Conventional
    Data Center · Virginia · 2026

    Data Center Colocation Facility, Prince William County, Virginia

    UnionMetric prepared this Conventional feasibility study for a national commercial bank reviewing a financing request. The mandate scope and analytical conclusions are summarized below.


    The Mandate

    An institutional digital-infrastructure sponsor engaged UnionMetric to prepare a third-party feasibility study supporting a Conventional financing request for a project located in Prince William County, Virginia. Total project capitalization fell within the $5 million to $10 million band. The capital provider, a national commercial bank, required documentation consistent with current Conventional program review standards. The analytical question put to the team: whether projected lease-up to hyperscale and enterprise tenants was defensible within the submarket's power and fiber position.

    Engagement Scope

    • Primary market area defined as a 7-mile drive-time isochrone
    • Comparable supply set of 20 properties
    • Demand model framework: population and income screen
    • Financial projection horizon: seven-year
    • Site inspection completed; operator interviews where applicable
    • Documentation aligned to Conventional review standards

    Methodology Applied

    Primary Market Area

    The PMA was defined as a 7-mile drive-time isochrone from the subject site, calibrated to the demand catchment behavior typical of data center assets in Virginia. The boundary captured the population, employment, and competitive supply base relevant to the subject's operating thesis.

    Supply and Demand Reconciliation

    The comparable supply set comprised 20 properties operating within the PMA or in directly substitutable submarkets. Demand was modeled using a population and income screen approach over a seven-year horizon. The reconciliation tested whether incremental supply, including the subject, could be absorbed within the projection window without compromising stabilized occupancy assumptions.

    Capture Rate Calibration

    The subject's capture rate was calibrated against the absorption capacity of the PMA. The analysis concluded that PMA absorption capacity exceeded subject build-out by a factor of 2.1x across the projection window, with a stabilized capture rate of 3.2 percent.

    Exhibit 1: Comparable Supply Set, Virginia PMA
    [Table or chart rendered in delivered report.]
    Exhibit 2: Demand Projection Summary, seven-year Horizon
    [Table or chart rendered in delivered report.]
    Exhibit 3: Subject Capture Rate vs. PMA Absorption Capacity
    [Table or chart rendered in delivered report.]

    Analytical Conclusions

    • Submarket power availability and fiber connectivity support the projected lease-up to hyperscale and enterprise tenants.
    • Comparable colocation product in the submarket operates at stabilized occupancy above 90 percent.
    • Power and cooling design assumptions reconcile to current tenant requirements.
    • No announced competing capacity within the submarket compromises the stabilization assumption.

    Deliverable

    The delivered report ran 214 pages with 40 exhibits across nine analytical sections, plus appendices documenting comparable supply data, demographic inputs, and financial projection assumptions. The document was prepared to the documentation standards of a national commercial bank reviewing under Conventional program requirements.

    Browse related work: Conventional engagements · Data Center engagements · Virginia engagements

    Related Engagements

    ConventionalData Center

    Wholesale Colocation Data Center, Ground-Up Development in a Primary Market

    Conventional feasibility study supporting a data center project in Primary Data Center Market.

    Primary Market (Representative) | 2026
    ConventionalData Center

    Hyperscale Build-to-Suit Data Center, Credit-Lease Development

    Conventional feasibility study supporting a data center project in Emerging Hyperscale Market.

    Emerging Hyperscale Market (Representative) | 2026
    ConventionalMultifamily

    508-Unit Class A Multifamily Community, Stanislaus County, California