    USDA B&I Feasibility Study: 45-Pad Glamping Resort, Garfield County, Utah

    UnionMetric prepared this USDA B&I feasibility study for a rural-focused community bank participating in USDA B&I reviewing a financing request. The mandate scope and analytical conclusions are summarized below.


    The Mandate

    An outdoor-hospitality sponsor engaged UnionMetric to prepare a third-party feasibility study supporting a USDA B&I financing request for a project located in Garfield County, Utah. Total project capitalization fell within the $50 million to $100 million band. The capital provider, a rural-focused community bank participating in USDA B&I, required documentation consistent with current USDA B&I program review standards. The analytical question put to the team: whether the projected occupancy and ADR were defensible against the regional outdoor-hospitality demand pool.

    Engagement Scope

    • Primary market area defined as a 7-mile radius
    • Comparable supply set of 25 properties
    • Demand model framework: captured-traffic and gravity model
    • Financial projection horizon: five-year
    • Site inspection completed; operator interviews where applicable
    • Documentation aligned to USDA B&I review standards

    Methodology Applied

    Primary Market Area

    The PMA was defined as a 7-mile radius from the subject site, calibrated to the demand catchment behavior typical of glamping assets in Utah. The boundary captured the population, employment, and competitive supply base relevant to the subject's operating thesis.

    Supply and Demand Reconciliation

    The comparable supply set comprised 25 properties operating within the PMA or in directly substitutable submarkets. Demand was modeled using a captured-traffic and gravity model approach over a five-year horizon. The reconciliation tested whether incremental supply, including the subject, could be absorbed within the projection window without compromising stabilized occupancy assumptions.

    Capture Rate Calibration

    The subject's capture rate was calibrated against the absorption capacity of the PMA. The analysis concluded that PMA absorption capacity exceeded subject build-out by a factor of 3.6x across the projection window, with a stabilized capture rate of 3.6 percent.

    Exhibit 1: Comparable Supply Set, Utah PMA
    [Table or chart rendered in delivered report.]
    Exhibit 2: Demand Projection Summary, five-year Horizon
    [Table or chart rendered in delivered report.]
    Exhibit 3: Subject Capture Rate vs. PMA Absorption Capacity
    [Table or chart rendered in delivered report.]

    Analytical Conclusions

    • Regional outdoor-hospitality demand supports the projected occupancy band at the proposed rate position.
    • Comparable glamping inventory within 90 miles operates above 60 percent stabilized occupancy.
    • The site's access, amenity package, and natural setting position it within the second quartile of regional comparables.
    • No announced competing inventory within the PMA threatens the assumed stabilization.

    Deliverable

    The delivered report ran 200 pages with 39 exhibits across nine analytical sections, plus appendices documenting comparable supply data, demographic inputs, and financial projection assumptions. The document was prepared to the documentation standards of a rural-focused community bank participating in USDA B&I reviewing under USDA B&I program requirements.

    Browse related work: USDA B&I engagements · Glamping engagements · Utah engagements

    Related Engagements

    USDA B&IHospitality

    16-Cabin Luxury Retreat and Wedding Venue, Park County, Montana

    USDA B&I feasibility study supporting a hospitality project in Park County.

    Montana | 2025
    USDA B&IGas Station

    Truck Stop and Convenience Retail, Lincoln County, Nebraska

    USDA B&I feasibility study supporting a gas station project in Lincoln County.

    Nebraska | 2024
    USDA B&ICold Storage

    120,000-Square-Foot Cold Storage Warehouse, York County, Pennsylvania

    USDA B&I feasibility study supporting a cold storage project in York County.

    Pennsylvania | 2025

    Engage UnionMetric for a USDA B&I feasibility study.

    Request a Consultation