SBA 7(a) Feasibility Study: Express-Tunnel Car Wash, Douglas County, Colorado
UnionMetric prepared this SBA 7(a) feasibility study for a national small-business lender reviewing a financing request. The mandate scope and analytical conclusions are summarized below.
The Mandate
An independent car-wash operator engaged UnionMetric to prepare a third-party feasibility study supporting a SBA 7(a) financing request for a project located in Douglas County, Colorado. Total project capitalization fell within the over $100 million band. The capital provider, a national small-business lender, required documentation consistent with current SBA 7(a) program review standards. The analytical question put to the team: whether the projected member count and retail wash volume were supportable given PMA traffic and competitive density.
Engagement Scope
- Primary market area defined as a 7-mile radius
- Comparable supply set of 19 properties
- Demand model framework: captured-traffic and gravity model
- Financial projection horizon: ten-year
- Site inspection completed; operator interviews where applicable
- Documentation aligned to SBA 7(a) review standards
Methodology Applied
Primary Market Area
The PMA was defined as a 7-mile radius from the subject site, calibrated to the demand catchment behavior typical of car wash assets in Colorado. The boundary captured the population, employment, and competitive supply base relevant to the subject's operating thesis.
Supply and Demand Reconciliation
The comparable supply set comprised 19 properties operating within the PMA or in directly substitutable submarkets. Demand was modeled using a captured-traffic and gravity model approach over a ten-year horizon. The reconciliation tested whether incremental supply, including the subject, could be absorbed within the projection window without compromising stabilized occupancy assumptions.
Capture Rate Calibration
The subject's capture rate was calibrated against the absorption capacity of the PMA. The analysis concluded that PMA absorption capacity exceeded subject build-out by a factor of 1.5x across the projection window, with a stabilized capture rate of 1.0 percent.
Analytical Conclusions
- The site captures sufficient traffic count, road speed, and turning-movement geometry to support the projected wash volume.
- Comparable express tunnels within a 5-mile radius operate above 75,000 wash counts annually.
- The proposed unlimited-membership rate is positioned consistent with regional comparables.
- No competing tunnel under construction within a 3-mile radius threatens the lease-up curve.
Deliverable
The delivered report ran 142 pages with 45 exhibits across nine analytical sections, plus appendices documenting comparable supply data, demographic inputs, and financial projection assumptions. The document was prepared to the documentation standards of a national small-business lender reviewing under SBA 7(a) program requirements.
Related Engagements
Dual-Tunnel Express Car Wash with Self-Service Bays, Clark County, Nevada
SBA 7(a) feasibility study supporting a car wash project in Clark County.
Acquisition and Express Conversion of an In-Bay Car Wash, Secondary Metro
SBA 7(a) feasibility study supporting a car wash project in Commuter Corridor.
SBA 7(a) Craft Distillery with Tasting Room and Phased Product Ramp
SBA 7(a) feasibility study supporting a brewery & distillery project in Growing Tourism Market.