Five-Story Mixed-Use Development, Cass County, North Dakota
UnionMetric prepared this Conventional feasibility study for a institutional debt fund reviewing a financing request. The mandate scope and analytical conclusions are summarized below.
The Mandate
A regional mixed-use developer engaged UnionMetric to prepare a third-party feasibility study supporting a Conventional financing request for a project located in Cass County, North Dakota. Total project capitalization fell within the $10 million to $25 million band. The capital provider, a institutional debt fund, required documentation consistent with current Conventional program review standards. The analytical question put to the team: whether projected absorption across residential and ground-floor retail components was defensible.
Engagement Scope
- Primary market area defined as a 5-mile drive-time isochrone
- Comparable supply set of 11 properties
- Demand model framework: supply-and-demand reconciliation
- Financial projection horizon: ten-year
- Site inspection completed; operator interviews where applicable
- Documentation aligned to Conventional review standards
Methodology Applied
Primary Market Area
The PMA was defined as a 5-mile drive-time isochrone from the subject site, calibrated to the demand catchment behavior typical of mixed-use assets in North Dakota. The boundary captured the population, employment, and competitive supply base relevant to the subject's operating thesis.
Supply and Demand Reconciliation
The comparable supply set comprised 11 properties operating within the PMA or in directly substitutable submarkets. Demand was modeled using a supply-and-demand reconciliation approach over a ten-year horizon. The reconciliation tested whether incremental supply, including the subject, could be absorbed within the projection window without compromising stabilized occupancy assumptions.
Capture Rate Calibration
The subject's capture rate was calibrated against the absorption capacity of the PMA. The analysis concluded that PMA absorption capacity exceeded subject build-out by a factor of 2.8x across the projection window, with a stabilized capture rate of 2.6 percent.
Analytical Conclusions
- The PMA supports projected residential absorption at the assumed rent position.
- Ground-floor retail demand from the corridor supports the projected lease-up to credit and local tenants.
- Parking ratios and traffic-flow analysis support the assumed tenant mix.
- No competing mixed-use inventory within the PMA threatens the stabilization.
Deliverable
The delivered report ran 122 pages with 43 exhibits across nine analytical sections, plus appendices documenting comparable supply data, demographic inputs, and financial projection assumptions. The document was prepared to the documentation standards of a institutional debt fund reviewing under Conventional program requirements.
Related Engagements
508-Unit Class A Multifamily Community, Stanislaus County, California
Conventional feasibility study supporting a multifamily project in Stanislaus County.
60-Bed Memory Care Facility, Fulton County, Georgia
Conventional feasibility study supporting a senior living project in Fulton County.
180-Unit Assisted Living and Memory Care Campus, Williamson County, Tennessee
Conventional feasibility study supporting a senior living project in Williamson County.
Primary research: 2026 Feasibility Methodology Atlas.