SBA 7(a) Feasibility Study: 65-Site RV Park and Campground, Horry County, South Carolina
UnionMetric prepared this SBA 7(a) feasibility study for a regional SBA 7(a) lender reviewing a financing request. The mandate scope and analytical conclusions are summarized below.
The Mandate
An outdoor-hospitality operator engaged UnionMetric to prepare a third-party feasibility study supporting a SBA 7(a) financing request for a project located in Horry County, South Carolina. Total project capitalization fell within the $50 million to $100 million band. The capital provider, a regional SBA 7(a) lender, required documentation consistent with current SBA 7(a) program review standards. The analytical question put to the team: whether projected nightly and seasonal occupancy were achievable within the regional travel pattern.
Engagement Scope
- Primary market area defined as a 45-minute drive-time isochrone
- Comparable supply set of 13 properties
- Demand model framework: household formation and absorption
- Financial projection horizon: five-year
- Site inspection completed; operator interviews where applicable
- Documentation aligned to SBA 7(a) review standards
Methodology Applied
Primary Market Area
The PMA was defined as a 45-minute drive-time isochrone from the subject site, calibrated to the demand catchment behavior typical of rv park assets in South Carolina. The boundary captured the population, employment, and competitive supply base relevant to the subject's operating thesis.
Supply and Demand Reconciliation
The comparable supply set comprised 13 properties operating within the PMA or in directly substitutable submarkets. Demand was modeled using a household formation and absorption approach over a five-year horizon. The reconciliation tested whether incremental supply, including the subject, could be absorbed within the projection window without compromising stabilized occupancy assumptions.
Capture Rate Calibration
The subject's capture rate was calibrated against the absorption capacity of the PMA. The analysis concluded that PMA absorption capacity exceeded subject build-out by a factor of 2.1x across the projection window, with a stabilized capture rate of 1.5 percent.
Analytical Conclusions
- Regional RV registration and travel pattern data support the projected occupancy curve.
- Comparable parks within a 100-mile radius operate at peak-season occupancy above 85 percent.
- The amenity package and site mix position the subject within the upper quartile of regional comparables.
- No announced competing inventory within the PMA threatens the assumed stabilization.
Deliverable
The delivered report ran 120 pages with 30 exhibits across nine analytical sections, plus appendices documenting comparable supply data, demographic inputs, and financial projection assumptions. The document was prepared to the documentation standards of a regional SBA 7(a) lender reviewing under SBA 7(a) program requirements.
Related Engagements
SBA 7(a) Craft Distillery with Tasting Room and Phased Product Ramp
SBA 7(a) feasibility study supporting a brewery & distillery project in Growing Tourism Market.
SBA 7(a) Change-of-Ownership Assisted Living Reposition with Memory Care Conversion
SBA 7(a) feasibility study supporting a senior living project in Secondary Metropolitan Market.
SBA 7(a) Change-of-Ownership PIP Reposition and Re-Flag, Secondary Market
SBA 7(a) feasibility study supporting a hotel project in Secondary Market.