USDA CF Feasibility Study: Volunteer Fire Station Construction, Sweetwater County, Wyoming
UnionMetric prepared this USDA CF feasibility study for a USDA Community Facilities direct program reviewing a financing request. The mandate scope and analytical conclusions are summarized below.
The Mandate
A county-level public agency engaged UnionMetric to prepare a third-party feasibility study supporting a USDA CF financing request for a project located in Sweetwater County, Wyoming. Total project capitalization fell within the over $100 million band. The capital provider, a USDA Community Facilities direct program, required documentation consistent with current USDA CF program review standards. The analytical question put to the team: whether projected service demand justified the proposed facility scope and operating budget.
Engagement Scope
- Primary market area defined as a 12-mile drive-time isochrone
- Comparable supply set of 10 properties
- Demand model framework: gravity and competitive-share
- Financial projection horizon: seven-year
- Site inspection completed; operator interviews where applicable
- Documentation aligned to USDA CF review standards
Methodology Applied
Primary Market Area
The PMA was defined as a 12-mile drive-time isochrone from the subject site, calibrated to the demand catchment behavior typical of civic assets in Wyoming. The boundary captured the population, employment, and competitive supply base relevant to the subject's operating thesis.
Supply and Demand Reconciliation
The comparable supply set comprised 10 properties operating within the PMA or in directly substitutable submarkets. Demand was modeled using a gravity and competitive-share approach over a seven-year horizon. The reconciliation tested whether incremental supply, including the subject, could be absorbed within the projection window without compromising stabilized occupancy assumptions.
Capture Rate Calibration
The subject's capture rate was calibrated against the absorption capacity of the PMA. The analysis concluded that PMA absorption capacity exceeded subject build-out by a factor of 2.6x across the projection window, with a stabilized capture rate of 2.6 percent.
Analytical Conclusions
- The service area's population and demographic profile support the projected facility utilization.
- Operating-cost assumptions reconcile to comparable public-facility benchmarks.
- Funding sources are documented and reconciled to the project capital stack.
- The proposed facility scope addresses documented service-need gaps.
Deliverable
The delivered report ran 203 pages with 30 exhibits across nine analytical sections, plus appendices documenting comparable supply data, demographic inputs, and financial projection assumptions. The document was prepared to the documentation standards of a USDA Community Facilities direct program reviewing under USDA CF program requirements.
Related Engagements
Community Library and Learning Center Expansion, Monongalia County, West Virginia
USDA CF feasibility study supporting a civic project in Monongalia County.
Rural Health Clinic Expansion, Faulkner County, Arkansas
USDA CF feasibility study supporting a healthcare project in Faulkner County.
K-8 Charter School Facility, Maricopa County, Arizona
USDA CF feasibility study supporting a education project in Maricopa County.
Primary research: 2026 Feasibility Methodology Atlas.