build detailed financial pro formas with revenue projections, operating expense rationalization, DSCR analysis, and sensitivity testing.

    4

    Report Delivery & Review

    You receive a comprehensive, lender-ready feasibility report with clear conclusions, supporting data, and a review call to discuss findings.

    Why Choose UnionMetric

    Institutional Quality

    Built for the diligence files of construction lenders, debt funds, institutional equity and rating-agency-driven take-outs, and led by an MAI appraiser who can also sign the appraisal.

    Independent & Third-Party

    We maintain strict independence from borrowers, developers, and operators to ensure unbiased conclusions.

    Nationwide Coverage

    We serve projects across all 50 states with expertise spanning every major CRE asset class.

    Engagement types and fees

    Every engagement is quoted at a fixed fee before work starts. The fee does not depend on the conclusion or on whether the financing closes.

    EngagementScopeTypical feeTypical timing
    Power-first site screenUtility and grid-operator path, tariff and collateral, queue position, entitlement and moratorium risk, go or no-go$7,500 to $15,0002 to 3 weeks
    Market and feasibility studyDemand, competitive supply, rent by requirement size, absorption, pro forma, DSCR, debt yield and sensitivities$25,000 to $60,0004 to 8 weeks
    Development underwriting and lender packageYield on cost against cap rate, capital stack, construction and lease-up, dark-value case$35,000 to $75,0005 to 8 weeks
    Campus, multi-phase or securitization supportMultiple buildings, tenant credit and renewal analysis, terminal value supportFrom $75,000Quoted
    USPAP appraisalAs-is, as-complete and as-stabilized value; leased fee or fee simpleQuoted separatelyQuoted

    What we need to start: the site address and survey, the utility correspondence or interconnection documents, the development budget, any letters of intent or leases, the financing structure and the target schedule.

    Request a Consultation

    Contact our team to discuss your project and receive a customized proposal with scope, timeline, and fee estimate.

    (214) 855-0355
    hello@unionmetricfeasibility.com

    How we verify this page

    Market figures on this page are taken from the named CBRE, JLL, Cushman & Wakefield, PJM, ERCOT and KBRA publications with their dates, and program rules are checked against 13 CFR Parts 120 and 121 and 7 CFR Part 5001. Last verified October 20, 2026.

    DateChange
    October 20, 2026Page revised: market, cost, rent and power figures re-sourced and dated; unsupported market-size and cost claims removed; SBA and USDA eligibility clarified; financing, standards and appraisal sections added.

    Related Blog Posts

    View All
    Industrial

    Data Center Feasibility: Power, Demand, and the AI Infrastructure Supercycle

    The U.S. data center market is experiencing a demand acceleration with no historical precedent in commercial real estate. National vacancy in primary markets has reached 1.4% — a figure that is not a market condition but an artifact of pre-commitment: 92% of capacity under construction is already pre-leased before delivery.

    March 27, 2026
    55 min read
    Industrial

    Modern Trends in U.S. Industrial Real Estate Development

    The U.S. industrial real estate market is navigating a decisive correction following the pandemic-era supply surge, even as structural demand forces remain firmly intact. National vacancy has more than doubled from its 2021 trough, pipeline delivery volumes have declined 52% from their 2023 peak, and rental rate growth has decelerated to its slowest pace since 2011–2012.

    March 27, 2026
    55 min read
    Industry Guides

    Rationalizing the Development Budget: How a Feasibility Study Tests Project Cost Across Seven Asset Classes

    A development budget is not a number the sponsor hands the lender. It is a hypothesis about cost that a feasibility study must test against three independent standards: completeness, benchmark evidence and the value of what gets built. This is how that test is run, line by line, for the seven asset classes that dominate SBA, USDA and community-bank construction lending in 2026.

    October 21, 2026
    59 min read

    Frequently Asked Questions