Conventional
    Senior Living · Georgia · 2025

    60-Bed Memory Care Facility, Fulton County, Georgia

    UnionMetric prepared this Conventional feasibility study for a regional commercial bank reviewing a financing request. The mandate scope and analytical conclusions are summarized below.


    The Mandate

    A regional senior-living operator engaged UnionMetric to prepare a third-party feasibility study supporting a Conventional financing request for a project located in Fulton County, Georgia. Total project capitalization fell within the $10 million to $25 million band. The capital provider, a regional commercial bank, required documentation consistent with current Conventional program review standards. The analytical question put to the team: whether the unit mix and stabilized census assumptions were defensible against the age-and-income-qualified PMA cohort.

    Engagement Scope

    • Primary market area defined as a 10-mile drive-time isochrone
    • Comparable supply set of 28 properties
    • Demand model framework: population and income screen
    • Financial projection horizon: five-year
    • Site inspection completed; operator interviews where applicable
    • Documentation aligned to Conventional review standards

    Methodology Applied

    Primary Market Area

    The PMA was defined as a 10-mile drive-time isochrone from the subject site, calibrated to the demand catchment behavior typical of senior living assets in Georgia. The boundary captured the population, employment, and competitive supply base relevant to the subject's operating thesis.

    Supply and Demand Reconciliation

    The comparable supply set comprised 28 properties operating within the PMA or in directly substitutable submarkets. Demand was modeled using a population and income screen approach over a five-year horizon. The reconciliation tested whether incremental supply, including the subject, could be absorbed within the projection window without compromising stabilized occupancy assumptions.

    Capture Rate Calibration

    The subject's capture rate was calibrated against the absorption capacity of the PMA. The analysis concluded that PMA absorption capacity exceeded subject build-out by a factor of 2.6x across the projection window, with a stabilized capture rate of 2.7 percent.

    Exhibit 1: Comparable Supply Set, Georgia PMA
    [Table or chart rendered in delivered report.]
    Exhibit 2: Demand Projection Summary, five-year Horizon
    [Table or chart rendered in delivered report.]
    Exhibit 3: Subject Capture Rate vs. PMA Absorption Capacity
    [Table or chart rendered in delivered report.]

    Analytical Conclusions

    • The PMA's 75+ population with qualifying income exceeds the projected resident count by a meaningful absorption multiple.
    • Comparable communities within a 15-mile radius operate at stabilized occupancy above 88 percent.
    • The proposed care continuum and unit mix are consistent with the PMA's care-need distribution.
    • Announced inventory within the PMA does not threaten the assumed stabilized census.

    Deliverable

    The delivered report ran 131 pages with 31 exhibits across nine analytical sections, plus appendices documenting comparable supply data, demographic inputs, and financial projection assumptions. The document was prepared to the documentation standards of a regional commercial bank reviewing under Conventional program requirements.

    Browse related work: Conventional engagements · Senior Living engagements · Georgia engagements

    Related Engagements

    ConventionalSenior Living

    180-Unit Assisted Living and Memory Care Campus, Williamson County, Tennessee

    Conventional feasibility study supporting a senior living project in Williamson County.

    Tennessee | 2026
    ConventionalMultifamily

    508-Unit Class A Multifamily Community, Stanislaus County, California

    Conventional feasibility study supporting a multifamily project in Stanislaus County.

    California | 2025
    ConventionalMultifamily

    240-Unit Workforce Multifamily Development, Bexar County, Texas

    Conventional feasibility study supporting a multifamily project in Bexar County.

    Texas | 2026