USDA feasibility studies by asset class
On the House Agriculture Committee testimony figures above, accommodation and food services takes roughly a third of all B&I dollars, manufacturing close to a fifth, and health care and social assistance a growing share. The paragraphs below cover the projects inside those sectors, with the program that usually finances them and what the study has to prove.
[USDA feasibility study for an RV park or campground](/services/rv-park-feasibility-study). RV parks and campgrounds sit inside the accommodation sector that leads B&I lending, and the sites that work are by definition rural: near a lake, a state or national park, a river, an event venue, or an interstate corridor between metropolitan markets. A ground-up park is almost always a new business under 7 CFR 5001.3, so a guaranteed loan above $1,000,000 triggers the 5001.306 study outright, and most lenders ask for one below that line. The study is built on the drivers that fill sites: drive-time access from the metropolitan markets that supply weekend and seasonal guests, the pull and visitation record of the destination anchor, county-level RV registrations, and the seasonality of the specific site, since a park full for fourteen weeks and empty for thirty carries a different coverage profile from one with year-round extended-stay demand. The competitive inventory is measured site by site, by type, rate and observed occupancy through the season, and revenue is modeled by transient, seasonal and extended-stay segment with ancillary income taken from comparable operations. The technical factor carries unusual weight: water, sewer or septic capacity for the site count, power to the pads, road access for large rigs, and the site-work-heavy budget where utilities, roads and pads dominate. The B&I purpose is quantified in seasonal and year-round jobs at stated wages. Where the park is a resort with cabins, a store and a restaurant, the study separates the components so the reviewer can see which one carries the coverage. Our RV park sector outlook sets the national context. Resort trailer parks and campgrounds are eligible under 7 CFR 5001.105(b)(8), with the value of any owner living quarters deducted. Tourist and recreation facilities fall under 5001.105(b)(13), and a mixed-use project needs at least 50 percent of revenue from commercial use. Newmark's 2026 North American Market Survey, as reported by BVWire on March 11, 2026, puts Class A and B going-in cap rates at 8.0 percent and Class C at 9.0 percent.
[USDA feasibility study for a wedding venue, event venue or agritourism operation](/services/wedding-venue-feasibility-study). Wedding and event venues on rural land and agritourism operations that add lodging, tasting rooms or seasonal events to a working farm are financed under B&I and, for value-added agricultural producers, alongside USDA grant programs. Almost all are new businesses. The demand method is unlike any other asset: it starts from the marriage and event count in the drive-time market, taken from state vital records and county clerk data, applies the share of events that go to venues of the subject's type and price band, tests the venue count and booking calendars of every competitor within the draw radius, and derives a defensible number of bookings per year at a defensible average contract value. Seasonality and day-of-week concentration are modeled explicitly, because a venue that books fifty Saturdays a year has fifty revenue days. The technical factor covers road access for guest volumes, parking, septic or sewer capacity for event loads, and any change-of-use permitting on agricultural land. Management is weighed heavily, because a venue's bookings track the operator's marketing and reputation more than its building. The 2026 venue economics article carries the current rate and booking evidence. Tourist and recreation facilities are eligible under 7 CFR 5001.105(b)(13), and a mixed-use operation needs at least 50 percent of revenue from commercial use; agricultural production is capped at 50 percent of the loan or $5,000,000 under 5001.105(b)(7). The Knot 2026 Real Weddings Study reports an average of 117 guests, an average reception venue cost of $12,900 and an average total cost of $34,000.
[USDA feasibility study for a rural hotel or resort](/services/hotel-feasibility-study). Hotels and resorts are the largest single use inside the sector that leads B&I lending, and the growth in average B&I loan size, from roughly $2.75 million in 2015 to roughly $8.1 million in 2024, is partly a story about projects of this scale moving into the program. A new hotel is a new business; the study is required above $1,000,000 and requested below it. Demand is built from the accepted hotel method: the competitive set defined and its supply measured in rooms, the demand segments quantified from their generators with the arithmetic shown, occupancy, ADR and RevPAR derived through ramp-up and stabilization, and franchise projections tested against the brand's own disclosures. In a rural market the competitive set is small and the demand generators few, so the study spends its effort on the durability of the two or three that carry the property: the hospital's expansion plan, the plant's shift schedule, the park's visitation trend. The technical factor addresses labor, since a 60-room hotel in a county of 15,000 draws its staff from a thin market and the wage assumption in the pro forma has to match what that market pays. See also the hotel feasibility study method. Hotels are eligible under 7 CFR 5001.105(b)(8), with the value of any owner living quarters deducted. HVS reported a Q2 2026 average hotel cap rate of 7.7 percent and an H1 2026 average of $137,000 per key (U.S. Market Pulse, August and September 2026), against a median development cost of $213,000 per room in the HVS U.S. Hotel Development Cost Survey 2026.
[USDA feasibility study for assisted living, memory care and skilled nursing](/services/assisted-living-feasibility-study). Senior care is where Community Facilities and B&I meet. A nonprofit or public body opening a rural assisted living, memory care or nursing facility uses CF, and a for-profit operator uses B&I. Either way a new facility above $1,000,000 triggers the study. Health care and social assistance has grown as a share of B&I lending in each recent year shown above, and the CF program exists for exactly this kind of essential facility. Demand is built from the age- and income-qualified population within the draw area, not the general population: the 75-plus and 85-plus cohorts projected forward, the share income-qualified for private pay or eligible under the state's Medicaid waiver, the penetration rate for the care level, and the existing and pipeline beds at every competitor within the radius with observed occupancy and rates. The financial factor models a lease-up of twelve to twenty-four months with a funded operating-deficit reserve, because care facilities lose money until they fill. The technical factor covers licensed staffing ratios against the rural labor shed, which is the binding constraint on most rural care projects, and licensure and certificate-of-need status. For a CF applicant the management factor extends to governance and financial management of the sponsoring organization, and the program purpose is stated as the essential community need: the residents who would otherwise leave the county for care. Our senior living study framework covers the demand arithmetic in full. Under 7 CFR 5001.105(b)(20), assisted living is eligible only where constant medical care is available on site; independent living is ineligible. A CF study bases projections on no more than 90 percent occupancy under 5001.304. CBRE's Senior Housing and Care Investor Survey H1 2026 (June 25, 2026) reports a Class A core assisted living cap rate of 6.5 percent.
USDA feasibility study for meat, food and value-added agricultural processing. Manufacturing is the second-largest sector in B&I lending, and processing is the use B&I was written for. The economic factor connects the plant to its supply shed: the livestock inventory or crop acreage within the haul radius from USDA National Agricultural Statistics Service data, the share the plant needs, and the producers' current outlets. The market factor tests the demand side, whether custom-exempt and retail cuts for a small plant or contracted volume for a larger one, against the executed agreements. The technical factor is the heart of the file: throughput and line design, water and wastewater capacity, Food Safety and Inspection Service inspection status, cold storage, and a labor plan for a plant that may need fifty skilled positions in a county with a thin manufacturing workforce. The financial factor models margins that swing with commodity prices, and the sensitivity section stresses input cost and yield rather than occupancy. The program purpose is quantified in plant jobs and in the producer income the plant retains in the region. For beverage and value-added producers, see our brewery and distillery feasibility studies. Cooperative value-added processing is eligible under 7 CFR 5001.105(b)(18), and local food projects may be located outside a rural area under 5001.105(b)(15). Integrated processing must use commercially available technology and show completion of two operating cycles at designed production level under 5001.105(b)(22).
REAP after October 16, 2026
USDA's REAP final rule (91 FR 62600, published October 1, 2026, effective October 16, 2026) rewrites the REAP grant regulation at 7 CFR Part 4280. It does not amend 7 CFR Part 5001, so the guaranteed loan's technical report under 5001.307(e) and its appendices are unchanged: Appendix C for energy efficiency improvements over $80,000, Appendix D for renewable energy systems over $80,000 and under $200,000, and Appendix E for renewable energy systems of $200,000 or more.
What changed for grants:
- Grants now go only to projects already built and operating, completed 12 to 24 months before the application (12 to 36 months in the first window).
- The application carries 12 months of actual production or savings data and 12 months of pre-installation utility data, and simple payback is recalculated on actual values without tax credits.
- The applicant covers at least 75 percent of project cost; grants run from $1,500 to $500,000 for renewable energy systems and $250,000 for energy efficiency improvements.
- Ground-mount solar and wind on certified cropland, solar and wind with components from a foreign-adversary country, multi-location projects, EV chargers, stand-alone storage and efficiency work in new construction are ineligible, and battery storage is capped at 120 percent of average energy use.
- Combined grant and loan applications are removed; grants and guaranteed loans are applied for separately, and combined grant and guaranteed loan funding cannot exceed 75 percent of project cost.
What it means for the guaranteed loan: the REAP guaranteed loan is now the way a project gets built, because any grant arrives at least a year after completion. Lenders underwrite the project without the grant and treat any later award as an optional paydown. Because of the 75 percent combined limit, a borrower who wants to keep a grant open sizes the guaranteed loan at 50 percent of cost or less.
What a REAP study now adds: a measurement and verification plan with revenue-grade metering; the 12-month pre-installation baseline captured before construction; production modeled with explicit degradation, availability and curtailment; the interconnection agreement, metering arrangement and any power purchase agreement; a component country-of-origin schedule; cropland screening; sizing to historical load; and a case with no grant. Solar and wind projects that did not begin construction by July 4, 2026 must be placed in service by December 31, 2027 to claim the federal 45Y and 48E credits, which sets the construction schedule the study tests.
FY2026 REAP guaranteed loan terms (91 FR 11272): 80 percent guarantee, 1.0 percent upfront fee, 0.25 percent annual retention fee. The pause on new guarantees for biodigesters and controlled environment agriculture runs through December 31, 2026. A lawsuit filed September 28, 2026 by farm and solar groups challenges USDA's solar restrictions.
[USDA feasibility study for a truck stop, travel center or rural fuel site](/insights/truck-stop-feasibility-study). Truck stops and travel centers at rural interchanges are a recurring B&I asset because their loan sizes often exceed what SBA will finance and their sites are, by location, eligible. Demand is built from state DOT counts on the interstate and the interchange ramps, the truck share of that traffic, the distance to the nearest competing full-service stop in each direction, and hours-of-service rules that set where drivers must stop. Fuel gallons, inside sales, restaurant, showers, parking and repair are modeled as separate profit centers, because a travel center's coverage usually comes from inside the building rather than from the pumps, and fuel margin volatility is stressed specifically. The technical factor covers truck parking count and circulation, fuel storage and environmental compliance, and the labor plan for a 24-hour operation in a rural county. Related work: gas station feasibility studies and truck stop operating expenses. NACS State of the Industry (April 15, 2026) reports in-store sales of $341.2 billion across 151,975 stores, with fuel at 65.0 percent of sales and 38.8 percent of gross profit.
Source: eCFR, 7 CFR 5001.105(b), 5001.304 and 5001.307, current as of October 1, 2026; market publications as dated in each paragraph.