SBA 504 Feasibility Study: Convenience Store with Fuel Station, Ada County, Idaho
UnionMetric prepared this SBA 504 feasibility study for a Certified Development Company reviewing a financing request. The mandate scope and analytical conclusions are summarized below.
The Mandate
A regional fuel and convenience operator engaged UnionMetric to prepare a third-party feasibility study supporting a SBA 504 financing request for a project located in Ada County, Idaho. Total project capitalization fell within the under $5 million band. The capital provider, a Certified Development Company, required documentation consistent with current SBA 504 program review standards. The analytical question put to the team: whether the projected fuel volume and inside-store sales were defensible against captured traffic and the competitive set.
Engagement Scope
- Primary market area defined as a 12-mile drive-time isochrone
- Comparable supply set of 20 properties
- Demand model framework: captured-traffic and gravity model
- Financial projection horizon: ten-year
- Site inspection completed; operator interviews where applicable
- Documentation aligned to SBA 504 review standards
Methodology Applied
Primary Market Area
The PMA was defined as a 12-mile drive-time isochrone from the subject site, calibrated to the demand catchment behavior typical of gas station assets in Idaho. The boundary captured the population, employment, and competitive supply base relevant to the subject's operating thesis.
Supply and Demand Reconciliation
The comparable supply set comprised 20 properties operating within the PMA or in directly substitutable submarkets. Demand was modeled using a captured-traffic and gravity model approach over a ten-year horizon. The reconciliation tested whether incremental supply, including the subject, could be absorbed within the projection window without compromising stabilized occupancy assumptions.
Capture Rate Calibration
The subject's capture rate was calibrated against the absorption capacity of the PMA. The analysis concluded that PMA absorption capacity exceeded subject build-out by a factor of 2.1x across the projection window, with a stabilized capture rate of 4.1 percent.
Analytical Conclusions
- Captured traffic from the primary intersection supports the projected per-day fuel gallons within industry benchmarks.
- Comparable convenience stores within a 5-mile radius produce inside-store sales per square foot consistent with the projection.
- The proposed fuel supply agreement margin structure reconciles to comparable dealer margins.
- No announced competing fuel pad within a 2-mile radius threatens the projected volume.
Deliverable
The delivered report ran 207 pages with 37 exhibits across nine analytical sections, plus appendices documenting comparable supply data, demographic inputs, and financial projection assumptions. The document was prepared to the documentation standards of a Certified Development Company reviewing under SBA 504 program requirements.
Related Engagements
Ground-Up Taproom-Focused Craft Microbrewery, Growing Suburb
SBA 504 feasibility study supporting a brewery & distillery project in Growing Suburb.
Ground-Up Private-Pay Assisted Living and Memory Care, Sun Belt Suburb
SBA 504 feasibility study supporting a senior living project in Sun Belt Suburb.
Ground-Up Franchised Select-Service Hotel, Sun Belt Secondary Metro
SBA 504 feasibility study supporting a hotel project in Sun Belt Secondary Metro.